Loading...
HomeMy WebLinkAboutRAW URTH DESIGNS - PDP - PDP150007 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT• •- eeeeeeeeeee® • ... .,mwwwWrom- ._. __=eeeeeeeee eeeeeeeeeeee BEST MANAGEMENT PRACTICES - STRUCTURAL SILT FENCE BARRIEF�­S­-- ... VEHICLE TRACKING PADS —ETC) FLOW BARRIEWS (WATTLES, CONCRETE WASHOUT ROCK SOCKS BARE SOIL PREPARATION—:-::��mmwmmmmm m TERRACING 7mmmmmmmm - mmemmmeeeeee VEGETATIVE —ANT 7 SEAL - D -S eeeee--eeeeee OD ®®®®®®®®®®®® Erosion and Sediment Control Escrow/Security Calculation - for-fh-e City of-Fort-Colli-ns -- ----- Project: Raw Urth Designs Disturbed Acres: 0.90 ')4 f 'F 4 t�jG Y1't'rA '^ • Y ,. y 7 x' 9 < a n n7, V:u Estimated Unit Total EROSION CONTROL BMPs Units Quantity Price Price Silt Fence L.F. 730 $3.00 $2,190.00 Rock Sock each 15 $85.00 $1,275.00 Vehicle Tracking Control Pad each 1 $1,500.00 $1,500.00 Concrete Washout each 1 $1,200.00 $1,200.00 (add all other BMPs for the site in this list) Sub -Total: $6,165.00 1.5 x Sub -Total: $9,247.50 Amount of security: $9,247.50 5 g+ i , .P`v�1 9 'f Y 'i' Y.. 7•1 l ', �a Total Acres x Price/acre: $1,080.00 Unit Price of Seeding per acre: $1,200.00 Sub -Total: $1,080.00 1.5 x Sub -Total: $1,620.00 Amount to Re -seed: $1,620.00 " w {� "a>ti ...Minulmum Escrow'Amount <* Yx ..-�»s ... _..-.. �.....,., ..., ..,e.�.�-, ,........�.d.we...�.:..........s.fi...w�...�ix.i>. ��.. ,Z.t.-._,,`lus:� 5 , Minimum escrow amount: $3,000.00 .GM01111M, �'��i+r ,:d' t= a �. u _ �t3, A.Sir$ g;•,. ,4 r- $+,�.;�4��.�,v Erosion Control Escrow: $9,247.50 "Tire amount of the security mist be based on one and one-lm6(dmes the estiurate oldie cost to install the approved measures, or one and one-half times the cost to re -vegetate the disturbed land to dry land grasses based upon unit coat determined by the City's Annual Revegetation and Stabilization Rid, whichever is greater. Its no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three thousand dollars ($3,000) for commercial development" 5/12/2015 3:13 PM NW7-00maw UnhWminag6ExampWEacmw.xla APPENDIX D BMP SCHEDULE & COST ESTIMATE Emergency Overflow Spillway Sizing LOCATION: Raw Urth Designs PROJECT NO: 177-09 COMPUTATIONS BY: PPK SUBMITTED BY: North Star Design, Inc. DATE: 5/24/2005 Equation for flow over a broad crested weir�bem Q = CLH312 � � SpIII elevationwhere C = weir coefficient = 2.8 H = overflow height 1 900yrWSEL L = length of the weir 17 The pond has a spill elevation 0 ft above the maximum water surface elevation in the pond Spillways will be designed with 0.25 ft flow depth, thus H = 0.25 ft Size the spillway assuming that the pond outlet is completely clogged Q (100) = 6.4 cfs Spill elev = 4971.65 ft 100 yr WSEL = 4971.65 ft Top of berm elev.= 4972.05 Weir length required: L= 18 ft Use L = 20 ft v = 0.91 ft/s 0 • 1 LOCATION: PROJECT NO: COMPUTATIONS BY: SUBMITTED BY: DATE: Detention Pond Outlet Sizing Raw Urth Designs 177-09 PPK North Star Design, Inc. 5/12/2015 Submerged Orifice Outlet: release rate is described by the orifice equation, Qo = CA sqrt( 2g(h-Eo)) where Qo = orifice outflow (cfs) Co = orifice discharge coefficient g = gravitational acceleration = 32.2 ft/s Aa = effective area of the orifice (ft) Eo = greater of geometric center elevation of the orifice or d/s HGL (ft) h = water surface elevation (ft) Qa = 0.18 cfs outlet pipe dia = D = 12.0 in Invert elev. = 4768.80 ft Eo = 4768.88 ft h = 4771.65 ft - 100 yr WSEL Co = 0.62 solve for effective area of orifice using the orifice equation Ao = 0.022 ftZ 3.1 inZ orifice dia. = d = 2.00 in Check orifice discharge coefficient using Figure 5-21 (Hydraulic Engineering) d/D= 0.17 kinematic viscosity, u = 1.22E-05 ftZ/s Reynolds no. = Red = 4Q/(pdu) = 1.13E+05 Ca = (K in figure) = 0.62 check Use d = 2.00 in Aa = 0.022 ft' = 3.14 in Q max 0.2 cfs LOCATION: PROJECT NO: COMPUTATIONS BY: SUBMITTED BY: DATE: WQCV 100 WSEL STAGE - STORAGE TABLE Raw Urth Designs 177-09 PPK North Star Design, Inc. 8/1/2008 100 yr Detention Volume Required = 0.154 Water Quality Volume Required = 0.000 Total Volume Required= 0.154 Stage (ft) Surface Area (ft) Incremental Storage (ac-ft) Total Storage (ac-ft) 4768.80 0 4770.0 1,590 0.015 0.01 4770.34 2,437 0.016 0.030 4771.0 4,082 0.063 0.077 4771.65 6,513 0.078 0.156 El 4772.1 8,009 0.143 0.221 DETENTION VOLUME BY THE MODIFIED FAA METHOD ---Project:-Raw-Urth.Designs— BasIn ID: 1 Inflow and Outflow Volumes vs. Rainfall Duration 0.25 0.2 -7- 0.15 L E 0.1 P 0 rD D 00 C, 3 0 0 o ODD 900 .: c10330 0-�c OoD 0.05 0 0 50 100 150 200 250 300 350 Duration (Minutes) UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK 2013 Version 224, ReWsed NovemSer UD aoWuon 4.34.9a Mod&md FAA 5112=15. 2:49 are Version 224, ReWsed NovemSer UD aoWuon 4.34.9a Mod&md FAA 5112=15. 2:49 are a% a DETENTION VOLUME BY THE MODIFIED FAA METHOD __ P_rolect:_Raw-Urth.Designs______._____-__ Basin ID: 1 (For catchfronls less than 160 acres only, For larger catchments, use hydrograph routing method) (NOTE: for catchments larger than 90 acres, CUHP hydrograph and routing are reconvrlended) Deterrrlinatlon of MINOR Detention Volum Using Modified FAA Method I Determination of MAJOR Detention Volufre Using Modified FAA Method Cat[MpM DreNpe Int drao vwee Ce.ot Drauu00 Ana Preletebgn onl MiCO SON Grow Rah4n Ponod for Daenoon CmhW Thne of Comenha0en of WmN,ed Aavnme UNf Rebaao RAW Cna4,our P,ociptitlon Daa4n RabHSIDFFoemuM I-C,P,nC,FTJ•C, Coeflklont Cm Co.downl Two CoefficeA nne I•• e5,00 Parton, A• Dam Tye.- C AB•C, Or T. 10' yws (2. 5.10.25, 50. or 1 DO) TO 2 mluHa 0• 0.20 - "aloe P,• '1A1 I,cMs c,• ' 2a.50 c,• 10 c,• o.Tea Caamp,n Oran ag. f eadra. M GkhmMOrm,pa Ara PnOawagmanlNRCS Se0 Gm,q Rehm Faroe 1b 0.,n,bon Control n. of Cocoon moon Ol Wabeared AlbweM Um RWaaa RYe one. P,a6'ma a n Dselgn R.IMaSIDFF--U I-C,- P,4L,nTJ-C, Coracle. CFa CoefficWt Two CoeekkNTMe la- 05.00 pamml A• 0.me TyyaC A.B. C, or T• 100 yeas (2.5.10,25. W. or 100) Tc- T re... A- 0.20 or F77�nciro. C, • 29.50 Cr- 10 C,• o.2ae RumRCoaff[Ian C. 0.5e RonoffC ffclenl C. 0.05 IMnw Paak Ruwfl on- • 2.40 [fa Infmu Pea. Runoff 0F4n- 4 00 of AWwIIe ft Wdbw RaN Opwl• 0.13 [la NbwaaM Pask Wbw Rap cs,.,- a.10 cfa Mod. FM Mbar SWpa Volume- 2.744 cuhk feel Mod. FM Major Store" VeWma- a,720 cook hat Mod, Mbar Storage Velw,e• 0Ae4 a[ma4, Mad. FM Maier$wage Vo krme- 0.154 <re11 5 •- Grwr Re nlYl DuraOenlrcrengMN lrcreasa Vlue Wre la .SIerSAlmubal RaINY Ranfea m Inflow AdjuaoM A.M. Outflow S.M. fLnlao needed odor. Adu.aranl Average Wdbw stnga Wmm� IMenaly V.1um Facto Qrdbw Volume Vekana Duragon IMenMry Volume Fe[br Outlaw— V— mvaNa M[hea/h a[nlaal 'm' [H v ..t c,a{ae1 mMa ecMa/H crNM ln' [f. a[Meel cMeel And. FM Miner S.I., Velbne lcuMa a.j- 2.754 Mod. FAA Maw damage Volume bchlc fLl• a)M Mod.FM Minor Sbraga Volume jacrafi.l• 0.009 Mad. FM Major S.a'. VONma la<re-ILI- 0.1542 UOFCO DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2,34, Released November 2013 UDoelemmn 4.34.ae, Meddled FM V1=015, 2:49 PM APPENDIX C DETENTION POND SIZING CALCULATIONS C North Star Design, Inc. 700 Automation Drive, Unit I Windsor. CO 80550 i LOCATION: Raw Urth Designs PROJECT NO: 177-06 COMPUTATIONS BY: ppk DATE: 5/12/2015 i 100-yr storm, Cf = 1.25 RATIONAL METHOD PEAK RUNOFF (100-YEAR) DIRECT RUNOFF CARRY OVER TOTAL REMARKS Des. Point Area Design. A (ac) C'Cf tc (min) i (new) (in/hr) Q (100) (cfs). from Design Point Q (100) (cfs) Q(100)tot (cfs) 1 1 0.19 0.99 5.5 9.66 1.9 1.9 To area inlet 1 2 0.15 1.00 5.0 9.95 1.5 1.5 to sidewalk culvert 1 3 0.51 0.86 9.1 7.35 3.2 3.2 To Det Pond 1 ALL 0.89 0.92 8.3 7.84 1 6.4 1 6.4 ITo Det Pond Q=CIA Q = peak discharge (cfs) C = runoff coefficient = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) Flow.xls Q100 North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80650 I i LOCATION: PROJECT NO: i COMPUTATIONS BY: DATE: Raw Urth Designs 177-06 ppk 5/12/2015 2-yr storm, Cf = 1.00 RATIONAL METHOD PEAK RUNOFF (2-YEAR) DIRECT RUNOFF CARRY OVER TOTAL REMARKS Design Point Tributary Sub -basin A! (ac) C`Cf tc (min) i (new) (in/hr) Q (2) (cfs) from Design Point Q (2) (cfs) Q(2)tot (cfs) 1 1 0.19 0.79 7.1 2.49 0.4 0.4 To area inlet 1 2 0.15 0.88 5.0 2.70 0.3 0.3 to sidewalk culvert 1 3 0.51 0.69 11.5 2.05 0.7 0.7 To Det Pond 0.89 0.73 10.9 2.11 1.4 1.4 To Det Pond Q=CrCiA Q = peak discharge (cfs) C = runoff coefficient Cr = frequency adjustment factor i = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) FlowAs Q2 North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 LOCATION: PROJECT NO: COMPUTATIONS BY: DATE: 100-yr storm Raw Urth Designs 177-06 ppk 5/12/2015 Cf = 1.25 STANDARD FORM SF-2 TIME OF CONCENTRATION -100 YR SUB -BASIN DATA INITIAL /OVERLAND TIME (ti) TRAVEL TIME / GUTTER OR CHANNEL FLOW (tt) tc CHECK (URBANIZED BASIN) FINAL tc REMARKS DESIGN POINT ISUBBASIN(s) (1) Area (ac) (2) C (3) C'Cf Length (ft) (4) Slope (%) (5) It (min) (6) Length (ft) (7) Slope (%) (8) n Manning rough. Val. (Ws) (9) tt (min) (10) tc = ti+tt 01) Total L (ft) (12) tc=(U180)+10 (min) (13) (min) (14) ' I 1 1 0.19 0.79 0.99 35 2.0 1.0 204 0.5 0.030 0.8 4.49 5.5 239 11.3 5.5 1 2 0.15 0.88 1.00 24 1.5 0.8 146 0.6 0.016 1.6 1.56 2.3 170 10.9 5.0 1 3 0.51 0.69 0.86 62 1.0 3.4 283 0.6 0.030 0.8 5.68 9.1 345 11.9 9.1 1 ALL 1 0.89. 0.73 0.92 62 1.0 2.6 283 0.6 0.030 0.8 5.68 8.3 345 11.9 1 8.3 EQUATIONS: tc=ti+It II-[1.57(1.1-CC,)Lo.5)IS1/3 It _ L/Vel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fart Collins Design Manual) l final tc = minimum of ti + It and urbanized basin check min. tc = 5 minutes I ii I Flow.xls TOC-100 i North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 I LOCATION: Raw Urth Designs PROJECT NO: 177-06 COMPUTATIONS BY: ppk DATE: 5/12/2015 2 yr storm Cf = 1.00 STANDARD FORM SF-2 TIME OF CONCENTRATION - 2 YEAR SUB -BASIN DATA INITIAL /OVERLAND TIME It!) TRAVEL TIME I GUTTER OR CHANNEL FLOW (tt) to CHECK (URBANIZED BASIN) FINAL to REMARKS DESIGN POINT SUBBASIN(s) (1) Area (ac) (2) C (3) Length, (ft) (4) Slope (%) (5) ti (min) (6) Length (fl) (7) Slope (%) (8) n Manning rough. (ft/s) Vel.b4.4 (9) to = ti+it 01) Total L (ft) (12) tc=(1/180)+10 (min) (13) (min) (14) I 1 1 0.19 0.79 35 2.0 2.6 204 0.5 0.030 0.8 7.1239 11.3 7.11 2 0.15 0.88 24 1.5 1.7 146 0.6 0.016 1.6 3.3 170 10.9 5.0 1 3 0.51 0.69 62 1.0 5.8 283 0.6 0.030 0.8 11.5 345 11.9 11.5 1 1 1 ALL 0.89 0.73 62 1.0 5.2 283 0.6 0.030 0.8 5.68 10.9 345 11.9 10.9 i EQUATIONS: to ti + It ti=[1.87(1.1-CCt)L05]/Stn tt= L/Vel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + tt and urbanized basin check min. tc = 5 minutes Flow.xls TOC-2 i North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 1 LOCATION: Raw Urth Designs PROJECT NO: 177-06 COMPUTATIONS BY: ppk DATE: 5/122015 Recommended Runoff Coefficients from Table 3-3 of City of Fort Collins Design Criteria Recommended % Impervious from Urban Storm Drainage Criteria Manual Streets, parking lots (asphalt) Sidewalks Gravel Roofs Lawns (flat <2%, heavy soil) % Runoff Impervious coefficient C 100% 0.95 96% 0.95 40% 0.50 90% 0.95 0% 0.20 SUBBASIN DESIGNATION TOTAL AREA (ac.) TOTAL AREA (sq.ft) ROOF AREA (sq.ft) PAVED AREA (sq.ft) SIDEWALK AREA (sq.ft) GRAVEL AREA (sq.ft) LANDSCAPE AREA (sq.ft) % Impervious RUNOFF COEFF. (C) 1 0.19 8474 0 6368 0 0 2,106 76% 0.79 2 0.15 6427 0 5,354 360 0 713 89% 0.88 3 0.51 22236 12415 0 904 0 8,917 56% 0.69 ALL 0.89 38,584 12,415 12,010 1.264 0 12,895 65% 0.73 Equations - Calculated C coefficients & % Impervious are area weighted C=E(Ci Ai) /At Ci = runoff coefficient for specific area, Ai Ai = areas of surface with runoff coefficient of Ci n = number of different surfaces to consider Al = total area over which C is applicable; the sum of all Ai's FlowAs Cval APPENDIX B HYDROLOGIC COMPUTATIONS PROJECT LOCATION VICINITY MAP APPENDIX A VICINITY MAP A 7. REFERENCES 1. City of Fort Collins, "Storm Drainage Criteria Manual", (SDCM), dated March, 1986. 2. Urban Drainage and Flood Control District, "Urban Storm Drainage Criteria Manual", Volumes 1 and 2, dated March, 1969, and Volume 3 dated September, 1992. 13 6. CONCLUSIONS 6.1 Compliance with Standards All computations that have been completed within this report are in compliance with the "City of Fort Collins Erosion Control Reference Manual for Construction Sites", the "City of Fort Collins Storm Drainage Design Criteria Manual", and the "Urban Storm Drainage Criteria Manual' except where variances are requested as noted in Section 4.2 of this report. 6.2 Drainage Concept The proposed drainage concepts presented in this report and on the construction plans adequately provide for the collection and conveyance of on -site runoff to the detention area. Conveyance elements exist to adequately convey detained runoff downstream. If, at the time of construction, groundwater is encountered, a Colorado Department of Health Construction Dewatering Permit would be required. 12 5) Waste Management and Disposal: Portable toilets will be anchored & periodically maintained by waste management company. Dumpsters on site will be covered & periodically emptied by waste management company. Concrete waste will be allowed to harden and then will be removed from site. No washing activities will occur on site. Location of the concrete washout is shown on the site map. The washout will be suitably deep to accommodate all anticipated concrete truck wash water. Waste concrete will be allowed to harden & be removed from site periodically as the washout reaches 50% of capacity. Truck wash water will not be allowed to reach the curb & gutter or any other water course. 6) Groundwater and Stormwater Dewatering: No groundwater was encountered during soils exploration therefore ground water is not anticipated to be an issue. If groundwater is encountered a groundwater discharge permit shall be obtained and a detailed report shall be completed describing the location and the route of where pumped groundwater will be conveyed and the measures taken to prevent the transport of any pollutants to downstream waters. 7) Inspection & Maintenance: It is required that routine site inspections are performed to effectively address maintenance and repair of Best Management Practices (BMP's). The site inspections are to be performed by the contractor or an inspector designated by the administrator at a minimum of once every fourteen (14) calendar days on active construction sites and after any significant storm event (an event causing runoff). As part of the site inspections the inspector is required to keep documentation of all inspections and BMP maintenance, including an updated Site Map indicating new BMP's or the removal of BMP's since the previous inspection. Any maintenance, repair, or necessary installation of BMP's that are noted during the inspection must be completed within seven (7) calendar days from the date of the inspection m 2 Matenals Handling and S ill Prevention: . Matenals Handling &Spill rr krApphcable.to location on site this Prevention BMP.�Yf�, i'lt q � a*�.iApproximate ,+ Project , ..i'r�'k..'+'°v'aev'Sr:—.i."..i4 Portable toilets, anchored & located away from drainages Contractor to determine }( Fuel storage located in bulk tanks with secondary containment & spill kit Mobile fueling performed at least 200 feet away from drainages & Contractor to determine X fully attended Fertilizers, form oil, solvents, cleaners, detergent stored in 55 gal or smaller containers, kept in Contractor to determine }� storage units Dumpsters containing used chemicals containers & liquid Contractor to determine X wastes kept covered Equipment cleaning (on site) uses no detergents & flows to onsite retention basin In case of a release of fuel or other chemicals, absorbent booms or , earthen berms will be immediately constructed to contain the spill Location of spill X prevent runoff to adjacent surface waters MSDS sheets for onsite chemicals will be kept at the construction trailer to facilitate spill response & Contractor [o determine }( cleanup 3) Dedicated Asphalt or Concrete Batch Plant: Not proposed with this development 4) Vehicle Tracking Pad: Vehicle tracking control pad shall be installed wherever construction vehicle access routes intersect paved public roads. Vehicle tracking control pads shall be installed to minimize the transport of sediment (mud) by runoff or vehicles tracking onto the paved surface. Any mud tracked to public roads shall be removed on a daily basis and after any significant storm that causes sediment to be transported. It is unlawful to track sediment/mud onto public streets - --- ---- - - — and -may -be enforced -by the City of Fort Collins, by-tlie State of Colorado or by the EPA. --- - H No--area.-shall-remain-exposed-by-land disturbing-activity--for-more-than-thirty (30)-days-before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed. Temporary & Permanent non-structural BMP's: r v :n tit . y ".:, ,, PPt + n, tu Non Strucral BMP 1, '� ;t Approximate location on site; a i a w v.- PrO�eC.t af'1'S r � 1. l 3 t Ft F'.n C�. S.S�i•l '�i 4 t Y Y � �F' f t j 4 y:, r. x, f�k+�ti t d YF"'E� � . Surface roughening Entire site X Soil stockpile height limit (less than 10') Perimeter vegetative buffer North boundary of site X Minimization of site disturbance Mulch Seed & mulch stockpiles after 30 days Stockpile toe protection (silt fence, wattles or ditch) Preservation & protection of existing North boundary of site X vegetation & trees Good site housekeeping (routine Entire Site X cleanup of trash & constr debris) Sweeping & scraping of hardscape On and off site pavements X areas Heavy equip staged on site, properly maintained & inspected daily (no Staging area X onsite maintenance) 5.5 BMP Implementation 1) Phased BMP Implementation BMP's are expected to change as the construction progresses and it is the responsibility of the contractor to ensure appropriate BMP's are in place and/or removed at the appropriate time in the construction sequence. A construction sequence schedule has been included on the Drainage & Erosion Control Plan and included in the construction plans for this site. All BMP's shall be inspected and repaired or replaced as required to satisfy the conditions of the Stormwater Discharge Permit. All BMP's must be maintained and repaired as needed to assure continued performance of their intended function. Refer to Appendix D for the BMP schedule and estimated costs. 9 All BMP's shall be installed per the details shown on the construction plan set. Temporary & Permanent Structural BMP's: Structural BMP , ",.., l., � . x. � . � PG »t' ?... �`..: on site '�`r Approximate location N c, 1, Al a a• , P �',ti + r , + F t e ��'�, APphcable o this f < d �.Pio Silt Fence Site perimeter, refer to site map X Straw bale dams Rock Socks At sidewalk culverts, in swales, at new inlet, in existing gutters, refer to site map X Earthen diversion dams Vegetated swales Sediment trap/pond Pipe slope drains Geogrid Inlet/outlet protection In the detention Pond X Culverts Riprap Erosion control mats Inlet protection Vehicle Tracking Control Pad At site entrance, refer to site map X Concrete Washout To be located by Contractor, near site entry X Non -Structural Practices for Erosion and Sediment Control: Soils exposed during the earthwork phase and landscape prep phase shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control is installed. No large amount of soils (in excess of 15 yards). will -be allowed to be stock piled on site. Overburden from the utility pipe trenching will be piled adjacent to trenches upstream of sediment controls and will be replaced in the trenches within 72 hours. Excess excavated materials from the demolition and grading phases of the project that cannot be reused on site will be exported as it is excavated. This includes any asphalt pavement from the existing site that is to be removed. A vehicle tracking pad will be installed at a location most beneficial to the site construction as determined by the contractor. Vehicles will not be permitted in the excavated area if soil is muddy. Gravel sub base will be placed and compacted .in the areas indicated for pavement following excavation. In the current pre construction state the site enables tracking of silt onto the adjacent streets during wet conditions. During construction activities the street will be monitored_for _foreian debris_tracked_out_of_the_site_and-mechanical_sweeping..and_clean-up.will- be performed as needed. 8 5.3 Identification and location of all sources Disturbed Areas Sediment ){ Soil stockpiles Sediment X Travel to adjacent public streets Tracked sediment X Contaminated soils Sediment, chemicals Loading and unloading chemicals Chemicals Unloading of building materials Trash, debris X Outdoor storage of chemicals Chemicals On site equipment maintenance Oil, grease On site equipment fueling Diesel, gasoline X Dust generating activities Particulates, sediment X Use of fertilizer, pesticides, herbicides Fertilizer, pesticides Use of detergents, solvents, oils Detergents, solvents, oil X Waste dumpsters, waste piles Chemicals, trash, debris X Concrete washout Concrete, sediment, wash water X On site equipment washing Detergents, oil On site asphalt batch plant Asphaltic cement, sediment On site concrete batch plant Cement, sediment Portable toilets Domestic sewage X 5.4 Best Management Practices (BMP's) for Stormwater Pollution Prevention Structural Practices for Erosion and Sediment Control Structural practices for the site will consist mainly of silt fence and rock sock filters and are described in detail in the following paragraphs. These BMP's are expected to change as the construction progresses and it is the responsibility of the contractor to ensure appropriate BMP's are in place and/or removed at the appropriate time in the construction sequence. All temporary and permanent erosion and sediment control practices must be maintained and repaired as needed to assure continued performance of their intended function. Silt fence and rock sock filters shall be in place prior to commencement of construction activities. During clearing and grubbing necessary for silt fence installation, all cleared material shall be placed on the uphill side so that if erosion occurs from the cleared material, the sediment will be trapped and not transported downstream. Rock socks shall be implemented in the existing _curb. line as shown on the.Drainage_& Erosion Control Plan.--- - - -- -- - -- -- .- - --. - - --. 7 Permit holder: Name: Address: Phone Number: Email Address: Appointed agent: Name: Address: Phone Number: Email Address: M 6 5. STORMWATER MANAGEMENT CONTROLS 5.1 Written Analysis The soils on this site are classified by the USGS Soil Survey as Nunn Clay Loam and are classified in the hydrologic group C. The soils are described as having a slow runoff rate and the hazard of water erosion is moderate and the hazard of wind erosion is moderate. The site is surrounded by developed sites including streets and paved areas. The construction shall utilize silt fence around the perimeter to control sediment transport from rainfall and from wind. The silt fence that is located in the proposed pavement areas will be removed prior to placing new pavement. Rock socks will be utilized in the existing curb and the newly constructed swales to capture sediments that are not fully contained by the silt fence placement. The locations of the rock socks will be in the areas of concentrated flow such as in the existing curb, at the new swales and as needed. The site will also utilize a vehicle tracking control pad to minimize sediment from being tracked onto adjacent pavements. Sediment that is tracked will be removed and placed within the site or permanently disposed of offsite. A concretewashout will be used on site during the concrete placement. All hardened concrete will be disposed of offsite. These BMP's have not been located on the site map due to the fact that the site is very small and these BMP's will need to be placed by the contractor in locations that are most beneficial and will minimize disruption of adjacent traffic. Permanent erosion control consists of covering the soils with a building, concrete walks, concrete drives and sod. No soil will be left exposed to erosion after the construction is complete. Refer to the landscape plan for areas of and instructions for placement of sod and soil amendments required prior to placement of sod. Refer to Appendix D for the timing of the construction phases and the sequential installation of all BMP phasing for this site. Refer to the Appendix D for the Erosion Control Surety calculations. 5:2- WMP contact information 5 Basin 3 is located in the southwest portion of the site and contains the building and the detention pond (landscape area). The roof of the storage building is sloped to drain to the south and the bottom of the detention area is sloped to drain east. This basin accepts runoff from Basins 1 and 2. The detained runoff will enter the existing storm System via a new storm pipe with an orifice to restrict flows to the 2 year historic rate (0.2cfs per acre). Drainage design for this site has been designed to convey on -site runoff to the proposed detention pond and incorporate the required LID enhancement features. On -site runoff will be conveyed to the detention pond via surface flow in the drive aisles, in the LID Swale and subsurface in the perforated pipes. The detention pond will release the detained runoff from the site at the existing (historic) 2-year runoff rate of 0.2 cfs per acre. The developed 2-year runoff rate for this site is 1.4 cfs and the developed 100-year runoff rate is 6.4 cfs. 4.3 Drainage Summary This site has been designed to meet or exceed the "City of Fort Collins Storm Drainage Design Criteria Manual specifications. The proposed drainage design for this site has been designed to convey on -site runoff to the detention pond while minimizing future maintenance. The site incorporates a LID (Low Impact Development) treatment areas including an LID swale without underdrain along the north property line, and permeable interlocking pavers in the parking lot. Refer to. the end of Appendix B for a table indicating the size of the LID treatment area and the area of the site that drains to that LID treatment area. All drainage facilities proposed with this project, including the detention pond, LID features, porous pavers and outlet structure are private and will be owned and maintained by the property owner. 4 4. 3.4 Hydraulic Criteria Hydraulic elements have been designed per City of Fort Collins standards to adequately convey the 100-year storm runoff from this site to the proposed detention pond. A proposed 12" storm pipe will convey the detained runoff from the site to the existing manhole at the southeast corner of the site. DRAINAGE FACILITY DESIGN 4.1 General Concept The runoff from this site will flow into the drive aisle and parking lot which will be constructed using conventional materials (asphalt or concrete) and permeable interlocking pavers. The runoff from the site will either flow on the surface or enter a storm pipe via the permeable interlocking pavers or inlet. In a situation where the permeable interlocking pavements are clogged, the runoff will flow on the surface and enter the detention pond through a metal sidewalk culvert. On -site runoff will also be conveyed to the detention pond via flows in LID swales along the north property boundary to an area inlet and storm pipe. The detained runoff will discharge into the existing storm pipe located at the southeast corner of the site. 4.2 Specific Flow Routing With this design, the site has been broken into 3 basins which correspond with the LID feature that the basin flows to. The basin are described in the following paragraphs. Basin 1 is located in the northmost portion of the site and contains a majority of the private drive and LID feature #1 which is an LID Swale without an underdrain. The runoff from the paved area will flow to the swale and will be collected in an area inlet. The storm pipe then conveys the flows to the south into the detention pond. Basin 2 is located in the eastmost portion of the site and contains a portion of the paved private drive and the parking lot which is surfaced with porous pavers. The runoff from this basin flows to a low point in the private drive then south into the parking lot porous pavers. The flow, if it exceeds the capacity of the pavers, will flow into the detention pond via a metal sidewalk culvert. 2.2 Sub -basin Runoff from this site currently flows to the existing streets and alley. From there, the runoff enters an existing inlet near the intersection of Red Cedar and Conifer. With the proposed drainage concept for this site, the runoff from the site will flow to a proposed detention pond and be released at the 2 year historic runoff rate into the storm system near the intersection of Red Cedar and Conifer. 3. DRAINAGE DESIGN CRITERIA 3.1 Regulations This report was prepared to meet or exceed the "City of Fort Collins Storm Drainage Design Criteria Manual' specifications except where variances are requested as noted in Section 4.2 of this report. Where applicable, the criteria established in the "Urban Storm Drainage Criteria Manual" (UDFCD), 2001, developed by the Denver Regional Council.., of Governments, has been used. 3.2 Development Criteria Reference and Constraints The runoff from this site has been routed to conform to the requirements of the Dry Creek Drainage Basin and the City of Fort Collins Stormwater Department. Both stormwater runoff detention and water quality extended detention are required for this site with on -site detention and offsite water quality. The release rate from the site will be equal to the existing 2-year runoff (0.2 cfs per acre). 3.3 Hydrologic Criteria Runoff computations were prepared for the 10-year minor and 100-year major storm frequencies utilizing the rational method. All hydrologic calculations associated with the basins are included in Appendix B of this report. Standard Form 8 (SF-8) provides time of concentration calculations for all sub -basins. Detention volume was calculated using the predetermined release rate of 0.2 cfs per acre. The FAA method for detention pond sizing was utilized to determine the required volume. Refer to the detention calculations included in Appendix C of this report. 2 1. GENERAL LOCATION AND DESCRIPTION 1.1 Location This site is located on the north side of Conifer Street, west of Red Cedar Circle and east of the existing alley in the Northwest Quarter of Section 1, Township 7 North, Range 69 West of the Sixth Principal Meridian, in the City of Fort Collins, Larimer County, Colorado. See the Vicinity Map in Appendix A of this report. This project is bounded on the north by an existing building, on the east by existing Red Cedar Circle, on the west by a paved alley, and on the south by existing Conifer Street. 1.2 Description of Property The entire project consists of approximately 0.9 acres. The site is currently undeveloped, with areas of existing volunteer weeds and grasses. The existing site is flat with existing slope to the southeast at approximately 0.5% to 1%. The site currently drains into the adjacent streets and alley. Proposed development on -site will include one building, a private drive along the north side of the building, a parking lot and sidewalks. Existing drainage patterns will be altered to direct flow to a proposed detention pond in the southeast corner of the site which will release into the existing storm system in this location. 2. DRAINAGE BASINS AND SUB -BASINS 2.1 Major Basin Description The proposed development lies within the Dry Creek Drainage Basin. Stormwater detention is required for this basin but water quality extended detention is not required because it is provided in the North East College Corridor Outfall (NECCO) detention pond. The City requirement for stormwater detention in the Dry Creek basin is a single - stage detention with a 100-year release rate equal to the existing 2-year runoff (0.2 cfs per acre). 1 n TABLE OF CONTENTS .. TABLE OF CONTENTS............................................................................................................... iii GENERAL LOCATION AND DESCRIPTION 1.1 Location...................................................................................................................1 1.2 Description of Property ............................................................................................ I 2. DRAINAGE BASINS AND SUB -BASINS 2.1 Major Basin Description..........................................................................................1 2.2 Sub -Basin Description.............................................................................................I 3. DRAINAGE DESIGN CRITERIA 3.1 Regulations..............................................................................................................2 3.2 Development Criteria Reference and Constraints...................................................2 3.3 Hydrologic Criteria..................................................................................................2 3.4 Hydraulic Criteria....................................................................................................3 4. DRAINAGE FACILITY DESIGN 4.1 General Concept......................................................................................................3 4.2 Specific Flow Routing.............................................................................................3 4.3 Drainage Summary ..................................................................................................5, 5. STORMWATER MANAGEMENT CONTROLS 5.1 Written Analysis.....................................................................................................6 5.2 SWMP Contact Information...................................................................................7 . 5.3 Identification and location of all potential pollution sources..................................8 5.4 Best Management Practices (BMP's) for Stormwater Pollution Prevention ........... 8 5.5 BMP Implementation.............................................................................................10 6. CONCLUSIONS 6.1 Compliance with Standards..................................................................................13 6.2 Drainage Concept..................................................................................................13 7. REFERENCES..................................................................................................................14 APPENDICES A Vicinity Map B Hydrologic Computations C Detention Pond Sizing Calculations D BMP Schedule and Cost Estimate E Figures and Tables iii North Star design 700 Automation Drive, Unit I Windsor, CO 80550 Phone: 970-686-6939 Fax:970-686-1188 May 6, 2015 Shane Boyle City of Fort Collins Stormwater 700 Wood Street Fort Collins, CO 80522-0580 RE: Final Drainage and Erosion Control Report for Raw Urth Designs Dear Shane, I am pleased to submit for your review and approval, this Final Drainage and Erosion Control Report for Raw Urth Designs (Lot 20, Block 3, Evergreen Replat 1). I certify that this report for the drainage design was prepared in accordance with the criteria in the City of Fort Collins Storm Drainage Manual. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Sincer Patricia Kroetch, P.E. ii FINAL DRAINAGE AND EROSION CONTROL REPORT FOR RAW URTH DESIGNS (LOT 20, BLOCK 3, EVERGREEN REPLAT 1) Prepared for: Raw Urth Designs P.O. Box 369 Bellvue, CO 80537 Prepared by: North Star Design 700 Automation Drive, Unit I Windsor, Colorado 80550 (970) 686-6939 May 6, 2015 --- --- -- ------- --- ---- ----- --- Job Number 264-10 m FINAL DRAINAGE AND EROSION CONTROL REPORT FOR RAW URTH DESIGNS (LOT 20, BLOCK 3, EVERGREEN REPLAT 1)