HomeMy WebLinkAboutGRANT STREET CORNERS - PDP - 20-08 - CORRESPONDENCE -6 & 7 especially will need to be looked at further to determine how the existing drive
will need to be changed to meet the new sidewalk grade.
Number: 49 Created: 10/9/2008
[10/9/08] The area between the driveways on lots 6 & 7 is an area of concern.
Currently the residents park in the area between the drives. Once the new sidewalk
is installed and you have cut into the drive approach to tap the water line you have
several options with the driveways. 1) Extend the "median" out to the curb and
gutter. 2) Install some sort of curb along the edge of the sidewalk to prevent parking
in-between the drives. 3) Pave the middle portion and create a larger driveway on lot
6 that runs back to the existing house allowing vehicles to park behind the new
sidewalk. Please define and show what will be happening in this area more clearly.
Department: Stormwater-Water-Wastewaterlssue Contact: Wes Lamarque
Topic: Stormwater
Number: 47 Created: 10/9/2008
[10/9/08] No Comments.
Department: Stormwater-Water-Wastewaterlssue Contact: Roger Buffington
Topic: WaterMastewater
Number: 43 Created: 10/7/2008
[10/7/08] No further comments.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this
project, please -feel free to call me at (970) 221-6750.
Sincerely,
E Vbq P'
Shelby Sommer
City Planner
Page 3
[10/6/08] Only one driveway parking space can be counted on Lots 2, 3, 5 and 7
(there may be room for more cars, but only one counts since cars become blocked
in). This doesn't appear to be a problem because you satisfy the minimum number
of required parking spaces without counting these tandem spaces, but the plans do
need to be updated (see redlines).
Number: 46 Created: 10/8/2008
[10/8/08] This project will be ready for an administrative public hearing after you
provide my office with updated building elevations of the proposed house. Also, we
will need an updated site plan for the public hearing since planning's copy was given
back to you with redlines.
Topic: Site Plan
Number: 17 Created: 8/5/2008
[10/6/08] The calculations that you have provided are accurate for the lots that don't
have any new buildings proposed on the rear 50%. Please update the calculations
for lots 5, 6 and 7 to include the proposed floor area for the carriage houses (see
redlines).
[8/5/08] All lots in this zone are subject to a maximum FAR of 0.33 on the rear 50
percent of the NEW lot. Please provide calculations (either on the site plan or a
separate document) to demonstrate that all of these lots comply with the FAR
requirements. It appears to me that Lot 2 is questionable whether or not it complies.
Number: 22 Created: 8/5/2008
[10/6/08] Please label trash enclosure on site plan and provide elevations with
specified materials (on elevations page or elsewhere).
[8/5/08] Since many of the existing garages are proposed to be removed, where will
the residents store their trash? Trash. enclosures may be a good idea, and should
be designed to match building architecture and should be large enough to
accommodate recycling services.
Department: Engineering Issue Contact: Andrew Carney
Topic: General
Number: 44 Created: 10/8/2008
[10/8/08] Technical Services: Please correct a typo in the legal description - see
redlines.
Number: 45 Created: 10/8/2008
[10/8/08] Please extend the walks on lots 6 & 7 all the way to Grant Street after the
existing attached walk is removed or remove the walk up to the edge of the new
sidewalk.
Topic: Site Plan
Number: 48 Created: 10/9/2008
[10/9/08] Please provide some spot elevations to show how the elevations will work
when the new sidewalk is installed across the existing driveways. The drives on lots
Page 2
6�
+, STAFF PROJECT REVIEW
City of Fort Collins
Stewart & Associates, Inc. ( Jerry Robinson) Date: 10/10/2008
103 S. Meldrum St
Fort Collins, CO 80521
Staff has reviewed your submittal for Grant Street Corners PDP - Type I, and we
offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Shelby Sommer
Topic: Building Elevations
Number: 26 Created: 8/5/2008
[10/6/08] It is still unclear which building elevations correspond with which property.
I also need to see building elevations for the proposed new house on Lot 4 to make
sure that is compatible with the surrounding existing architecture.
[8/5/08] Please provide building elevations on 24 x 36" sheets and show all 4 sides
of each carriage house, with dimensions and proposed materials. I will also need to
see elevations for the proposed house. The exterior eave heights along side lot
lines for carriage houses must not exceed 13 feet in height. Please refer to Division
4.7(F)(3) for a list of standards specific to carriage houses
Number: 40 Created: 10/6/2008
[10/6/08] Please be aware that when calculating Floor Area for Carriage Houses
(1,000 square feet maximum), basements are included in the calculations. Crawl
spaces that are 72 inches or less (and without egress windows) are allowed and will
not be included in floor area calculations for carriage houses. The proposed house
on Lot 4 is allowed to have a basement and such basement will not be considered
party of that lot's Total Floor Area.
Number: 41 Created: 10/6/2008
[10/6/08] Please include maximum building height (24 feet/ 1 1/2 stories) on the
elevations pages. Also, please label all building materials and proposed colors.
Number: 42 Created: 10/6/2008
[10/6/08] Per Section 4.8(F)(3)(c), to the extent reasonably feasible, decks, entry
doors, major entry stairs and major windows shall face the existing building or alley.
Windows that overlooks an abutting side or rear yard shall be minimized. Without
knowing which elevations correspond to which lot it is difficult to tell how each
carriage house will impact adjacent properties. If the carriage houses are rotated 90
degrees as discussed at the Staff Review meeting, this should not be an issue.
Topic: General
Number: 39
Created: 10/6/2008