HomeMy WebLinkAboutHARMONY 23 - PDP - PDP160031 - CORRESPONDENCE - (3)titles on the noted sheets. See redlines.
Comment Number: 8 Comment Originated: 12/06/2016
12/06/2016: There are line over text issues. See redlines.
Department: Traffic Operation
Contact: Nicole Hahn, 970-221-6820, nhahn(&fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 10/21/2016
12/9/2016: City of Fort Collins is working to prepare an estimate for the
geometric improvements at Kechter and Strauss Cabin.
10/21/2016: We would like to set up a time to sit down and review phasing and
implementation strategies for the improvement's on Strauss Cabin and
Harmony Rd. The traffic study indicates needed geometric improvements at
Kechter and Strauss Cabin, and we would like include this as part of our
phasing discussion.
Comment Number: 4 Comment Originated: 10/21/2016
12/9/2016: A pedestrian connection to the development to the West is
desirable from a connectivity standard perspective.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson Wcgov.com
Topic: General
Comment Number: 1
Comment Originated: 10/17/2016
10/17/2016: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
10
Topic: Construction Drawings
Comment Number: 7 Comment Originated: 10/21/2016
12/07/2016: There is text that needs to be masked. Mask all text in hatched
areas. See redlines.
10/21/2016: There is text that needs to be masked. Mask all text in hatched
areas. See redlines.
Comment Number: 10 Comment Originated: 12/07/2016
12/07/2016: There are line over text issues. See redlines.
Comment Number: 11 Comment Originated: 12/07/2016
12/07/2016: There is text that needs to be rotated 180°. See redlines.
Comment Number: 12
12/07/2016: There are text over text issues. See redlines.
Comment Number: 13
12/07/2016: There are match line issues. See redlines.
Topic: Landscape Plans
Comment Number: 4
12/06/2016: No comments.
10/21/2016: No comments.
Topic: Lighting Plan
Comment Number: 6
12/07/2016: No comments.
10/21/2016: No comments.
Topic: Plat
Comment Originated: 12/07/2016
Comment Originated: 12/07/2016
Comment Originated: 10/21/2016
Comment Originated: 10/21/2016
Comment Number: 1 Comment Originated: 10/21/2016
12/06/2016: A full review will take place when the Plat is submitted following the
City's submittal requirements.
10/21/2016: A full review will take place when the Plat is submitted following the
City's submittal requirements.
Comment Number: 2 Comment Originated: 10/21/2016
12/06/2016: Please make changes as marked. If changes are not made or you
disagree with comments, please provide written response of why corrections
were not made. Please provide any responses on redlined sheets and/or in
response letter.
10/21/2016: Please make changes as marked. If changes are not made or you
disagree with comments, please provide written response of why corrections
were not made. Please provide any responses on redlined sheets and/or in
response letter.
Topic: Site Plan
Comment Number: 3 Comment Originated: 10/21/2016
12/06/2016: Some of the sheet titles in the sheet index do not match the sheet
titles on the noted sheets. See redlines.
10/21/2016-. Some of the sheet titles in the sheet index do not match the sheet
9
appropriate steps are being taken to secure any rights, permits, etc. needed for
the wetland expansion prior to proceeding to P&Z hearing.
10/19/2016: Water rights are required for a constructed wetland; please show
that water right requirements are being met. If these wetlands are considered
mitigation, water quality treatment must be provided before runoff reaches the
wetlands; that is, the wetlands can not be used for water quality or Low Impact
Development if they are considered to be mitigation.
Comment Number: 9
Comment Originated: 10/19/2016
12/06/2016: Issues are still seen - will review in person at 12/7 meeting.
10/19/2016: Please see redlines and review calculations for proposed
detention volumes and elevations.
Contact: Jesse Schlam, 970-218-2932, jschlam fcgov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 10/11/2016
12/06/2016: Acknowledge note will look for the comments below to be
addressed during FDP.
10/11/2016: The site disturbs more than 10,000 sq. ft., therefore Erosion and
Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of
Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials
Submitted do not meet requirements. Please submit; an Erosion Control Plan,
an Erosion Control Report, and an Escrow / Security Calculation. Also, based
upon the area of disturbance State permits for stormwater will be required since
the site is over an acre. If you need clarification concerning the erosion control
section, or if there are any questions please contact Jesse Schlam
970-218-2932 or email @ jschlam@fcgov.com
Contact: Mark Taylor, 970-416-2494, mtaylora()fcgov.com
Topic: Floodplain
Comment Number: 3
Comment Originated: 10/17/2016
12/02/2016: Thank you for adding the boundaries. I can see that the
boundaries them, but they are too indistinct, and hard to follow. Please make
them stand out more.
10/17/2016: On the Site Plan, please include the floodplain boundaries and
label them appropriately.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty(a)fcgov.com
Topic: Building Elevations
Comment Number: 9
Comment Originated: 12/06/2016
12/06/2016: Some of the sheet titles do not match the sheet index. See
redlines.
P
Comment Number: 8
Comment Originated: 10/19/2016
10/19/2016: From Excel, Gas Service: A gas main Line will come from Strauss/Rock Creek
Drive; and needs an easement.
Topic: Landscape Plans
Comment Number: 14
Comment Originated: 12/06/2016
12/06/2016: Integrate a 4-foot fence into the landscaping to screen the corner parking from the street
corner year round. Prevent the large parking lots from visually detracting from the
naturalistic corner landscape. The fence could be designed with offsets to
complement the lawn area and internal view from the internal project area as
well as the external view. (Make the fence a complementary addition to the
landscaping — a backdrop for plantings and a visual block of cars.)
Topic: Site Plan
Comment Number: 9 Comment Originated: 12/06/2016
12/06/2016: Angle the parking in the entry circle.
Comment Number: 10 Comment Originated: 12/06/2016
12/06/2016: South road — complete the street like design with sidewalks on
both sides extending to the western drive aisle.
Comment Number: 11 Comment Originated: 12/06/2016
12/06/2016: Question: who does the SW parking serve? There are large
stretches not faced with walkways, and not clearly associated with buildings.
The parking lots serve as the pedestrian access, similar to large
commercial/institutional parking lots.
Comment Number: 12 Comment Originated: 12/06/2016
12/06/2016: Some walkway adjustments:
Meandering walk: separation from Harmony is more important than meander.
Ease the meanders for more distance from the roadway. This is similar to the Engineering comment about
staying 30 feet away from the roadway where possible.
Adjust the walk between Buildings H and I per the meeting.
There is no convenient way to walk out of building J to the north and east.
Comment Number: 17
Comment Originated: 12/10/2016
12/10/2016: Connecting Walkways, as defined, are required for buildings 0 and
P. i.e., walkways should simply connect the breezeway to the street sidewalk.
Understood that culverts will be needed similar to the walkway that is provided
BETWEEN the buildings.
Department: Stormwater Engineering
Contact: Dan Mogen, 970.224-6192, dmogen(CDfcgov.com
Topic: General
Comment Number: 7 Comment Originated: 10/19/2016
12/06/2016: Agreed that water rights are not needed for the 411sf of mitigated
wetlands; however, water rights are required for the constructed wetlands over
and above that mitigation requirement. Please provide documentation that the
7
Comment Number: 13
Comment Originated: 12/08/2016
12/08/2016: TURNING MOVEMENT SOUTH END
The project team will provide an AutoTurn exhibit at a later date. Please pay
particular attention to the 180 degree turnaround at the far South end as it
appears to be problematic upon initial review.
Comment Number: 14
Comment Originated: 12/08/2016
12/08/2016: GATE DESIGN
A gate design will need to be submitted for review and approval by time of
FDP.
Department: Planning Services
Contact: Clark Mapes, 970-221-6225, cmapes(Ci)fcgov.com
Topic: Building Elevations
Comment Number: 15
Comment Originated: 12/06/2016
12/06/2016: This location is different than most multifamily neighborhood
locations in the city. It is located in its own river valley landscape setting that is
not part of any cityscape or neighborhood. Even when the east side of Strauss
Cabin develops, this site will still be a landscape oriented area with the
horizontal line of the valley wall as backdrop.
The responsive design development reflecting prior comments is appreciated.
Question: Add labels to elevations to match letters on site plan?
Comment Number: 16
Comment Originated: 12/06/2016
12/06/2016: Please consider distinguishing building doorways more clearly.
This should be part of the variation among buildings.
E.g., front doors on the 4-plexes, and patio doors on the big buildings, have very
minimal definition.
The trim, detail, and depth need closer attention throughout. Flat, thin exterior
surfaces have been a negative aspect of some recent multifamily buildings that
can be avoided with detailed attention.
Comment Number: 7
Comment Originated: 10/19/2016
10/19/2016: Landscape Plan — Larger trees are needed around the buildings.
Ornamental trees as shown would emphasize the massiveness and dominance
of the buildings in the landscape setting. Evergreen trees would be appropriate
on the north side of buildings along Harmony — Douglas -Fir or Spruce —
consistent with being slightly more upland above the valley floor.
Can the trees along Harmony be established as shown, vis a vis easements?
A few additional cottonwoods to form some denser clumps for a more
naturalistic effect as opposed to all individual specimens widely spaced which
would normally be appropriate.
C
Comment Number: 3
Comment Originated: 12/06/2016
12/06/2016: Multi family buildings are treated as commercial services;
therefore a(C 1) form must be filled out and submitted to Light & Power
Engineering along with a one -line diagram. All secondary electric service work
is the responsibility of the developer and their electrical consultant or contractor.
The C-1 form can be found at:
http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1 Form.pdf
Comment Number: 4 Comment Originated: 12/06/2016
12/06/2016: As your project begins to move forward please contact Light and
Power Engineering to coordinate the streetlight, transformer and electric meter
locations, please show the locations on the utility plans.
Comment Number: 5 Comment Originated: 12/06/2016
12/06/2016: Transformers must have a minimum clearance of 8' from the front
and 3' around the back and sides.
Comment Number: 6
Comment Originated: 12/06/2016
12/06/2016: You may contact FCU Light & Power, project engineering if you
have questions. (970) 221-6700. You may reference Light & Power's Electric
Service Standards at
http://www.fcgov.com/utilities/i mg/site_specific/uploads/ElectricServiceStandar
ds_FINAL_17June2016.pdf
You may reference our policies, development charge processes, and use our
fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers.
Department: PFA
Contact: Jim Lynxwiler, 970-416.2869, llynxwileranpoudre-fire.org
Topic: General
Comment Number: 11
Comment Originated: 12/08/2016
12/08/2016: FIRE LANE GRADE AT HARMONY CONNECTION
Please note the slope of the fire lane connection to Harmony Road.
Comment Number: 12
Comment Originated: 12/08/2016
12/08/2016: FIRE LANE SIGNAGE
Fire lane signage, as shown on the utility plan, will be required at a few
additional locations:
> North & West of Bldg. L.
> South of Bldg. B.
> Very South end of development (at Dog Park).
> "Emergency Access Only" should be posted on both sides of the fire only
access gate if the current, proposed sign locations are not sufficient. This
appears to be problematic for anyone who may miss the sign on Harmony Rd
and attempts this turn.
> Also be advised that the need for other sign locations may be identified at
time of final inspection.
5
Comment Number: 7
Comment Originated: 10/19/2016
12/06/2016: This still needs to be updates on sheet 17 of the utility plan set
(drainage plan). (this can be corrected at the time of Final Plan, if needed)
10/19/2016: Please update the signature block on the Utility Plans from
"Natural Resources" to "Environmental Planner."
Department: Forestry
Contact: Molly Roche, mroche(ai fcgov.com
Topic: Landscape Plans
Comment Number: 3
Comment Originated: 12/08/2016
12/08/2016:
For the next submittal, please include the Plant List with trees labeled on the
landscape plans.
Comment Number: 4 Comment Originated: 12/08/2016
12/08/2016:
Please use the City of Fort Collins Street Tree notes, which are available
through the project planner or the City Forester.
Comment Number: 5
12/08/2016: Street Tree Comments:
Comment Originated: 12/08/2016
Staff is still coordinating internally on the special Cottonwood -based approach in this area, with respect
to Code standards and typical street tree selection (which does not include cottonwoods.) Additional
comments will be forthcoming to reconcile this approach.
Contact: Tim Buchanan, 970-221-6361, tbuchananar)fcgov.com
Topic: Landscape Plans
Comment Number: 2
Comment Originated: 10/19/2016
10/19/2016:
Provide for the LUC 3.2.1 standards on the final landscape plan.
Department: Light And Power
Contact: Coy Althoff, , CAlthoff(cDfcgov.com
Topic: General
Comment Number: 1
Comment Originated: 12/06/2016
12/06/2016: Light & Power does not currently have electric facilities readily
available; although there are plans to extend a duct bank to Strauss Cabin Road
in 2017. There are existing spare conduits within Harmony Road that could be
utilized for some of the electric demand, but conduit and primary cable will need
to be installed along Strauss Cabin in order to serve this area.
Comment Number: 2
Comment Originated: 12/06/2016
12/06/2016: Development charges, electric Capacity Fee, Building Site
charges and any system modification charges necessary will apply to this
development.
4
along Harmony should be located 30 feet from the edge of the road where
possible.
Department: Environmental Planning
Contact: Rebecca Everette, 970-416-2625, reverette(a)fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 10/19/2016
12/06/2016: Thank you for providing the letter of intent and plans for
realignment of the Box Elder Ditch. Please provide the response from the US
Army Corps of Engineers verifying that this action is exempt from the Corps'
requirements once it is received.
10/19/2016: The ECS and planning objectives both note that the Box Elder
Ditch will be relocated by the ditch company prior to construction of this project.
A letter of intent from the ditch company regarding this action is required prior to
hearing. If the project is approved and proceeds to construction, documentation
confirming the relocation of the ditch is required. If the ditch is to be relocated by
any entity other than the ditch company, additional US Army Corps of
Engineers, State Historic Preservation Office, and City of Fort Collins
requirements will apply.
Comment Number: 2
Comment Originated: 10/19/2016
12/06/2016: Prior to hearing, please provide verification that the proposed
constructed wetlands (beyond what is required for mitigation) can be
realistically and legally created on the site. This could be in the form of
documentation from the State Engineer or a letter outlining the steps that have
been taken to secure water rights and meet any other state or federal
requirements.
10/19/2016: The ECS identified a 411 sf wetland that will need to be either
protected or mitigated with this project. If pursuing mitigation, as noted in the
planning objectives, on -site mitigation will make the most sense for this project.
If this project is approved, a wetland mitigation and monitoring plan will be
required prior to construction. Pretreatment of stormwater runoff is required
prior to entering a wetland mitigation area. However, given the amount of new
wetland area proposed with this project, there may be some flexibility in how
that is accomplished. Please arrange a meeting with Dan Mogen (Stormwater)
and myself to discuss further.
Comment Number: 6
Comment Originated: 10/19/2016
12/06/2016: This note still needs to be added to the Overall Grading Plans.
(this can be added at the time of Final Plan, if needed)
10/19/2016: Please add the following statement to the notes on any sheets of
the site, landscape, photometric and utility plans that show the Habitat Buffer:
6The Natural Habitat Buffer Zone is intended to be maintained in a native
landscape. Please see Section 3.4.1 of the Land Use Code for allowable uses
within the Natural Habitat Buffer Zone. This will help preserve the intention
behind the buffer zones and the natural features into the future.
3
know what all these will be yet -- we need to see what utilities and infrastructure
this project will be constructing (water, sewer, storm, roads, and relocations).
Comment Number: 12 Comment Originated
12/06/2016: This comment will be retained until the necessary
letters/easements have been received and reviewed by Katie Andrews.
10/21/2016: Letters of intent from the ditch companies for the work being
shown (improvements and crossings) will be needed prior to hearing.
Comment Number: 20 Comment Originated
12/09/2016: The EB Left onto Hacienda Drive is shorter than LCUASS
standards require. We realize that this lane is constrained by the left at the
intersection and that it is only an interim lane; however, documentation of this
variance is required and you'll need to submit a variance request for this design.
10/21/2016: Once we get the striping plans figured out we will check the turn
lane design and distances.
Comment Number: 22
10/21/2016
10/21/2016
Comment Originated: 10/21/2016
12/06/2016: Emergency access driveway should be concrete to the back of
walk/ROW with rollover curb. 10/21/2016: We are working on establishing a
standard design for emergency accessway with PFA. Once we have the final
design direction on that I will provide you with direction on the materials and
design required.
Comment Number: 23
Comment Originated: 12/06/2016
12/09/2016: The meandering sidewalk is required by the Harmony Corridor
plan and will therefore be accepted. However, the sidewalk needs to be set
back at least 10 feet from the curb in all locations per LCUASS standards (the
Harmony Corridor Plan calls for 30' but with curb and gutter this can be
reduced). If there is a significant barrier to meeting this requirement, please
submit a variance request letter.
Comment Number: 24
Comment Originated: 12/06/2016
12/06/2016: Lift Station Plans: please remove the entirety of the existing
asphalt access road to the edge of asphalt.
Comment Number: 25
Comment Originated: 12/06/2016
12/06/2016: Lift Station Plans: please label the new access road as interim -
the access to the lift station will need to be taken from H25 development, rather
than Strauss Cabin, when it develops.
Comment Number: 26 Comment Originated: 12/06/2016
12/06/2016: Please include the new interim lift station access road on the H23
Strauss Cabin plan/profile sheets.
Contact: Sheri Langenberger, 970.221-6573, slangenbergeraMcgov.com
Topic: General
Comment Number: 1
Comment Originated: 10/21/2016
12/6/16: Based on the current plan submitted showing 366 du, 7,200 sq foot
club house and 24.9 acres the project owes an additional $1,202.50 in
TDRFees for the PDP.
10/21/2016: Per the Harmony Corridor Plan pg. 18 the 8 foot wide sidewalk
2
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
tcgov. com/developmentreview
December 10, 2016
Brent Cooper
RIPLEY DESIGN, INC.
419 CANYON AVE, STE 200
Fort Collins, CO 80521
RE: Harmony 23, PDP160031, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Clark Mapes, at 970-221-6225 or cmapes@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Katie Andrews, 970-221-6501, kandrewsa().fcgov.com
Topic: General
Comment Number: 2
Comment Originated: 10/21/2016
12/09/16: Curb and gutter will be permitted in this location. 10/21/2016: We are
not sure if there should be curb and gutter along this section of Harmony. We
are going to discuss this more internally and will let you know what the direction
on this will be.
Comment Number: 7
Comment Originated: 10/21/2016
12/06/16: The footprint of the shelter/deck is not labeled as a building envelope
and is therefore not excluded from easement area. 10/21/2016: On the plat you
are going to want to exclude out the two areas where the shelters and decks are
shown on the site plan. If not done now you would need to do an easement
vacation of the area in which those are to be placed before you would be able to
get a building permit.
Comment Number: 11 Comment Originated: 10/21/2016
12/06/2016: This comment will be retained until all necessary letters/easements
have been received and reviewed by Katie Andrews. 10/21/2016: Letters of
intent for off -site easements and ROW will be needed prior to hearing. I don't