Loading...
HomeMy WebLinkAboutMAJESTIC ESTATES - FDP - FDP160040 - CORRESPONDENCE -Comment Number: 4 Comment Originated: 11/02/2016 11/02/2016: Please change the solid line along the west side of the property a dashed line. See redlines. Comment Number: 5 Comment Originated: 11/02/2016 11/02/2016: Please make changes to the easement notes as marked. See redlines. Comment Number: 6 Comment Originated: 11/02/2016 11/02/2016: Please make changes to the bearings, distances, and/or curve data as marked. See redlines. Comment Number: 7 Comment Originated: 11/02/2016 11/02/2016: Please add labels to the Detail as marked. See redlines. Comment Number: 8 Comment Originated: 11/02/2016 11/02/2016: Please change the information on sheet 3 to match sheet 2. See redlines. Topic: Site Plan Comment Number: 9 Comment Originated: 11/02/2016 11/02/2016: Some of the easement descriptions shown are incorrect. If they are going to stay on the plan, they should match what is shown on the Subdivision Plat. Department: Traffic Operation Contact: Nicole Hahn, 970-221-6820, nhahn@fcqov.com Topic: General Comment Number: 1 Comment Originated: 11/04/2016 11/04/2016: We will need to see street signing and striping plans. Department: Zoning Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com Topic: General Comment Number: 1 Comment Originated: 11/01/2016 11/01/2016: Please include the setbacks on the site plan either through notes, labels, or exhibit. 4 Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-29329 ischlam@fcgov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 10/11/2016 10/11/2016: The erosion control report was acceptable. The erosion control plan has minor redlines. Please send a revised plan and a single page of the revises erosion control escrow. The full report will not be necessary. Contact: Wes Lamarque, 970-416-2418, wiamargue@fcqov.com Topic: General Comment Number: 2 Comment Originated: 11/04/2016 11/04/2016: Please provide final lot grading for all the lots on the grading plan per discussion at meeting on November 2nd, 2016. Comment Number: 3 Comment Originated: 11/04/2016 11/04/2016: Please increase the slope of the large swale to 1% longitudinal slope. Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: Construction Drawings Comment Number: 11 Comment Originated: 11/02/2016 11/02/2016: There are line over text issues. See redlines. Comment Number: 12 Comment Originated: 11/02/2016 11/02/2016: There is text that needs to be masked. Mask all text in hatched areas. See redlines. Topic: Landscape Plans Comment Number: 10 Comment Originated: 11/02/2016 11/02/2016: Some of the easement descriptions shown are incorrect. If they are going to stay on the plan, they should match what is shown on the Subdivision Plat. Topic: Plat Comment Number: 1 Comment Originated: 11/02/2016 11/02/2016: Please add new title commitment information if available. You could be potentially liable for any documents recorded since this date. Comment Number: 2 Comment Originated: 11/02/2016 11/02/2016: Please provide current acceptable monument records for the aliquot corners shown. These should be emailed directly to Jeff at jcounty@fcgov.com Comment Number: 3 Comment Originated: 11/02/2016 11/02/2016: Please revise the Access Easement statement. See redlines. 3 Comment Number: 4 Comment Originated: 11 /04/2016: There's a callout to a 10 foot irrigation easement on the plat, but doesn't point to a defined area (except it's within a 50' storm drainage easement.) Please provide further information on this irrigation easement, is it existing, or to be dedicated (and if to be dedicated, presumably it's not to the City?) Department: Environmental Planning Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com Topic: Landscape Plans Comment Number: 1 11 /04/2016 Comment Originated: 11/01/2016 11/01/2016: Given the amount and variety of grass seed mixes to be used, please let me know if you would like any assistance with the proper seeding and maintenance of these areas to ensure successful establishment. Staff would be interested in meeting with the landscape contractor on the site prior to seeding activities to discuss best practices and potential challenges. Department: Light And Power Contact: Coy Althoff, , CAlthoff@fcqov.com Topic: General Comment Number: 1 Comment Originated: 11/01/2016 11/01/2016: Single phase electric facilities are located along the north, transitioning to the west side of Majestic Dr. Crossings with 2" and 4" conduits were installed under the street for future expansion such as this one. Comment Number: 2 Comment Originated: 11/01/2016 11/01/2016: Development charges, electric Capacity Fee, Building Site charges and any system modification charges necessary will apply to this development. Comment Number: 3 Comment Originated: 11/01/2016 11/01/2016: The location of the water and electric services will need to be coordinated with Light and Power Engineering. Comment Number: 4 Comment Originated: 11/01/2016 11/01/2016: Contact Light and Power Engineering to coordinate the transformer and electric meter locations, please show the locations on the utility plans. Comment Number: 5 Comment Originated: 11/01/2016 11/01/2016: Please contact Light & Power Engineering if you have any questions at 221 6700. Please reference our policies, development charge processes, and use our fee estimator at http://www.fcgov.com/utilities/business/builders and developers. 2 Fort Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov. com/developmentreview November 04, 2016 Kenneth Merritt JR ENGINEERING, LLC 2900 S COLLEGE AVE, STE 3D Fort Collins, CO 80525 RE: Majestic Estates, FDP160040, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343ortshepard@fcgov.com. Comment Summary: Department: Engineering Development Review Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com Topic: General Comment Number: 1 Comment Originated: 11/04/2016 11/04/2016: Can I be reminded whether work is being done within Larimer County jurisdiction? The civil plans have a signature block for Larimer County Engineering but the more I look at it, I'm not seeing (or recalling) why this is needed, it appears all work is occurring within City limits. Comment Number: 2 Comment Originated: 11/04/2016 11/04/2016: There appears to be a pedestrian path that is being built outside of the platted boundary within Outlot A, Block 2 of the Fort Collins Colorado Temple. There should be some documentation from the owner of Outlot A indicating their acceptance of the construction of the path on the property. Typically, this would also require a minor amendment to the Fort Collins Colorado Temple approved plan, since it's a change to that approved plan. I will defer to Zoning on the applicability of a minor amendment to that plan. Comment Number: 3 Comment Originated: 11/04/2016 11/04/2016: Note that Mike DiTullio has retired from FCLWD and Chris Matkins would be the Manager to sign on the approval block for the civil plans.