Loading...
HomeMy WebLinkAboutVINEYARD / GOLDELM - OVERALL DEVELOPMENT PLAN - ODP170001 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEW2009 International Mechanical Code (IMC) 2009 International Fuel Gas Code (IFGQ 2009 International Plumbing Code (IPC) as amended by the State of Colorado 2011 National Electrical Code (NEC) as amended by the State of Colorado Accessibility: State Law CRS 9-5 & ]CC/ANSI Al 17.1-003. Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF. Frost Denth: 30 inches. Wind Load: 100- MPH 3 Second Gust Exposure B. Seismic Design: Category B. Climate Zone: Zone 5 Energy Code Use 1. Single Family; Duplex; Townhomes: 2009IRC Chapter 11 or 2009 IECC Chapter 4 2. Multi -family and Condominiums 3 stories max: 2009 IECC Chapter 4. 3. Commercial and Multi -family 4 stories and taller: 20091ECC Chapter 5. Fort Collins Green Code Amendments effective starting 1-1-2012. A copy of these requirements can be obtained at the Building Office or contact the above phone number City of Fort Collins Building Services Plan Review 416-2341 Page 13 of 12 Compliance with that document will need to be shown. In addition, change in accesses to US287 are under the jurisdiction of the Colorado Department of Transportation. Contact Gloria Hice-Idler at CDOT for details (970-350-2148) To be addressed at PDP and FDP. 16. TRAFFIC OPERATIONS: Connectivity for the parcel to the north needs to be addressed. To be addressed at PDP and FDP. 17. The proposed development project is subject to a Type 2 (Planning and Zoning Board) review and public hearing. The applicant for this development request is required to hold a neighborhood information meeting prior to formal submittal of the proposal. Neighborhood meetings offer an informal way to get feedback from your surrounding neighbors and discover any potential hiccups prior to the formal hearing. Please contact me, at 221-6750, to assist you in setting a date, time, and location. I and possibly other City staff, would be present to facilitate the meeting. 18. Please see the Development Review Guide at www.fegov.com/drg. This online guide features a color coded flowchart with comprehensive, easy to read information on each step in the process. This guide includes links to just about every resource you need during development review. This development proposal will be subject to all applicable standards of the Fort Collins Land Use Code (LUC), including Article 3 General Development Standards. The entire LUC is available for your review on the web at http://www.colocode.com/ftcollins/landuse/begin.htm. 19. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a Modification of Standard Request will need to be submitted with your formal development proposal. Please see Section 2.8.2 of the LUC for more information on criteria to apply for a Modification of Standard. 20. Please see the Submittal Requirements and Checklist at: http://www.fcgov.com/developmentreview/applications.php. 21. The request will be subject to the Development Review Fee Schedule that is available in the Community Development and Neighborhood Services office. The fees are due at the time of submittal of the required documents for the appropriate development review process by City staff and affected outside reviewing agencies. Also, the required Transportation Development Review Fee must be paid at time of submittal. 22. When you are ready to submit your formal plans, please make an appointment with Community Development and Neighborhood Services at (970)221-6750. Pre -Submittal Meetings for Buildine Permits Pre -Submittal meetings are offered to assist the designerlbuilder by assuring, early on in the design, that the new commercial or multi -family aroiects are on track to complying with all of the adopted City codes and Standards listed below. The proposed project should be in the early to mid -design stage for this meeting to be effective and is typically scheduled after the Current Planning conceptual review meeting. Applicants of new commercial or multi-familyy projects are advised to call 416-2341 to schedule a pre - submittal meeting. Applicants should be prepared to present site plans, floor plans, and elevations and be able to discuss code issues of occupancy, square footage and type of construction being proposed. Construction shall comply with the following adopted codes as amended: 20091nternational Building Code (1BQ 20091nternational Residential Code (IRQ 2009 International Energy Conservation Code (IECQ Page 12 of 12 LUC 3.5.3(C)(2) Buildings have a required build -to -line, 30% of the building length shall meet the build -to -line. Along nonarterial street the build to line is 0-15fi, and along arterial street the build to line is 10-25ft. When there is more than one street along a property then a the building shall meet at least two of the built -to -line. Further there shall not be any vehicle use area between the building and the facades of the building. Extend Venus to address The proposed place of worship may be meeting the standard will to need to scale plans to verify. LUC 3.5.3(D) This section has requirements for the massing of the building and does apply LUC 3.5.3(E) This section has standards for the Character and Image of the building dealing with the Facade treatment, entrances, and Base/Top treatments. The buildings will need to comply. 9. LUC 3.5.1(1) For both uses the buildings mechanical/utility equipment (vents, flues, meters, boxes, transformer, conduit, ac/RTU... ) will need to be screened. The location of this equipment shall be identified on the plans and shown how they are screened. To be addressed at PDP and FDP. 10. LUC 3.2.4 For both uses a lighting plan is required, this is usually a photometric site plan with catalog cut sheets of the fixtures. The plan will need to comply with the average minimum foot-candles and while meeting the restrictions of light spillage. To be addressed at PDP and FDP. 11. LUC 3.2.5 For both uses trash and recycling enclosures will need to be provided. Such enclosures shall be designed with walk-in access without having to open the main service gate and located on a concrete pad at least 20ft. from a public walkway. To be addressed at PDP and FDP. 12. LUC 3.2.2 The dealership will need to delineate the parking areas from the inventory area. As there is parking maximums for the non inventory area. LUC 3.2.2(K)(1) The place of worship has a parking minimum see section for details. LUC 3.2.2(K)(5) For both uses based on the number of parking spaces provided a certain number of those will be required to be accessibility spaces. And at least one of the accessibility spaces for each use shall be van accessible (8ft. wide with an 8ft wide loading area). LUC 3.2.2(L) Off-street parking stalls start at 9ft. x 19ft. and two-way drive aisles are 24ft. in width. To be addressed at PDP and FDP. 13. LUC 3.2.2(C)(4) For both uses bicycle parking is required. The dealership will be based on the squarefootage of the building. The place of worship will be based in also based on the square footage. Both have a minimum of 4 spaces. To be addressed at PDP and FDP. 14. TRAFFIC OPERATIONS: A Traffic Impact Study (TIS) will be needed per LCUASS 4.3.2. Please contact me (Martina Wilkinson) at 970-221-6887 or mwilkinson@fcgov.com to scope the study. The study will need to address access to South College, require on -site and off -site improvements, impact to neighboring areas such as the neighborhood to the south and multi -modal improvements (bike and pedestrian facilities). To be submitted with plat. 15. TRAFFIC OPERATIONS: Access to US287 / College Avenue is governed by the adopted Access Control Plan. Page 11 of 12 through a Type 2 review (decision maker is Planning and Zoning Board). LUC 4.21(D) The maximum height of the buildings shall be 4 stories. LUC 4.2 1 (E)(2)(a) Pedestrian -oriented outdoor spaces shall be placed next to activity areas that generate users such as street corners or building entrances. These outdoor spaces should be visible and included amenities such as art. seating, or shelters. The proposal is not showing any pedestrian outdoor space and this will need to be included. These outdoor spaces are intended to be not only for the customers of the site but for employees also. 5. LUC 3.5.3(C)(1) A dearlship is classified as a Commercial building. As such a connecting walk from the public sidewalk to the main entrance of the building is required. LUC 3.5.3(C)(2) Buildings have a required build -to -line, 30% of the building length shall meet the build -to -line. Along nonarterial street the build to line is 0-15ft, and along arterial street the build to line is 10-25ft. When there is more than one street along a property then a the building shall meet at least two of the built -to - line. Further there shall not be any vehicle use area between the building and the facades of the building. The proposed project is not meeting any build -to -line. This section does allow for alternative compliance to be built further back than required but it for such reasons as increased open space. The project shows the site to front on two streets S College Ave and Crestridge. The build -to -line along Crestridge is 0- 15ft. and along S College Ave tO-25ft. The building should be brought to the southeast corner of the site meeting the build -to -lines while provide a pedestrian walkway from the entrance to the sidewalk. If a public street is built through the site creating another comer, the building could built to the other comer. This is the preference to have Venus extend north leaving comer open for display. 6. LUC 3.5.3(D) This section has requirements for the massing of the building and does apply LUC 3.5.3(E) This section has standards for the Character and Image of the building dealing with the Facade treatment, entrances, and Base/Top treatments. The buildings will need to comply. LUC 3.2.1 A landscape plan is required. This shall include the following: detached sidewalks, street trees, perimeter landscaping of vehicle use areas, interior landscape of vehicle use areas, landscape island with trees every 15 spaces, building foundational plantings, and tree stocking. LUC 3.2.2(.t) Vehicle use areas shall have an average minimum landscape setback of 15ft. from an arterial street and 1 OR. from non areterial street. This will apply to the new parking areas provide in this project and also along the south side of Crestridge when it is realigned. LUC 4.6(Bx2)(b) Places of worship or assembly are listed as a permitted use in the M-M-N zone district subject to a Type 1 review (decision maker is a hearing officer). If the place of worship is part of the car dealership PDP then the both will be reviewed as a Type 2 review. LUC 4.6(D)(3) Building in the M-M-N zone district are limited to 3 stories. LUC 3.5.3(C)(1) A place of worship is classified as an Institutional building. As such a connecting walk from the public sidewalk to the main entrance of the building is required. Page 10 of 12 To be addressed at PDP and FDP. 20. There will probably need to be an interim and ultimate design done for SH287. An ultimate design will be needed to determine where sidewalk and curb and gutter shall be placed and if there are any design parameters that need to be accommodated. If the ultimate section is not what is constructed a design for the interim improvements will need to be provided. SH287 is considered an arterial roadway thus a 1000 feet of preliminary offsite design in each direction shall be provided as a part of roadway design. Widen travel land by 10' to get 2' plus road and 8' bike lane. Can get reimburse for 4'. 8" on 12" section 21. This project will need to install sidewalk along the street frontages adjacent to the site, plus any off -site that may be needed to meet level of service criteria. Put along our frontage 22. A 15 utility easement is needed along SH287. A 9 foot utility easement is needed along Crestridge and Venus. To be addressed at PDP and FDP. 23. Some of the improvements to be installed along College Ave would be eligible for Street Oversizing reimbursement. Only those improvements which meet the oversizing criteria and are designed and installed in the ultimate location are eligible for reimbursement. Example the sidewalk along College will need to be installed in the ultimate location and the standards is a sidewalk wider than a local street — thus the width 3.5 feet of the 8 foot wide sidewalk is eligible for reimbursement. To be addressed at PDP and FDP. Department: Electric Engineering Contact: Jim Spaulding, 970-416-2772, isoaulding(aAc¢ov.com Light & Power has spare conduit in a vault west of 5811 S College Ave and will be able to bring 3-phase power to new development. Normal greenstone development charges will apply. Please contact Electrical Engineering for any clearance/accessibility requirements for transformers, streetlights, etc. as well as required forms needed for electrical construction at (970) 221-6700. Will need to check fee schedule of this item. Planning Services Contact: Noah Beals, 970416-2313, nbealsAfc¢ov.com Land Use Code Section (LUC) Section 2.1.3(13)(2) It appears this project will be development in phases or multiple Project Development Plans (PDP). If this is the case and Overall Development is required (ODP) ODP plans are being submitted 2. The property is within 2 different zone districts the General Commercial (C-G) and the Medium Density a. Mixed -use Neighborhood district (M-M-N). b. It appears the existing and new location of the car dealerships are located in the C-G zone district. The church location appears to be in the M-M-N zone district. 3. LUC 4.21(A) The purpose of the C-G zone is to provide a setting for development and redevelopment for retail, commercial, and business uses. Though it may serve to continue to meet the need auto related uses these uses should be designed to accommodate other forms of personal mobility such as pedestrians and bicyclists. Also the sub area plan'South College Corridor Plan' speaks to creating more of a multi -modal environment. To be addressed at PDP and FDP. 4. LUC 4.21(13)(2)C. Vehicle sales and leasing establishments with outdoor storage are listed as a permitted use approved Page 9 of 12 placed and what kind of access they can be. The northern access point is to be a right -in right -out access point. North entry goes away. 14. The property just to the North of this site has a vested approval for layout and density. How does this approval affect this site? That approval shows an access thru this site off of Venus and shows the location for the northern right -in right -out access point out to 287. This project will need to accommodate and provide for these access points. A change to the access locations can be made if the owner of the Waterstone property formally agrees to this. Any change to the access points or tie-ins with the access points or adjacent property needs to show how this/these connection(s) would occur and could work with the grades out there. The connection from Venus to the site to the north does not need to be a street, it can be a drive provided it is designed adequately (width, features, sidewalk connection and grades) to meet Transportation and Poudre Fire Authority needs. To be addressed at PDP and FDP. 15. A raised median in SH287 will most likely need to be installed by this project to control access. Per the adopted access control plan a median will be needed in the short term and the long term, thus this project will probably need to install a raised median. Ideally this median would be able to be designed to accommodate the interim and ultimate roadway sections. Goes away with elimination of north entry 16. Per the access control plan the intersection of SH287/ Crestridge Road/ Smokey Street could be signalized if the streets (Crestridge and Smokey) could be aligned, the intersection meets traffic signal warrants and the grade of the intersection approaches are reduced. If the intersection cannot be aligned then the plan shows that this access shall become a right -in right -out intersection. The conversion of the intersection to a right -in right -out configuration will probably be triggered by the additional traffic that would be added to this intersection by this development. This intersection currently has a high accident rate due to the offset in the roads and limited visibility due to not quite being at the crest of the hill. The plan submitted shows the realignment of Crestridge. Studies as part of the PDP will be done to determine the re -alignment of Crestridge. 17. As indicated in a prior comment - the northern access point location has been defined by the Waterstone project. You will need to work with this property owner regarding this access point. This project will need this access point to develop. You will need to work with the adjacent property owner to; 1) build the access point in the location shown and tie into it or 2) change the location of this access point. For the northern access point the design of the right -in right -out and/or the length of the right turn lane needed may go beyond the boundaries of this property and the property to the north. If it does go beyond the boundaries of this property this development is responsible for obtaining the necessary row from the adjacent property owners. One of the property owners to the north is the City of Fort Collins Natural Resources Department. They have a very defined process for obtaining easements and/or row from them. This is possible to do, but does take a little while. Goes away with elimination of north entry 18. 1 do not know exactly how much row actually exists along College Ave, but it does appear that close to adequate row does exist. A 72 foot minimum half row is needed where a right turn lane is not needed; where a right turn lane is needed a half row of 84 feet minimum is needed. More than likely a preliminary layout design will be needed to determine exactly how much row is needed. To be addressed at PDP and FDP. 19. Any necessary additional row needed for the ultimate SH287 cross section shall be provided. Page 8 of 12 2. The City's Transportation Development Review Fee (TDRF) is due at the time of submittal. For additional information on these fees, please see: http://www.fcgov.conVengineering/dev-review.php Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 4. Please contact the City's Traffic Engineer, Martina Wilkinson (221-6887) to schedule a scoping meeting and determine if a traffic study is needed for this project. In addition, please contact Transportation Planning for their requirements as well.. The traffic study will be key in determining the lengths of the right turn lanes needed and the impact to the intersections and the neighborhood. To be addressed at PDP and FDP. 5. This project is responsible for dedicating any right-of-way and easements that are necessary for this project. Is more ROW needed on any streets? Think College it already dedicated 6. Utility plans will be required and a Development Agreement will be recorded once the project is finalized. 7. A Development Construction Permit (DCP) will need to be obtained prior to starting any work on the site. 8. LCUASS parking setbacks (Figure 19-6) apply and will need to be followed depending on parking design To be addressed at PDP and FDP. 9. For Venus Drive — It appears that adequate row should be in place, provided that the roadways are not offset within the existing row. Additional row will need to be dedicated to accommodate the standard parkway and sidewalk section if it will not fit into the current row due to an offset of the road. To be addressed at PDP and FDP. 10. For Crestridge Road and Venus Drive — The roadways will need to be designed and improved along the frontage of this property by this development. Curb, gutter and sidewalk will need to be designed and built. The roadway pavement will need to be replaced as it does not meet City Standards. To be addressed at PDP and FDP. 11. Venus Drive or an adequate access needs to be extended north thru this site to serve the parcel to the north. Adequate design and dedication of row/easement shall be provided. The plan that was submitted shows a private drive making this connection, which looks like that will work for this. To be addressed at PDP and FDP. 12. All design for College Ave (State Highway 287) will need to meet CDOT design standards and criteria and will need to be approved by CDOT. Access permits will need to be obtained for any changes to existing access points, new access points and any work within the SH287 ROW. Design parameters not covered by CDOT design criteria need to meet City of Fort Collins design standards and criteria. All other public improvements must be designed and built in accordance with the Larimer County Urban Area Street Standards (LCUASS). They are available online at: http://www.larimer.org/engineering/GMARdStds/[JrbanSt.htm 13. There is an approved and adopted access control plan for SH287 that identifies where accesses can be Page 7 of 12 standards range from 50-100' for these features, as identified in Section 3.4. ](E) of the Land Use Code, as you proceed with your site design process. Please note that the Ecological Characterization Study is due a minimum of 10 days prior to the PDP submittal. To be addressed minimum 10 days prior to PDP submittal. 2. Within the buffer zone, according to Article 3.4.1(EXI)(g), the City has the ability to determine if the existing landscaping within the buffer zone is incompatible with the purposes of the buffer zone. Please ensure that your ECS discusses the existing vegetation and identifies potential restoration options. If it is determined to be insufficient, then restoration and mitigation measures will be required. To be addressed at PDP and FDP. With respect to lighting, the City of Fort Collins Land Use Code, in Article 3.2.4(D)(6) requires that "natural areas and natural features shall be protected from light spillage from off site sources." Thus, lighting from the parking areas or other site amenities shall not spill over to the buffer areas. To be addressed at PDP and FDP. 4. The applicant should make note of Article 3.2.1(C) that requires developments to submit plans that "...(4) protects significant trees, natural systems, and habitat". Note that a significant tree is defined as a tree having DBH (Diameter at Breast Height) of six inches or more. As several of the trees within this site may have a DBH of greater than six inches, a review of the trees shall be conducted with Tim Buchanan, City Forester (221 6361) to determine the status of the existing trees and any mitigation requirements that could result from the proposed development. To be addressed at PDP and FDP. With respect to landscaping and design, the City of Fort Collins Land Use Code, in Article 3.2.1 (E)(2X3), requires that you use native plants and grasses in your landscaping or re landscaping and reduce bluegrass lawns as much as possible. To be addressed at PDP and FDP. 6. This project must also comply with the following standard, as it is adjacent to the Redtail Ponds Natural Area, Section3.4.1(L) Compatibility with Public Natural Areas or Conserved Land. If the project contains or abuts a publicly owned natural area or conserved land, the development plan shall be designed so that it will be compatible with the management of such natural area or conserved land. In order to achieve this, the development plan shall include measures such as barriers or landscaping measures to minimize wildlife conflicts, setbacks or open space tracts to provide a transition between the development and the publicly owned natural area or conserved land, and educational signage or printed information regarding the natural values, management needs and potential conflicts associated with living in close proximity to such natural area or conserved land. Confirm that property is adjacent. RR ROW separates. Department: Engineering Development Review Contact: Sheri Langenberger, 970-221-6573, slaneenbereerlaffeeov.com Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of building permit. Please contact Matt Baker at 224-6108 if you have any questions. Need to .speak with Matt about what oversitiing fees will be. Need more understanding! Oberlander thinks $200 per I.F along College, get ,$ back on walk firm 4.5'— rorm 8' andget curb cost if in ultimate location. No wphalt reimburse. Medians are uncertain, try to avoid The norYh access drive should go away to avoid the median being installed Page 6 of 12 • Dead-end fire access roads in excess of 150 feet in length shall be provided with an approved area for turning around fire apparatus. • The required turning radii of a fine apparatus access road shall be a minimum of 25 feet inside and 50 feet outside. Turning radii shall be detailed on submitted plans. • Be visible by painting and/or signage, and maintained unobstructed at all times. 2. To be addressed at PDP and FDP. 2006 International Fire Code 503.2.3, 503.2.4, 503.2.5, 503.3, 503.4 and Appendix D; FCLUC 3.6.2(B)2006 and Local Amendments. 'STRUCTURES EXCEEDING 30' IFC Appendix D; Poudre Fire Authority Administrative Policy 85-5: In order to accommodate the access requirements for aerial fire apparatus (ladder trucks), required fire lanes shall be 30 foot wide minimum on at least one long side of the building. At least one of the required access routes meeting this condition shall be located within a minimum of 15 feet and a maximum of 30 feet from the building, and shall be positioned parallel to one entire side of the building. Refer to Appendix D for more details. Buildings will be below 30'. PAVERS Fire lanes shall be designed as a flat, hard, all-weather driving surface capable of supporting 40 tons. Private drives incorporating pavers as surface for fire lanes shall provide geotech information confirming the paver design can handle fire truck loading. A note shall be added to the civil plans. To be addressed at PDP and FDP. 4. WATER SUPPLY A fire hydrant is warranted on the west side of Hwy 287 to support the dealership expansion. Fire hydrants must be the type approved by the water district having jurisdiction and the Fire Department. Hydrant spacing and flow must meet minimum requirements based on type of occupancy. Have 7 in estimate. ITC 508.1 and Appendix B: COMMERCIAL REQUIREMENTS: Hydrants to provide 1,500 gpm at 20 psi residual pressure, spaced not further than 300 feet to the building, on 600-foot centers thereafter. To be addressed at PDP and FDP. AUTOMATIC FIRE SPRINKLER SYSTEM This building will require an automatic fire sprinkler system under a separate permit. Does existing dealership have sprinkler system? Concern is any future modifications could trigger 6. HMIA a. A HMIA (Hazardous Materials Impact Analysis) for the automobile dealership shall be submitted to the b. Poudre Fire Authority for approval at time of building permit. To be addressed at PDP and FDP. Department: Environmental Planning Contact: Lindsay Ex, 970-224-6143, lex anfceov.com An Ecological Characterization Study is required by Section 3.4.1 (D)(1) as the site is within 500 feet of a known natural habitat (wetlands, wet meadows, and native grasslands). Please note the buffer zone Page 5 of 12 Department: Park Planning Contact: Craig Foreman, 970-221-6618, cforemanna fceov.com 6/16/2014: No comments Department: Historical Preservation Contact: Karen McWilliams, 970-224-6078, kmcwilliamsnalceov.com N/A. The property does not contain buildings 50 years old or older, and the proposed plans are unlikely to affect adjacent historic properties, if any. Department: Fire Authority Contact: Jim Lynxwiler, 970-416-2869, ilvnxwilerna,aoudre-fire.ore 2012 IFC CODE ADOPTION Poudre Fire Authority and the City of Fort Collins have adopted the 2012 International Fire Code. Building plan reviews shall be subject to the adopted version of the fire code in place at the time of plan review submittal and permit application. General comments are provided for the auto dealership and church relative to the conceptual review. More specific discussion will be needed as site plans become available. To be addressed at PDP and FDP. 2. PUBLIC -SAFETY RADIO AMPLIFICATION SYSTEM New buildings require a fire department, emergency communication system evaluation after the core/shell but prior to final build out. For the purposes of this section, fire walls shall not be used to define separate buildings. Where adequate radio coverage cannot be established within a building, public -safety radio amplification systems shall be designed and installed in accordance with criteria established by the Poudre Fire Authority. Poudre Fire Authority Bureau Admin Policy #07-01 To be addressed at PDP and FDP. FIRE LANES IFC 503.1.1: Fire Lanes shall be provided to within 150' of all portions of the building, as measured by an approved route around the exterior of the building. To be addressed at PDP and FDP. FIRE LANE SPECIFICATIONS A fire lane plan shall be submitted for approval prior to installation. In addition to the design criteria already contained in relevant standards and policies, any new fire lane must meet the following general requirements: • Shall be designated on the plat as an Emergency Access Easement. • Maintain the required 20 foot minimum unobstructed width* & 14 foot minimum overhead clearance. • Be designed as a flat, hard, all-weather driving surface capable of supporting 40 tons. Page 4 of 12 9. Erosion buffer zone and floodway boundaries can be obtained in GIS or AutoCAD format by contacting Shane Boyle at 970-221-6700 or sboyle@fcgov.com. To be addressed at PDP and FDP. 10. Questions on floodplain administration standards and requirements can be directed to Mark Taylor at mtaylor@fcgov.com, or by calling him at 970-221-6700. It. Development Review Comments: A drainage report, erosion control report, and construction plans are required and they must be prepared by a Professional Engineer registered in Colorado. The drainage report must address the four -step process for selecting structural BMPs. Standard operating procedures (SOPS) for all onsite drainage facilities need to be prepared by the drainage engineer and there is a final site inspection required when the project is complete and the maintenance is handed over to an HOA or another maintenance organization. The erosion control report requirements are in the Fort Collins Stormwater Manual, Section 1.3.3, Volume 3, Chapter 7 of the Fort Collins Amendments. If you need clarification concerning this section, please contact the Erosion Control Inspector, Jesse Schlam at 224-6015 or To be addressed at PDP and FP. 12. Onsite detention is required for the runoff volume difference between the 100 year developed inflow rate and the 2 year historic release rate. An offsite easement is required to drain across the property to the south and into Fossil Creek which is the drainage outfall for the site. Anticipate draining to the SW across Vineyard property. Concerned about amount of cut to cross. 13. Fifty percent of the site runoff is required to be treated using the standard water quality treatment as described in the Fort Collins Stormwater Manual, Volume 3 — Best Management Practices (BMPs). (http://www.fcgov.com/utilities/business/builders-and-developers/development-forms-guidel ines- regulations/ stormwater-criteria) Extended detention is the usual method selected for water quality treatment; however the use of any of the BMPs is encouraged. To be addressed at PDP and FP. 14. Low Impact Development (LID) requirements are now required when the impervious area is increased or a site is required to be brought into compliance with the Land Use Code. These require a higher degree of water quality treatment for 50% of the new impervious area and 25% of new paved areas must be pervious. Please contact Basil Hamdan at 224-6035 or bhamdan@fcgov.com for more information. There is also more information on the EPA web site at: http://water.epa.gov/polwaste/green/bbfs.cfm? goback=.gde-4605732—member 219392996. LID design information can be found on the City's web site at: http://www. fcgov.com/utilities/businesslbuilders-and-developers/development-forms-guidelines- regulations/ stormwater-criteria. To be addressed at PDP and FP. 15. The city wide Stormwater development fee (PIF) is $7,817/acre (SO.1795 sq.-ft.) for new impervious area over 350 sq.-ft., and there is a $1,045.00/acre ($0.024/sq.-ft.) review fee. No fee is charged for existing impervious area. These fees are to be paid at the time each building permit is issued. Information on fees can be found on the City's web site at http://www.fcgov.com/utilitiesibusinessibuilders-and-developers/plant-investment-development-fees or contact Jean Pakech at 221- 6375 for questions on fees. There is also an erosion control escrow required before the Development Construction permit is issued. The amount of the escrow is determined by the design engineer, and is based on the site disturbance area, cost of the measures, or a minimum amount in accordance with the Fort Collins Stormwater Manual. No fees in estimate range currently. The design of this site must conform to the drainage basin design of the Fossil Creek Basin Master Drainage Plan as well the Fort Collins Stormwater Manual. To be addressed at PDP and FDP. Page 3 of 12 Water and wastewater services for this site are provided by the Fort Collins -Loveland Water District and the South.Fort Collins Sanitation District. The Districts can be contacted at (970) 226-3104. Oberlander - called Ter y Famll to discuss pmjec7. Vemis has a 6 "line but need to connect to east of college for 10 "line. Wastervatermill requiregrades to raise some toget better comrage Department: Stormwater Engineering Contact: Glen Schlueter, 970-224-6065, ¢schlueter0fcaov.com Floodplain Comments: The western third of the undeveloped lot adjacent to 5811 S. College Ave. is located in the City - regulatory floodway and erosion buffer for Fossil Creek. Portions of Chapter 10 of City Code will apply to affected sections of this lot, as visible in the attached City Flood Risk Map. Erosion control buffer is new and does not allow detention on the low part of the site. 2. No structure, detention pond, or water quality pond may be constructed within the erosion buffer zone. Fencing and hard surface paths or trails in an erosion buffer zone must satisfy the standards of Chapter 10, Division 7 of City Code, and fill may not be placed within the buffer for any reason. New irrigated vegetation and nonnative trees, grasses and shrubs are prohibited within the buffer zone. Noted from above and landscape can be native. 3. Any site work, structural construction, fencing, landscaping and other activities considered development by Chapter 10 of City Code must be preceded by an approved floodplain use permit and no -rise certification supported by technical analysis from a professional engineer (P.E.) to cause no -rise in the base flood elevation (BFE). The floodplain use permit and no -rise certification document may be downloaded from the City website; http://www.fcgov.com/utilities/what-we- do/stormwater/flooding/forms-documents. Can lnterwest handle this? Yes no grading in flood plain anticipated. 4. New residential construction, new manufactured home construction, and critical facility construction are prohibited in the floodway. No residential construction will occurr in flood plain. 5. New accessory structures may be constructed in the floodway so long as they are proven by technical analysis from a P.E. to cause no -rise. Accessory structures must be protected from flooding by elevating, floodproofing or venting the structure at least 12 inches above the BFE. No accessory structures anticipated in the floodway. 6. Site work in the floodway must be proven to cause no -rise by technical analysis and certified by a P.E. Can be handled by civil Non-residential construction is permitted in the floodway only if no -rise can be demonstrated by technical analysis and certified by a P.E., and if the proposed use is not considered a critical facility, and if the proposed structure is elevated or floodproofed at least 18 inches above the BFE. No non-residential construction anticipated in the floodway. New basement construction will not be permitted on any proposed structure in the floodway. No basement structures anticipated in thefloodway. 8. Floodplain administration requirement checklists for plan sheets and drainage report items are available here; http://www.fcgov.con /utilities/what-we-do/stormwater/flooding/forms-documents. To be addressed at PDP and FDP. Page 2 of 12 For! t Collins June 27, 2014 Sean Tynan Tynan's Nissan 5811 S College Ave. Fort Collins, CO 80525 Re: 5811 S College Ave -Auto Dealership Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov. com Description of project: This is a proposal for a new auto dealership, a remodel to an existing auto dealership and a new church building at 5811 S College Avenue (Parcel # 96111-00-002). The new auto dealership would be housed in a 24,000 square foot building with associated parking and a proposed realignment of Crestridge St. A new church building, approximately 40,000 square feet, is planned west of the new auto dealership. The site is located in the General Commercial (CG) zone district. This project will be subject to Planning & Zoning Board (Type II) review. Please see the following summary of comments regarding the project request referenced above. The comments offered informally by staff during the Conceptual Review will assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you have any questions regarding these comments or the next steps in the review process, you may contact the individual commenter or direct your questions through the Project Planner, Noah Beals, at 970416-2313 or nbeals@fcgov.com. Comment Summary: Department: Zoning Contact: Peter Barnes, 970416-2355, abarnesCa.fc¢ov.com The existing Nissan dealership will need to be brought into compliance with the applicable standards of the Land Use Code for the proposed remodel and change to a KIA dealership. Chalona - Follow up to see if this is during the Crestridge re alignment or after. Is this a minor amendment? Minor work will not trigger street work based on conversations with City by Tynan's. 2. Planning's comments have addressed Zoning's issues. 3. The existing billboard signs (freestanding signs) will need to be removed. Only one freestanding sign is allowed along South College Ave. Discuss with Vineyard to see if this is new or not. Department: Water -Wastewater Engineering Contact: Roger Buffington, 970-221-6854, rbuMn¢tonQfceov.com Page 1 of 12