HomeMy WebLinkAboutPONDEROSA PARK PUD, 2ND REPLAT - AMENDED FINAL - 37-96 - CORRESPONDENCE - CITIZEN COMMUNICATIONFoUL'18-971,13.-05 1BiTI or Jean Ben'ton (970) 416-8885 or -
William M. (Bill) Benton
516 Pond
- crosa Driye-
Fort Collins; CO 90521-1133
Horne/Office: (970) 2.2.4-5326 or Toll Free: 1-888-597-6109
Fax' (970) .
416-8895 or Toll Free, 1-888-597-6110
P (970) 490-3898, Cellphone: (970) 227-3739-
e-mail.- BBEN516(@aol.com
18 February 1997
FAX TRANSMITTAL
_T& Comnitmity. PlanhI4 and Environruental Services
Attu.. Michael Ludwig, City Plannor
Fik: 221-6378
Pondcr6sa Park PP, 2Od RcplakAmcndodfinal #37-96
When we were looking at lots to build our house, we investigated the southern part of this TYUD and were
old by;the Ouv�lopers that the area now, in question would havespace; to be open spa -because they. were
jp'*_by the City' to•bitty a drainage pipe in the Northern portion. that area now serviced- by the
P6i6&f&i Circic outlet, so excess water would flow into a catch basin at the Southern end of their
Property.
It is possi 'blo I have the proposed building site confused, but I felt owiaaW to Call this possible conflict
into question and also ask what changed?
What effect_ will these proposed building sites havd on the drainage problem they've had (or haw) in this
At the meetings I attended before Jefferson Commons was approvcck one or the soiling points of that
project was that the area directly north of their project was platted to be open space and there(orc the T
neighborhood would not appear to be overly crowded. What thinking changed this?
Possibly the map furnished by your office isn't detailed enough, but I we no access to this Ptuposed.sitc.
if it is through extension of Orchard Place, then the traffic problem that is going to be created by Jefferson
Commons is just going to be compounded
Water pressure in this arm has been a headuche during the months of high water usage. The City gaff
akxrrod us that the lefferson Commons Corporation would install a system to relieve this concern. Will
that relieve the water pressure problems that will be created by these new building sites?
114ortunately I have a conflict the night of your meeting, but I would very much like to have this letter
read Into the record and the moms addressed before final approval.
-Thank you in ad%-dm for your attention in this raaact.