Loading...
HomeMy WebLinkAboutPONDEROSA PARK PUD, 2ND REPLAT - AMENDED FINAL - 37-96 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY (3)co CCJ LO O ":r W CO • O o o cD a Q o O o U • X a o LL z a J W W O > N d> o � W o a n = rn z w w z C7 g N Q_ ti N N W a z x w W z U _ Z J W W o 0 IL Z z 4 5 F- W its U Q� F- ova.) MEMORANDUM TO: Bob Sutter, Architectural Horizons City of Fort Collins FROM: Matt Delich DATE: November 25, 1996 SUBJECT: Trip generation for proposed office building for a roofing business (File: 9681MEM1) This memorandum documents the trip generation that is expected at a proposed office building for a roofing contractor. The site is located south of Mulberry Street and west of Taft Hill Road in Fort Collins. City staff requested a trip generation analysis. The proposal is to convert an existing 3600 square foot former service station to this office use. As part of this project, the owner desires to build a four vehicle garage on the site to store business vehicles, primarily pick-up trucks, overnight. The number of employees that may come to this site on a daily basis would be eight; however, some would leave to go to a job site. No building materials will be stored at this site. Trip Generation, 5th Edition, ITE was used to calculate the trip generation. Single tenant office building (code 715) was used in this calculation. Two variables were used to calculate the trip generation. Using the area of the building as the variable, the following daily and peak hour traffic was calculated: 3,cQoC Daily - 41 trip ends Morning Peak Hour - 6 trip ends Afternoon Peak Hour - 6 trip ends /C? L�2 Using the number of employees as the variable, the following daily and peak hour traffic was calculated: Daily - 28 trip ends Morning Peak Hour - 4 trip ends Afternoon Peak Hour - 4 trip ends It is concluded that the number of daily trip ends generated by this use will be less than 50 and the peak hour trip ends will be less than 10.. The impact of this traffic on the nearby street will be insignificant.