MEMORANDUM
TO: Bob Sutter, Architectural Horizons
City of Fort Collins
FROM: Matt Delich
DATE: November 25, 1996
SUBJECT: Trip generation for proposed office building for a
roofing business (File: 9681MEM1)
This memorandum documents the trip generation that is
expected at a proposed office building for a roofing
contractor. The site is located south of Mulberry Street and
west of Taft Hill Road in Fort Collins. City staff requested
a trip generation analysis. The proposal is to convert an
existing 3600 square foot former service station to this
office use. As part of this project, the owner desires to
build a four vehicle garage on the site to store business
vehicles, primarily pick-up trucks, overnight. The number of
employees that may come to this site on a daily basis would
be eight; however, some would leave to go to a job site. No
building materials will be stored at this site.
Trip Generation, 5th Edition, ITE was used to calculate
the trip generation. Single tenant office building (code 715)
was used in this calculation. Two variables were used to
calculate the trip generation. Using the area of the building
as the variable, the following daily and peak hour traffic was
calculated:
3,cQoC
Daily - 41 trip ends
Morning Peak Hour - 6 trip ends
Afternoon Peak Hour - 6 trip ends
/C? L�2 Using the number of employees as the variable, the following
daily and peak hour traffic was calculated:
Daily - 28 trip ends
Morning Peak Hour - 4 trip ends
Afternoon Peak Hour - 4 trip ends
It is concluded that the number of daily trip ends
generated by this use will be less than 50 and the peak hour
trip ends will be less than 10.. The impact of this traffic
on the nearby street will be insignificant.