HomeMy WebLinkAboutPVH MEDICAL OFFICE BUILDING & PARKING STRUCTURE - PDP - 14-07 - CORRESPONDENCE - (5)constrained roadways
CONSTRAINED ARTERIAL SECTION
• 5 12' Travel Lanes
8' Parkways
• 6' Sidewalks
• 7' Bike Lanes
102' Total ROW
PROPOSED PARI(I FIG —
mum"
LOT 11 ... I. — . I I
1015
ROBLP T'�*N
ld
L.ENIA) MEDIrAL PARK
BOOK 151 6• PAGE 410
LOTwss I'
2
'S�)N LOT I
1017 W
R-.)BER IECII
zl*
'o
ifif
af
to
0
ir
---- -- ".78 5
------------ L
zz--
--------------
OT �94 I Or 29S
POUDRE VALLEY HOSPITAL
MEDICAL OFFICE BUILDING AND PARKING STRUCTURE
04.25.07
......
..
...
II
t
7=.
DOCTORS LANE
--- - ------
�Ls�T
t
I Lu
7—
J!
I t
w
—at
A—
77-,
-----------
17-7
GARFIELD
STREET
WWw rs:
ql�
rif 111
PROPOSED 60,600 S.F.
OPTION 1
i. Fri
",',I
j
20. Development fees and water rights will be due at time of building permit.
Credit for existing services will be allowed. For further information
regarding water and sewer services, please contact Roger Buffington,
221-6700.
21. The site will be served by the Poudre Fire Authority. Both the building and
the skywalk will be required to be equipped with an automatic fire
extinguishing system. Both structures must be within 300 feet of a fire
hydrant. Ideally, a single hydrant may be strategically placed to serve the
proposed building and skywalk as well as the proposed parking structure
on the north side of Garfield. It is highly recommended that the hydrant be
placed along Garfield within 50 to 75 feet of the fire department
connections for each building's sprinkler system in order to achieve the
best possible flow and fire response time.
22. The sprinkler system must be supplied by a water line no less than six
inches in diameter. The standpipe must be able to provide 100 p.s.i. to
the top floor. This will likely require a supplemental fire pump.
23. A four-story building is required to have one 30-foot wide fire access
roadway. This is accomplished by Garfield Street.
24. Regarding the internal fire access lane, the design may depend on
whether all portions of the exterior are within 150 feet of where the fire
truck will stage on Garfield. If the entire exterior is within 150 feet of
Garfield, then the internal fire lane does not have to be looped. If not, then
the internal fire lane needs to loop and maintain 25-foot inside and 50-foot
outside minimum turning radii.
25. The new building should be addressed as the present building is now.
26. Please be aware of requirements.for stairwell signage and requirements
for storing compressed gas and other potentially hazardous materials.
27. Poudre Fire Authority will soon adopt the 2006 International Fire Code.
For further information regarding fire protection, please contact Carie
Dann, 221-6570.
s
13. The design of this site must conform to the drainage basin design of the
Spring Creek Drainage Master Drainage Plan as well the City's Design
Criteria and Construction standards. The city wide development fee is
$3,070/acre ($0.0705/sq.ft.) for new impervious area over 350 sq.ft. No
fee is charged for existing impervious area. This fee is to be paid at the
time the building permit is issued.
14. If there is an increase in imperviousness greater than 1,000 square feet, a
drainage and erosion control report and construction plans are required
and they must be prepared by a Professional Engineer registered in
Colorado. Since the site is being completely redesigned a grading plan is
required and a letter report documenting the site drainage patterns even if
there is less than 1,000 square feet of new imperviousness. If there are
changes in the patterns, the design engineer needs to show that there are
no negative impacts or mitigate them. Documentation of existing
impervious area is important for fees and drainage requirements. The
maximum depth of water at an inlet in the parking lot is limited to 12
inches in depth.
15. Water quality treatment is required. Forty -hour extended detention is the
preferred method. This can be done in open spaces or in the parking lot
medians. Other methods including underground extended detention may
be acceptable. Stormceptors could be considered but other BMPs as
discussed in Volume 3 of the Denver Urban Storm Drainage Criteria
Manual should also be explored.
16. There are storm sewers in Lemay (18-inch) and Garfield (18-inch east of
the inlets and 15 inch west of the inlets). All are RCP. There are inlets on
both sides of Garfield and one on the site that is connected to the storm
sewer in Lemay Ave.
17. Existing mains: 12-inch water in Lemay, 6-inch water in Garfield, 8-inch
sewer in easement south of site, 8-inch sewer in intersection of Garfield
and Robertson.
18. The existing water/sewer services must be used or abandoned at the
main.
19. Water pressure in the area is under typical demand conditions is in the 85
to 90 psi range and at peak hour usage levels drops down into the 70 to
75 psi range. Fort Collins Utilities can provide modeling to provide more
accurate data.
4
4. Normal development fees and site charges will apply but credit will be
given for the existing service. Any change to the existing system will be at
the developer's expense. Public street lighting may already be installed.
Be sure that shade trees are kept at least 40 feet and ornamental trees 15
feet away from street lights. For further information regarding electrical
service, please call Janet McTague, 221-6700.
5. Any existing trees that are removed must be assessed by the City
Forester. The number and size of the replacement trees will be governed
by Section 3.2.1(F). Please contact Tim Buchanan at 221-6361, to set up
a tree inspection.
6. It may not be necessary to dedicate additional right-of-way for Lemay and
Garfield. Lemay Avenue, in this location, is considered a constrained
arterial with 102 feet of total right-of-way. However, Staff remains
concerned about the width the sidewalks in highly active pedestrian
environment. If sidewalks remain attached, then their width must be
widened beyond standard to a minimum of eight to ten feet for proper
separation from the flowline. Staff recommends a site inspection to
determine widening existing attached sidewalks or constructing new six-
foot wide detached sidewalks separated by an eight -foot wide parkway.
Please contact David Averill, 416-2643, to set up a site visit.
7. The existing shared access easement on the west must be rededicated on
the replat.
8. Part of the documents needed to review the construction of the skywalks,
especially on Lemay Avenue, will be a road closure plan to be reviewed by,
the City Engineering and Traffic Operations Department. For further
information, please contact Eric Bracke, 221-6630.
9. The developer.is responsible for replacing any damaged curb, gutter and
sidewalk.
10. The new building will be assessed the City's Street Oversizing Fee and
the Larimer County Road Impact Fee. Credit will be given for the existing
building that is to be demolished.
11. The Engineering Department is available to set up and facilitate a utility
coordination meeting prior to submittal to resolve any potential conflicts.
12. The P.D.P. submittal will include a Utility Plan. Final Compliance will
include a Development Agreement and Development Construction Permit.
For further information regarding the requirements of the Engineering
Department, please contact Randy Maizland, 221-6605.
3
ITEM: Poudre Valley Hospital Medical Office Building
MEETING DATE: April 30, 2007
APPLICANT: Poudre Valley Hospital c/o Mrs. Angie Milewski, BHA
Design, 4803 Innovation Drive, Fort Collins, CO. 80525.
LAND USE DATA: Request to redevelop the southwest corner of Lemay
Avenue and Garfield Street for a new four-story Medical Office Building. The
existing building would be demolished and the new building would contain
approximately 60,000 square feet. An enclosed pedestrian bridge would span
Garfield Street and connect to the third floor of the proposed P.V.H. Parking
Structure and the Hospital. In addition to medical office, P.V.H. would occupy a
portion of the building for administrative offices. The site is 1.6 acres in size and
zoned E, Employment.
COMMENTS:
The site is presently zoned E, Employment. Medical and administrative
offices are permitted uses. Since the building exceeds 50,000 square
feet, the project is subject to review by the Planning and Zoning Board
(Type Two). Please note that the maximum number of parking is 4.5
spaces per 1,000 square feet of gross leasable area.
2. The site will be served electrical power by the City of Fort Collins Utilities.
Three phase power is available from an existing vault along Lemay. A
Commercial One ("C-1") Form will be required to be completed by a
licensed electrical contractor to determine the load and panel size.
3. The size and location of the transformer will need to be evaluated. The
location of a new transformer must be coordinated with Light and Power
such that it is within ten feet of hard surface for emergency change -out.
The transformer must be screened from view from the public streets by
landscaping or by an enclosure that provides the minimum clearance
specifications.
2
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO50522-0580 (970) 221-6750
PLANNING DEPARTMENT
Community Planning and Environmental Services
Current Planning
City of Fort Collins
May 7, 2007
Angie Milewski
4803 Innovation Drive
Fort Collins, CO 80525
Dear Angie:
For your information, attached is a copy of the Staffs comments for the Poudre
Valley Hospifal Medical Office Building located at the southwest corner of
Lemay Avenue and Garfield Street. This item was presented before the
Conceptual Review Team on April 30, 2007.
The comments are offered by staff to assist you in preparing the detailed
components of the project application. Modifications and additions to these
comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 970-221-6750.
Sincerely:
j.�-rC
Ted Shepard
Chief Planner
cc: Project Planner