Response: Noted. In discussions with Carrie Dann, PFA may have
some flexibility on this distance based on actual layouts. We will expect
comments on our layout with the initial PDP submittal.
25. The new building should be addressed as the present building is now.
Response: Noted
Boulder
26. Please be aware of requirements for stairwell signage and requirements
for storing compressed gas and other potentially hazardous materials.
Response: Current uses/tenants do not require storage of compressed
gas beyond the allowable limits per the IBC, if any at all.
Boulder
27. Poudre Fire Authority will soon adopt the 2006 International Fire Code.
For further information regarding fire protection, please contact Carie
Dann, 221-6570.
Response: Comment noted
f
Northern
19. Water pressure in the area is under typical demand conditions is in the 85
to 90 psi range and at peak hour usage levels drops down into the 70 to
75 psi range. Fort Collins Utilities can provide modeling to provide more
accurate data.
Response: Noted
20. Development fees and water rights will be due at time of building permit.
Credit for existing services will be allowed. For further information
regarding water and sewer services, please contact Roger Buffington,
221-6700.
Response: Noted
Northern/Boulder
21. The site will be served by the Poudre Fire Authority. Both the building and
the skywalk will be required to be equipped with an automatic fire
extinguishing system. Both structures must be within 300 feet of a fire
hydrant. Ideally, a single hydrant may be strategically placed to serve the
proposed building and skywalk as well as the proposed parking structure
on the north side of Garfield. It is highly recommended that the hydrant be
placed along Garfield within 50 to 75 feet of the fire department
connections for each building's sprinkler system in order to achieve the
best possible flow and fire response time.
Response: Per a subsequent meeting with the PFA, the fire hydrant for
this project will be located along Garfield on the Parking
Structure project. The Medical Office Building will not be
required to provide a separate hydrant.
Northern/Boulder
22. The sprinkler system must be supplied by a water line no less than six
inches in diameter. The standpipe must be able to provide 100 p.s.i. to
the top floor. This will likely require a supplemental fire pump.
Response: A 6-inch fire service from Garfield will be provided.
BHA
23.A four-story building is required to have one 30-foot wide fire access
roadway. This is accomplished by Garfield Street.
Response: Noted
BHA
24. Regarding the internal fire access lane, the design may depend on
whether all portions of the exterior are within 150 feet of where the fire
truck will stage on Garfield. If the entire exterior is within 150 feet of
Garfield, then the internal fire lane does not have to be looped. If not, then
the internal fire lane needs to loop and maintain 25-foot inside and 50-foot
outside minimum turning radii.
6
Colorado. Since the site is being completely redesigned a grading plan is
required and a letter report documenting the site drainage patterns even if
there is less than 1,000 square feet of new imperviousness. If there are
changes in the patterns, the design engineer needs to show that there are
no negative impacts or mitigate them. Documentation of existing
impervious area is important for fees and drainage requirements. The
maximum depth of water at an inlet in the parking lot is limited to 12
inches in depth.
Response: The impervious area for the proposed site has decreased by
approximately 1,200 square feet.
Northern
15. Water quality treatment is required. Forty -hour extended detention is the
preferred method. This can be done in open spaces or in the parking lot
medians. Other methods including underground extended detention may
be acceptable. Stormceptors could be considered but other BMPs as
discussed in Volume 3 of the Denver Urban Storm Drainage Criteria
Manual should also be explored.
Response: Water Quality is being provided for the site. After evaluating
on -site above ground extended detention and underground
extended detention, a Stormceptor system was found to be
the most feasible option for the proposed site.
Northern
16.There are storm sewers in Lemay (18-inch) and Garfield (18-inch east of
the inlets and 15 inch west of the inlets). All are RCP. There are inlets on
both sides of Garfield and one on the site that is connected to the storm
sewer in Lemay Ave.
Response: Storm water will be routed to the storm system in Lemay
Avenue.
Northern
17. Existing mains: 12-inch water in Lemay, 6-inch water in Garfield, 8-inch
sewer in easement south of site, 8-inch sewer in intersection of Garfield
and Robertson.
Response: Water service will connect to the 6-inch water in Garfield
which is to be confirmed with the City water modeling.
Sanitary will connect to existing sanitary to the south.
Northern
18. The existing water/sewer services must be used or abandoned at the
main.
Response: Noted
5
Response: The existing access easement will be rededicated on the
Plat.
Northern
8. Part of the documents needed to review the construction of the skywalks,
especially on Lemay Avenue, will be a road closure plan to be reviewed by
the City Engineering and Traffic Operations Department. For further
information, please contact Eric Bracke, 221-6630.
Response: Traffic control for Lemay and Garfield for the construction of
the skywalks will be the responsibility of the contractor prior
to the issuance of the construction permit.
9. The developer is responsible for replacing any damaged curb, gutter and
sidewalk.
Response: Noted
10.The new building will be assessed the City's Street Oversizing Fee and
the Larimer County Road Impact Fee. Credit will be given for the existing
building that is to be demolished.
Response: Noted
11.The Engineering Department is available to set up and facilitate a utility
coordination meeting prior to submittal to resolve any potential conflicts.
Response: Noted
Northern
12. The P.D.P. submittal will include a Utility Plan. Final Compliance will
include a Development Agreement and Development Construction Permit.
For further information regarding the requirements of the Engineering
Department, please contact Randy Maizland, 221-6605.
Response: The Utility Plan has been included within the PDP submittal.
Northern
13. The design of this site must conform to the drainage basin design of the
Spring Creek Drainage Master Drainage Plan as well the City's Design
Criteria and Construction standards. The city wide development fee is
$3,070/acre ($0.0705/sq.ft.) for new impervious area over 350 sq.ft. No
fee is charged for existing impervious area. This fee is to be paid at the
time the building permit is issued.
Response: The proposed site is in compliance with the Spring Creek
Drainage Master Plan and City Design Criteria. A Drainage
Letter has been submitted with the PDP submittal.
Northern
14. If there is an increase in imperviousness greater than 1,000 square feet, a
drainage and erosion control report and construction plans are required
and they must be prepared by a Professional Engineer registered in
4
Response: The transformer size, location and screening requirements
will be coordinated with Light and Power and City personnel.
Northern/BHA
4. Normal development fees and site charges will apply but credit will be
given for the existing service. Any change to the existing system will be at
the developer's expense. Public street lighting may already be installed.
Be sure that shade trees are kept at least 40 feet and ornamental trees 15
feet away from street lights. For further information regarding electrical
service, please call Janet McTague, 221-6700.
Response: We will coordinate appropriate fees and service with Janet.
Tree locations will be adjusted to allow appropriate setbacks
from streetlights once final light locations have been
determined by the City.
BHA
5. Any existing trees that are removed must be assessed by the City
Forester. The number and size of the replacement trees will be governed
by Section 3.2.1(F). Please contact Tim Buchanan at 221-6361, to setup
a tree inspection.
Response: Now that our preliminary plans have been developed, we will
schedule a site meeting with Tim to review the existing trees.
BHA
6. It may not be necessary to dedicate additional right-of-way for Lemay and
Garfield. Lemay Avenue, in this location, is considered a constrained
arterial with 102 feet of total right-of-way. However, Staff remains
concerned about the width the sidewalks in highly active pedestrian
environment. If sidewalks remain attached, then their width must be
widened beyond standard to a minimum of eight to ten feet for proper
separation from the flowline. Staff recommends a site inspection to
determine widening existing attached sidewalks or constructing new six-
foot wide detached sidewalks separated by an eight -foot wide parkway.
Please contact David Averill, 416-2643, to set up a site visit.
Response: In review of the existing sidewalks we have developed our
PDP plans to incorporate our preferred sidewalk alignments.
These differ from the standards, but allow the preservation of
several mature trees along the perimeter of the site and
coordinate well with the existing walks along adjacent
parcels. We plan to request a variance for the sidewalk
configurations. Where these sidewalks diverge from the
existing right-of-way, we propose to convey pedestrian
access easement rather than dedication of additional right-
of-way.
Northern
7. The existing shared access easement on the west must be rededicated on
the replat.
3
ITEM: Poudre Valley Hospital Medical Office Building
MEETING DATE: April 30, 2007
APPLICANT: Poudre Valley Hospital c/o Mrs. Angie Milewski, BHA
Design, 4803 Innovation Drive, Fort Collins, CO. 80525.
LAND USE DATA: Request to redevelop the southwest corner of Lemay
Avenue and Garfield Street for a new four-story Medical Office Building. The
existing building would be demolished and the new building would contain
approximately 60,000 square feet. An enclosed pedestrian bridge would span
Garfield Street and connect to the third floor of the proposed P.V.H. Parking
Structure and the Hospital. In addition to medical office, P.V.H. would occupy a
portion of the building for administrative offices. The site is 1.6 acres in size and
zoned E, Employment.
COMMENTS:
1. The site is presently zoned E, Employment. Medical and administrative
offices are permitted uses. Since the building exceeds 50,000 square
feet, the project is subject to review by the Planning and Zoning Board
(Type Two). Please note that the maximum number of parking is 4.5
spaces per 1,000 square feet of gross leasable area.
Response: Comment noted
Lighting
2. The site will be served electrical power by the City of Fort Collins Utilities.
Three phase power is available from an existing vault along Lemay. A
Commercial One ("C-1") Form will be required to be completed by a
licensed electrical contractor to determine the load and panel size.
Response: Comment noted
Northern
3. The size and location of the transformer will need to be evaluated. The
location of a new transformer must be coordinated with Light and Power
such that it is within ten feet of hard surface for emergency change -out.
The transformer must be screened from view from the public streets by
landscaping or by an enclosure that provides the minimum clearance
specifications.
May 7, 2007
Angie Milewski
4803 Innovation Drive
Fort Collins, CO 80525
Dear Angie:
For your information, attached is a copy of the Staffs comments for the Poudre
Valley Hospital Medical Office Building located at the southwest corner of
Lemay Avenue and Garfield Street. This item was presented before the
Conceptual Review Team on April 30, 2007.
The comments are offered by staff to assist you in preparing the detailed
components of the project application. Modifications and additions to these
comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 970-221-6750.