HomeMy WebLinkAboutPVH MEDICAL OFFICE BUILDING & PARKING STRUCTURE - FDP - 14-07A - CORRESPONDENCE -Comments from Current Planning: 1. There are still problems with excessive illumination at the south end of the parking for the M.O.B. First, there are too many light fixtures resulting in foot candles that are not sensitive to the abutting residences. Light levels in this area must.be reduced even if the result is less than what lighting design professionals would normally call for. There are five AA4 fixtures along this property line. This should be reduced to three. According to Nancy Clanton of Clanton and Associates, parking lots with 0.2 — 0.3 foot candles is sufficient. Keep in mind that the lighting plan illumination levels do not account for light spillage from roadway lighting along Lemay and internal building lighting. Both of these sources will contribute illumination into the parking lot. 2. The luminarie schedule for the M.O.B. still does not specify that the AA4's must be equipped with the external house -side shield. 3. Reducing the illumination levels along the south property line is a key element in complying with Sections 3.5.1(H) and 3.5.1(J)(5). Compliance with these compatibility standards must be to the maximum extent feasible and prevail over the allowable levels indicated in Section 3.2.4. An acceptable alternative would be to equip the five AA4's with a timer such that these fixtures held to a lighting curfew of 9:00 P.M. I . 4.. For the parking garage, delete the four D building -mounted wall sconces along Robertson Street at the south end of the west wall. The sidewalk curves away from the building at this location so this lighting is ineffective as functional sidewalk lighting. Further, this area of the site is specifically designed to be heavily landscaped to present a soft edge for the neighborhood. Lighting in this location works in contrast with this landscaping. 5. The luminarie schedules for both the parking garage and M.O:B. need to indicate that the illumination levels are based on a light loss factor of 1.00 so that we can accurately measure foot candles upon initial installation (after the 100 hours bum -in period).. For all plans, except the Lighting Plan, we are ready for mylars. I would like to see a' revised Lighting Plan for review prior to mylar submittal. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely: Ted Shepard Chief Planner Page 3 - Number: 111 Created: 1 /30/2008 [1/30/08] Bridge Plans - there is an inlet shown on the roof of the bridge structures to collect drainage but it is not shown where that water will outlet. Either show where the water is being conveyed to or provide a detailed note. Water cannot be conveyed over the sidewalk or negatively impact the ROW. Number: 112 Created: 1 /30/2008 [1/30/08] Bridge Plans - Please call out the enclose screen mesh size. Cannot exceed 6x6 inches. Please also indicate on the plans how the roof insulation material will be fastened to the top such that it will hold up to strong winds. Department: Light & Power Issue Contact: Doug Martine Topic: Electric Number: 99 Created: 1 /16/2008 [1116/08] It appears that there may be inadequate space provided to install the electric transformers as shown (both projects). Also, these locations may conflict with existing or planned gas lines as this is the normal location for Xcel gas facilities. If gas lines are in this area, the transformers will need to be relocated. Number: 100 Created: 1 /16/2008 [1/16/08] The electric development charges for both projects will be separate invoices and not included with other building permit fees. Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque Topic: Stormwater Number: 92 Created: 12/19/2007 [2/1/08] The maintenance table included on the plans should include a recommended maintenance schedule, not just specifications when it is warranted. [12/19/07] Please add a note on the utility and grading plan sheets stating a maintenance and inspection schedule for the owners of the stormceptor. Number: 101 Created: 1 /29/2008 [1/29/08] Please include the erosion control escrow calculations in each drainage report. Number: 102 Created: 1 /29/2008 [1/29/08] Please have the easement for the stormceptor be a Utility and drainage easement. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: WaterMastewater Number: 103 Created: 1 /29/2008 [1/29/08] Will the water main material for the project be DIP or PVC? If PVC, add Std Details 25 and 30 pertaining to tracer wire. Page 2 STAFF PROJECT REVIEW City of Fort Collins ANGELA MILEWSKI Dater 2/6/2008 BHA DESIGN, INC. 1603 OAKRIDGE DRIVE FORT COLLINS, CO 80525 Staff has reviewed your submittal for PVH MEDICAL OFFICE BUILDING AND PARKING STRUCTURE PDP - TYPE II AND FINAL PLANS, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Randy Maizland Topic: Engineering Number: 104 . Created: 1 /29/2008 [1/29/08] Please fix all line over text conflicts and mask out any text over hatch filled areas and in profiles (TYP) see redlines for clarification. Number: 105 Created: 1 /29/2008 [1/29/08] The off -site and temporary construction easements will need to be submitted for recording with recording fees paid prior to final Plat recordation. Number: 106 Created: 1 /29/2008 [1/29/08] A detail was provided for the transition of vertical curb to existing Hollywood curb on Robertson. A note should be added to the plans stating that the non-standard curb & gutter shall only be used in the 5 foot transition length. The rest of the curb and gutter along Robertson should be constructed to the LCUASS standard. Please see redlines for clarification. Number:107 Created:1/29/2008 , [1/29/08] Please note on the plans that the Robertson access to the parking garage will be closed except for emergency use and specify how the access will be closed off (i.e. bollards, gate etc...) add a detail if needed. Number: 108 Created: 1 /29/2008 [1/29/08] See sheet 7 of the parking garage plans - label the traffic signal pole locations at Doctors Lane. It appears one of the signals will need to be relocated out of the turn lane. Please show the relocated signal pole and show that it will not interfere with the sidewalk or ramp. Number: 109 Created: 1 /29/2008 [1/29/08] Please remove sheet 8 of 12, parking garage plans, this site plan revision will be processed as a separate minor amendment. Revise index as well. Number: 110 Created: 1 /29/2008 [1/29108] Please see redlines for additional, minor comments related to drafting and lebeling. You may submit mylars with the redlines if you are confident all of the comments have been addressed. Page 1