Response: The inlet detail has been provided.
Clarify whether the concrete pan detail will be used throughout the project.
Response: A concrete pan detail was added for the pond area.
Specify what riprap details will be used at what location.
Response: A note was added regarding the type of riprap to be used on -site.
Provide a detail for the one foot chase called out in the parking lot.
Response: The chase detail was provided.
Topic: Erosion Control Plans
Number: 57 NORTHERN Created: 3/23/2007
[3/23/07] Specify what sheets are being used as erosion control plans, label appropriately,
provide erosion control standard notes, schedule and details. Provide erosion control
efficiency talcs, and escrow. Use tru dams in parking lot inlet.
Provide silt fence along disturbance in the channel.
Response: The erosion control was placed on the Overall Grading Plan and noted in
the title. Erosion Calcs are in the Drainage Report (Appendix F).
Topic: Grading Plans
Number: 56 NORTHERN Created: 3/23/2007
[3/23/07] Clean up text make it scannable.
Response: We may need to make pdf's for you. There is a lot of information in some
areas, and it is difficult to separate it out.
Add concrete pans to swale at less than 2 % at eastern edge of parking lot, as well as to the
bottom of the detention pond.
Response: Pans were added to the pond and swale bottom.
Add notes that require that the channel disturbance will be limited to the delineated
construction area.
Response: A note has been added to restore channel to predevelopment conditions.
Grading on USDA property will require an easement from that property owner.
Response: No grading will be done on USDA property.
Be sure and return all of your redlined plans when you re -submit.
Response: We did not receive the comments in red -line form.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Sincerely:
Ted Shepard
Chief Planner
Page 11
17. Please label the property lines on the Lighting Plan.
Response: Property line has been more clearly defined.
CEI
18. At the northeast comer of the site, the expanded parking lot is bordered by two
residential projects in Rigden Farm. While foot-candle levels appear low in this area, it
is difficult to evaluate the impact on the two abutting residential projects without a clear
property line demarcation. Even though the property line is not discernable, please
consider reducing the five double -headed poles in this area to single -headed. The
lamps of the east -facing heads will be visible from these properties and may be
considered an inappropriate intrusion. Since the last rows of parking in this area are
remote, and may not even be used during the night, illumination levels can and should
be lowered when directly abutting residential dwelling units.
Response: Single head poles have been used as requested and the photometrics show the
revised illumination levels.
CEI
19. The Lighting Plan would provide better illumination if the fixtures were staggered or
offset from each other. The alignment of fixtures directly aligned across from each
other is not the most efficient or comfortable lighting for the user. Small target visibility
(children) is improved with staggering.
Response: New lighting poles have been adjusted to create a staggered pattern as
requested to the extent that we can, given the original layout.
NOTED
20. Please note that due to scheduling conflicts, the City's Environmental Planner has not
yet reviewed the Lighting Plan. Additional comments may be forthcoming with regard
to the potential impacts on the Foothills Channel.
Department: Stormwater-Water-Wastewater Issue Contact: Basil Harridan
Topic: Demolition Plans
Number: 54 NORTHERN Created: 3/22/2007
[3/22/071 Please indicate what will be done to the existing tiles/pipes that are located within
the future construction area. These should be called out to be abandoned and
removed if no longer in use, otherwise, they should be tied back into any subdrain
system they may be serving.
Response: The removal/abandonment of the pipes has been show on the demolition
plan.
Indicate which existing storm sewers are to be protected in place.
Response: A note has been added to the plans to protect the existing storm.
Indicate any existing trees that will be protected, specifically in the channel area.
Response: We will not be affecting any trees In the channel area.
Topic: Details
Number: 55 NORTHERN Created: 3/23/2007
[3/23/07] Please use the updated water quality outlet detail, there is one new revision to the
detail used. I can email you a copy of the latest detail, if you send me a request at
bhamdan(cDfcgov.com
Response: The outlet structure detail has been replaced.
Please turn on the layer for the inlet detail.
Page 10
9. On sheet 4, please describe how the Loading Dock is to be screened. Will a screen
wall be provided or is screening relying solely on plant material? If only plant material,
please be sure that it is of sufficient mass and opacity to be effective. Unless there is a
screen wall, the proposed shrubs may be ineffective.
Reference: Plant material has been revised to provide better screening throughout the year.
BHA
10. On sheets 4,5 and 8, please describe the existing condition on the strip of land north of
the drive immediately north of the proposed addition.
Response: Existing plantings have been added to landscape plans to provide better
understanding of existing site conditions
LARSON
11. Regarding the architecture of the proposed auditorium, Staff is concerned that, in
general, the exterior materials selected for the proposed addition lack depth and
texture. Given the massive scale of the building, there is not enough relief. For
example, there is an over -reliance of "stucco" which we believe to be E.I.F.S_ on large
walls. This results in a bland and non -articulated structure.
Response: The building design will be reviewed when a more specific design proposal is
made in the future. Currently, the design is too conceptual to get specific with
materials. Only building massing is proposed, and future design will be subject to
review as such point in time.
LARSON
12. The north wall should be enhanced with elements that provide additional horizontal and
vertical relief. The height of the "stone" (cultured?) base is minimalist compared to the
height of the wall. This base should be raised to provide effective relief.
Response: When the design is developed, horizontal and vertical relief will be an objective.
At present, only the massing is proposed, with the design subject to review when
developed.
LARSON
13. The east and west walls could be enhanced by repeating the angled roof line with
reveals or texture change in materials. Such reveals or textural changes should be of
sufficient depth to create shadow lines. This will help break up the mass and offset the
heavy use of the aluminum curtain wall.
Response: Same as above
LARSON
14. The colored rendition of the building indicates, perhaps unintentionally, a surprisingly
lack of color contrast in the materials. Perhaps a darker stone base could be used. In
addition, please consider a color change for the modules protruding off the east and
west walls. This will allow the sloping roof to stand out with more emphasis.
Response: Same as above
CEI
15. On the Lighting Plan, please modify the Point -by -Point Illuminance Plot by using
maximum initial installed illumination, not a light loss factor of 0.75.
Response: Point -by -Point has been modified to show initial lumens with no light loss factor.
CEI
16. On both of the Schedule of Luminaires, be sure that the selected fixtures match the
existing used on the site. The lamp and wattage should match. The manufacturer,
pole height and color should match.
Response: Schedules have been revised to match existing luminaire wattage and a note
has been added for contractor to match existing.
CEI
Page 9
i
Number:5 - Created:2/26/2007
[2/26/07] This is in the residential neighborhood sign district. Need to show possible wall
sign location of any wall signs.
Response: No wall signs are planned at this current time
Comments from Current Planning:
Br _: Al
1. The information provided describing the Major Amendment should be revised. There
needs to be a clear indication of what is existing, what was done for the Minor
Amendment and what constitutes the Major Amendment. This information should be
provided in an easy -to -read table on both the site plan and in the Planning Objectives.
Also, the Planning Objectives should be expanded to provide a description or a
compare -and- contrast analysis of what is changing. For example, please state or
depict that as a result of this Major Amendment (and the recently approved Minor
Amendment) that four accessory buildings and a soccer field are being removed in
favor of an expanded parking lot. A more concise and thorough description of the
magnitude of changes will help the Planning and Zoning Board understand the project.
Response: Information has been revised on the site plan and in the planning objectives
BHA
2. Please provide a legal description on sheet one.
Response: Legal description has been added
BHA
3. In the lower right corner of sheet one, please provide the title "Timberline Church Major
Amendment' in large font. Then, in smaller font, state "Being an Amendment to
Timberline Church P.U.D. — approved on November 18, 1999."
Response: Title has been added
BHA
4. On sheet one, please provide a smaller vicinity map that will scan and reproduce and
an Index of Sheets.
Response: Vicinity map has been revised
BHA
5. One sheet one, the General Notes should replicate the original P.U.D. unless
conditions are changing due to the Major Amendment. There were 18 Notes on the
original, not six.
Response: Original notes have been added
L
6. On all sheets, please change all references to Phase 2 or Phase 3. The semantics
need to match what is on record with the City. There is the Original P.U.D., the
recently approved and previous Minor Amendment(s), and the subject Major
Amendment.
Response: References have been revised
Response: Northern has revised the references to phases. Phase 2 is now called
Major Amendment and Phase 3 is now referred to as Major Amendment — Future.
NOTED
7. Thank you for providing the basketball courts. Our Parks and Recreation Department
can assist in providing you information on the proper equipment that withstand an
outdoor condition. For example the rims should be double -rimmed for durability.
Response: Noted
BHA
8. On sheet 3, please specify the width and material of the trail.
Response: Material and width have been specifiec
Page 8
r
Topic: Water/Wastewater
Number:31 NORTHERN Created:3/13/2007
(3/13/07] Show the water/sewer services and fire line which were stubbed out in the original
construction for the Phase III building addition. Will these be used for the building
addition? Or should the stubs be abandoned now?
Response: The original service locations have been added to the plans. It is
anticipated that the existing services will be abandoned, if necessary, at the time
of the future building construction.
Number:32 NORTHERN Created:3/13/2007
[3/13/07] PVC versus DIP pipe?
Response: It was proposed with the minor amendment that the relocated waterline
would be constructed of PVC due to material costs. Tracer wire details, etc...
have been included with this plan set.
Number:33 NOTED Created:3/13/2007
[3/13/07] See redlined utility plans for other comments.
Response: See comment responses addressing redline comments.
Department: Zoning Issue Contact: Peter Barnes
Topic: Zoning
Number:1 BHA Created:2/26/2007
[2/26/07] Need to clarify if this major amendment supersedes the current minor amendment
that is in for review. The minor amendment includes phase 2 and some parking
changes on the south, including trash dumpster locations. However, the major
amendment also shows parking and trash changes on the south, but they are different
from those shown on the minor amendment. Which plan is correct? If it's the major
amendment, then should the minor amendment be withdrawn?
Response: The Major amendment will supersede the minor amendment but we would like
the minor amendment to proceed.
Number:2 BHA Created:2/26/2007
[2/26/07] Per Section 3.2.2(K)(5)(d) of the Land Use Code, 28 handicap parking spaces
are required. However, the land use data indicates only 26 spaces provided.
Response: 30 Handicap spaces are now provided
Number:3 BHA Created:2/26/2007
[2/26/07] In order to determine if enough parking is being provided per Section
3.2.2(K)(1)(h) of the Land Use Code, the plan needs to indicate the seating capacity of
the room or rooms that will be used during worship services.
Response: Seating capacity has been added to the Site Plan
Number:4 BHA Created:2/26/2007
[2/26/07] Show distance from Phase 3 addition to north property line.
Response: Distance is now shown
Page 7
[3/6/07] CONSTRUCTION/DEMOLITION: The project must conform to applicable standards
for construction/demolition as specified in the Uniform Fire Code.
Response: As we discussed, this is a comment to be addressed at the time of
construction.
Number:22 LARSON Created:3/6/2007
[3/6/07] OCCUPANT LOAD SIGNS: Any room having an occupant load of 50 or more
where fixed seats are not installed, and which is used for assembly purposes, shall
have the capacity of the room posted in a conspicuous place on an approved sign near
the main exit from the room. Such sign shall be maintained legible by the owner or the
owner's authorized agent and shall indicate the number of occupants permitted for
each room use. 97UFC 2601.16.1
Response: Assembly rooms having an occupant load of 50 or more shall be provided with
the appropriate signage.
Number:23 LARSON Created:3/6/2007
[3/6/07] COMMERCIAL COOKING FIRE EXTINGUISHING SYSTEM:
With the production of grease -laden vapors, an approved, automatic fire -extinguishing
system shall be provided for the protection of commercial -type cooking equipment.
97UFC 1006.1; 1006.2.1
Response: An approved automatic fire -extinguishing system shall be provided as noted.
Number:24 NORTHERN Created:3/6/2007
[3/6/07] TRAFFIC FLOW: How is the church proposing to deal with a possible increase of
traffic entering and leaving the parking lots? Will large numbers of private passenger
vehicles be able to yield to emergency vehicles, if the private vehicles do not enter or
exit (particularly exit) the parking lot other than at the traffic signals?
Response: As we discussed in our meeting, the Church would like to help inform
members of the best ways to exit services at the end of a service. The goal is to
inform of the bestlmost efficient ways to leave the site while reducing
congestion.
Department: Traffic Operations Issue Contact: Eric Bracke
Topic: Traffic Engineering
Number:30 NOTED Created:3/13/2007
[3/13/07] The Traffic Study is acceptable.
Response: Noted
Number:47 OWNER Created:3/14/2007
[3/14/07] 1 recently discovered that the Church does not intend to use Police traffic control
at the key intersections as was stated in the TIS. If this is so, then the traffic study
needs to be revised to analyze the queues for the SB left turns into the site to
determine if there will be an impact to the SB through lanes.
Response: Police traffic control will not be eliminated at this present time
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: Landscape Plan
Number:34 BHA Created:3/13/2007
[3/13/07] Show water/sewer mains and service lines. Adjust plantings to meet separation
requirements in Note 11 on Sheet 9 of Landscape Plan.
Response: Service lines are shown and plants adjusted
Page 6
i
[3/6/07] REQUIRED ACCESS: A fire lane is required. The fire lane shall be located so that
it provides unobstructed access to the Fire Department (automatic sprinkler)
Connection. This fire lane shall be visible by painting and signage, and maintained
unobstructed at all times. A fire lane plan shall be submitted for approval PRIOR to
installation. In addition to the design criteria already contained in relevant standards
and policies, any new fire lane must meet the following general requirements:
Be designed as a flat, hard, all-weather driving surface (asphalt or concrete) capable of
supporting fire apparatus weights. Compacted road base shall be used only for
temporary fire lanes or at construction sites.
Have appropriate maintenance agreements that are legally binding and enforceable.
Be designated on the plat as an Emergency Access Easement.
Maintain the required minimum width of 20 feet throughout the length of the fire lane.
97UFC 901.2.2.1; 901.3; 901.4.2; 902.2.1
Response: Northern has met with Carie. We have included with this submittal the
exhibit and description for the Fire Lane.
Number:8 NORTHERN Created:3/6/2007
[3/6/07] WATER SUPPLY: Fire hydrants, where required, must be the type approved by the
water district having jurisdiction and the Fire Department. Hydrant spacing and water
flow must meet minimum requirements based on type of occupancy. Minimum flow and
spacing requirements include: Commercial, 1,500 gpm at 20 psi residual pressure,
spaced not further than 300 feet to the building, on 600-foot centers thereafter. If
possible, a fire hydrant shall be located within 75 feet of the Fire Department
Connection. 97UFC 901.2.2.2
Response: Northern met with Carie and discussed the existing hydrant locations and
the minor relocation.
Number:18 LARSON Created:3/6/2007
[3/6/07] AUTOMATIC FIRE SPRINKLERS: The proposed additions (Phases 2 and 3) shall
be equipped with automatic fire sprinklers; this sprinkler system shall form a single
system with the existing sprinkler system. Please note on the site plan, the location of
the FDC. 97UBC Table9-13 (City of Fort Collins Amendment).
Response: The existing building is equipped with an Automatic Fire Sprinkler System.
Future additions shall alos be provided with Automatic Fire Sprinkler systems.
Number:19 NORTHERN Created:3/6/2007
[3/6/07] KNOX BOX REQUIRED: Poudre Fire Authority requires a "Knox Box" to be
mounted on the front of every new building equipped with a required fire sprinkler
system or fire alarm system. 97UFC 902.4; PFA BUREAU POLICY 88-20
Response: Carie visited the site and noted that the Knox Box is near the front door of
the church where it should be.
Number: 20 NORTHERN Created:3/6/2007
[3/6/07] FIRE WATER LINE: Where is the existing fire line that supplies the automatic fire
sprinklers? Construction of any portion of a building over the existing fire line is
prohibited.
Response: The existing fire line will not have new construction over the top of it.
Number:21 NORTHERN Created:3/6/2007
Page 5
i
indicate what has been approved with the Minor amendment. A note has been
added to the cover to be completed upon approval of the Minor amendment.
Number:36 NORTHERN Created:3/14/2007
[3/14/071 The right turn lane off of Timberline Road appears to fall short of turn lane length
requirements. A variance request should be submitted addressing this. I don't foresee
a concern with its approval, but it should at least be submitted for evaluation. (Note:
This observation is based upon the present design submitted with a right turn lane that
extends along the CSU property.)
Response: See the response to comment 38.
Number:37 NORTHERN Created:3/14/2007
[3/14/07] The construction of the right turn lane appears to have a substantive impact on
the CSU property. Sheet 13 of the construction plan set even shows a proposed
contour line cutting through one of the buildings and a 25% grade from the sidewalk to
that building. What is the plan for mitigating the impact to CSU? Will a building be
removed? A letter of intent is required from CSU prior to a hearing.
Response: See me response to comment 36.
Number:44 NORTHERN Created:3/14/2007
[3/14/07] Will the various easement and right-of-way dedications be done via plat or deed?
Response: See the response to comment 38.
Number:45 NORTHERN Created:3/14/2007
[3/14/07] A 15' utility easement is typically required behind the right-of-way. With the right
turn lane being done, a 15' easement can't be done behind the right-of-way. The utility
providers will need to okay this.
Response: See the response to comment 38.
Number:49 ALL Created:3/15/2007
[3/15/071 Please ensure all documents have the same title, the title of the construction plans
"Timberline Church Expansion" is fine. The site plan title of "Timberline Church" is
problematic if used on all the documents as it would share the title of the original
project.
(PLEASE REVISE ALL SHEETS WITH THE PROJECT TITLE ABOVE)
Response: All titles have been revised
Response: Northern had the correct title, no titles were changed.
Topic: Site Plan
Number:42 BHA
[3/14/07] The vicinity map is not scannable.
Response: Vicinity map has been revised
Department: PFA
Topic: ,Fire
Number:7 NORTHERN
Created: 3/14/2007
Issue Contact: Carie Dann
Created: 3/6/2007
Page 4
[3/14/071 Please show additional existing contours on the CSU property in order to
ascertain how the right turn lane construction ties into the existing property.
Response: The option of adding a right turn lane to the site has been withdrawn due
to conversation with Matt Delich and the owner. There will be no improvements that
affect Timberline Drive.
Number:39 NORTHERN Created:3/14/2007
[3/14/07] The sidewalk crossing the driveway along Timberline appears awkward. I'd like to
suggest keeping the sidewalk closer to Timberline to head straight across the driveway
rather than bring it closer to the site.
Response: See the response to comment 38.
Number:40 NORTHERN Created:3/14/2007
[3/14/071 Additional design information is needed for the right turn lane prior to a hearing.
What are existing flowline grades and spot elevations of the surrounding area? At the
time of final a flowline profile and cross sections will be needed.
Response: See the response to comment 38.
Number:41 NORTHERN Created:3/14/2007
[3/14/07] What is the hatched out area along Timberline on the plan set, and is the median
being proposed for modification?
Response: See the response to comment 38.
Number:43 NORTHERN Created:3/14/2007
[3/14/07] Please show existing striping along Timberline in conjunction with the demo plan
to verify if patching limits are appropriate.
Response: See the response to comment 38.
Number:46 NORTHERN Created:3/14/2007
[3/14/07] Please provide a striping plan sheet that shows the right turn lane in conjunction
with the existing lanes along Timberline.
Response: See the response to comment 38.
Number:50 NORTHERN Created:3/15/2007
[3/15/07] Please show existing Timberline Road (flowline curb and gutter, median, striping
(on the striping and demo plan) up to the northern boundary of the overall site.
Response: See the response to comment 38.
Topic: General
Number:35 ALL Created:3/14/2007
[3/14/07] I'd like to see the minor amendment indications on the drawings to be "faded
back" so that it is evident that the information shown in not being approved. With the
assumption that the minor amendment will be approved prior to the major amendment,
please add a note at the time of mylars for the major amendment indicating the
approval date of the minor amendment.
Response: A shaded gray area is used to differentiate the minor amendment from the major
amendment area. The approval date of the minor will be added at the time of mylars.
Response: The minor amendment was not faded on the civil drawings because the
site contractor will be building from the plans and we didn't want to cause
confusion on what was to be included. The civil drawings provide phase lines to
Page 3
Response: Native plant species have been added to meet LUC
Number:15 BHA Created:3/6/2007
[3/6/07] Additional screening and buffering per Section 3.2.1(E)(4)(b) along the east
property line to address parking lots adjacent to residential uses.
Response: Burming and additional plants have been added to provide screening from
adjacent uses
Number:16 BHA Created:3/6/2007
[3/6/07] Screening is needed behind the trash enclosure next to the adjoining property.
Response' Screening has been added
Number: 29 Created: 3/7/2007
[317/07] Add Tree Protection standards to the landscape Plan, per Section 3.2.1(F), of the
LUC.
Response: Tree Protection standards have been added
Topic: Site Plan
Number:17 BHA Created:3/6/2007
[3/6/07] Provide parking lot analysis to demonstrate that 10% of the proposed parking lot
area square footage is interior landscape islands, per 3.2.2(M)(1).
Response: Interior landscape parking lot analysis has been added to the site plan
Topic: Utility Plans
Number:26 NORTHERN Created:317/2007
[3/7/07] The edge of the Foothills Channel and the top of embankment needs to be located
on the Existing Conditions Plan, the Demolition Plan sheets, the Horizontal Control
Plan sheets, the Grading Plan sheets and the Overlot Grading Plan sheets. The Limits
of Development (LOD), once established, shall be show on all of the plans referenced
above.
Response: Northern has incorporated the LOD provided by BHA and has indicated
the top of embankment for the Foothills Channel. The channel embankment was
shown on the grading plan only, because of the amount of information on other
sheets (to avoid excess clutter on sheets).
Number:27 BHAINORTHERN Created:317/2007
[3/7/07] The Demolition Plan sheets show many existing trees to be removed. There is no
mention whether or not any of the removed trees will be saved and eventually
replanted as part of the Landscape Plan. The potential removal of this many trees will
impact the amount of solar radiation coming off of the paved surfaces and the visual
quality of the site. At a minimum, contact Tim Buchanan, the City Forester to address
this issue. Tree protection standards need to be added to the Demolition plans for the
trees shown to be protected, per Section 3.2.1(F), of the LUC.
Response: Existing trees will be transplanted or protected - see landscape plan for new
locations.
Response: Northern has indicated that tree relocations must be coordinated with
Landscape Plans.
Department: Engineering Issue Contact: Marc Virata
Topic: Construction Plan
Number:38 NORTHERN Created:3/14/2007
Page 2
T /
STAFF PROJECT REVIEW
CityoF Fort Collins
BHA Design Date: 03/22/2007
Whitney Duvall
1608 Oakridge Dr
Fort Collins, CO 80525
Staff has reviewed your submittal for TIMBERLINE CHURCH EXPANSION MAJOR
AMENDMENT, and we offer the following comments:
ISSUES:
Department: Current Planning
Topic: General
Issue Contact: Dana Leavitt
Number:11 BHA Created:3/6/2007
[3/6/07] Locate the top of bank and edge of channel for the Foothills Channel on the Site
Plans and the Landscape Plans. Contact Dana Leavitt at 224-6143 to set up a site visit
to preliminarily identify top of bank and existence, or lack of ecological characteristics
of the channel.
Response: Site visit with Dana Leavitt established top of bank and edge of channel and is
shown on Site and Landscape Plans.
Number:12 BHA Created:3/6/2007
[3/6/07] Limits of Development (LOD) shall be established and shown on the Site Plan and
the landscape Plan. Contact Dana Leavitt to set up a meeting to establish.
Response: LOD were established per direction from Dana Leavitt and are shown on the Site
and Landscape plans
Number:25 BHA Created:317/2007
[3/7/07] In the Project Description several statements were made in regards to natural
areas, wetlands and buffers. First, a site visit is necessary to determine if an
Ecological Characterization Study will be needed per Section 3.4.1(D) of the LUC.
Second, until the feature (the Foothills Channel) has been physically defined, the
location of the buffer cannot be established. After the location of the buffer has been
established per Section 3.4.1(E)(1) and the Buffer Zone Table of 3.4.1(E), a
determination will be made on the size of the buffer. Third, the landscape material
within the buffer as shown on the landscape plan does not meet the standards as
articulated in Section 3.4.1(E)(1)(e) and (g).
Response: All comments above were discussed with Dana Leavitt and have been revised
per our meeting and are shown on site and landscape plans
Number:48 BHA/NORTHERN Created:3/15/2007
[3/15/071 On all plans - Site to Utility plans, extend existing conditions of Foothills Channel
as it turns east so that the extent of the buffer can be shown on the property.
Response: Extent of buffer is shown on all plans to match existing P.U.D.
Response: We are using the buffer information provided by BHA.
Topic: Landscape Plan
Number: 10 BHA Created:3/6/2007
[3/6/07] Native plant species are to be used in the buffer zone for the Foothills Channel.
Additional plant material is needed in the buffer zone to mitigate the view and use of
the parking lot adjacent to the channel and meet Sections 3.4.1(E)(1), 3.4.1, 3.4.1(L).