HomeMy WebLinkAboutTIMBERLINE CHURCH EXPANSION - MAJOR AMENDMENT - 1-97B - CORRESPONDENCE - (5)F1 Be designed as a flat, hard, all-weather driving surface (asphalt or concrete) capable of
supporting fire apparatus weights. Compacted road base shall be used only for temporary
fire lanes or at construction sites.
❑ Have appropriate maintenance agreements that are legally binding and enforceable.
❑ Be designated on the plat as an Emergency Access Easement.
Maintain the required minimum width of 20 feet throughout the length of the fire lane.
97UFC 901.2.2.1; 901.3; 901.4.2; 902.2.1
Department: Stormwater-Water-Wastewater Issue Contact: Basil Hamdan
Topic: Details
Number: 72 Created: 5/22/2007
[5/22/07] Please provide an actual detail for Line E riprap with dimensions.
Topic: Easements
Number: 71 Created: 5/22/2007
[5/22/07] Please provide separate easements for areas within future pond that are being
dedicated as drainage easements.
Topic: Landscape Plan
Number: 73 Created: 5/22/2007
[5/22/07] There is a conflict between the proposed storm line and the tree in one of the
islands in Phase II construction, please adjust tree location to provide a minimum of 5 feet of
clearance.
Topic: Phasing Plans
Number: 70 Created: 5/22/2007
[5/22/07] Please show work that is being done within the channel area as being part of
Phase I.
The storm sewer system that goes through Phase II bringing flows from the existing parking
lot should be designated to be built with Phase I.
Provide an interim grading plan for swale along east property line for Phase I plans.
Please call for re -vegetation of areas within Phase II that will be disturbed during Phase I
grading operations.
Topic: Utility Plans
Number: 74 Created: 5/22/2007
[5/22/07] Please provide riprap on downstream end of spillway.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Sincerely:
Ted Shepard
Chief Planner
Page 3
Timberline Church plan set, the revisions to the Timberline Church plan set shall govern.
As-built/record drawing information pertaining to the minor amendment shall be shown on
the revision drawings." If there are questions or concerns regarding this proposed note,
please let me know.
[4/24/07] The response from Northern indicated that the minor amendment information on
the construction plan set is to remain as the site contractor will be building off the plans. If
this is the case, why is there a minor amendment being approved prior to this major
amendment showing the exact information? It seems that the minor amendment should just
then be withdrawn if the contractor isn't intending to build off the revised sheets of the minor
amendment that shows this same information. I'd like to suggest a meeting with Northern,
myself, and Sheri Langenberger who is reviewing the minor amendment.
[3/14/07] I'd like to see the minor amendment indications on the drawings to be "faded
back" so that it is evident that the information shown in not being approved. With the
assumption that the minor amendment will be approved prior to the major amendment,
please add a note at the time of mylars for the major amendment indicating the approval
date of the minor amendment.
Number: 44 Created: 3/14/2007
[5/22/07] The response indicated that the emergency access easement has been
processed with the minor amendment, in reality it will be processed with this major
amendment and the minor amendment was approved without it.
[4/24/07] Deeds of dedication were provided, which require a $250 Transportation
Development Review Fee for each deed. Note that Sheri Langenberger had requested the
emergency access easement as part of the minor amendment, which will likely be process
through the minor amendment instead of the major amendment.
[3/14/07] Will the various easement and right-of-way dedications be done via plat or deed?
Number: 75 Created: 5/24/2007
[5/24/07] At the time of final submittal after public hearing, a Transportation Development
Review Fee of $1,000 is required. A Development Construction Permit (DCP) will be
required prior to any work pertaining to this major amendment.
Topic: Site Plan
Number: 76 Created: 5/24/2007
[5/24/07] Technical Services has redlined areas on the site plan that may be of concern for
scanability purposes. Please see the attached redlines.
Department: PFA Issue Contact: Carle Dann
Topic: Fire
Number: 7 Created: 3/6/2007
[5/23/071 The fire lane needs to be recorded by separate document, if the property is not
going to be replatted. (I worked on the fire lane location and specifications with folks from
Northern Engineering.)
[3/6/07] REQUIRED ACCESS: A fire lane is required. The fire lane shall be located so that
it provides unobstructed access to the Fire Department (automatic sprinkler) Connection.
This fire lane shall be visible by painting and signage, and maintained unobstructed at all
times. A fire lane plan shall be submitted for approval PRIOR to installation. In addition to
the design criteria already contained in relevant standards and policies, any new fire lane
must meet the following general requirements:
Page 2
k � 9 6al
STAFF PROJECT REVIEW
MOM
City of Fort Collins
BHA Design Date: 05/25/2007
Whitney Duvall
1608 Oakridge Dr
Fort Collins, CO 80525
Staff has reviewed your submittal for TIMBERLINE CHURCH EXPANSION MAJOR
AMENDMENT, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Dana Leavitt
Topic: General
Number: 9 Created: 3/6/2007
[5/25/07] Regarding the House Side Shields on the parking lot light fixtures, adding a note
to the plan is not enough. Please add to schedule so that all lights adjacent to the natural
feature can be identified separately from other fixtures.
[4/23/07] Photometric Plan provided. Use house -side shields on fixtures adjacent to
Foothills Channel.
[3/6/07] Photometric Plan is required.
Topic: Utility Plans
Number: 26 Created: 3/7/2007
[5/25/071 If light types are hard to read, provide another type where overlap occurs.
[4/24/07] Show top of embankment of existing conditions also, otherwise ok. Show LOD on
all plan sets with in the Utility Plans.
[3/7/07] The edge of the Foothills Channel and the top of embankment needs to be located
on the Existing Conditions Plan, the Demolition Plan sheets, the Horizontal Control Plan
sheets, the Grading Plan sheets and the Overlot Grading Plan sheets. The Limits of
Development (LOD), once established, shall be show on all of the plans referenced above.
Department: Engineering Issue Contact: Marc Virata
Topic: Construction Plan
Number: 41 Created: 3/14/2007
[5/22/07] On Sheet 6 the demo plan indicates removal of work along Timberline, I'm
assuming that this needs to be rectified with the right turn lane no longer being constructed.
[4/24/07] Carried over pending the City Traffic Engineer's okay in not constructing the right
turn lane. (Note that if the City's Traffic Engineer is okay with not constructing the right turn
lane, the plan set still reflects demo work occurring in this area.)
[3/14/07] What is the hatched out area along Timberline on the plan set, and is the median
being proposed for modification?
Topic: General
Number: 35 Created: 3/14/2007
[5/22/07] Given that the minor amendment is being shown on the plans, please amend the
note on the cover sheet regarding the minor amendment to read as follows: "Minor
Amendment design for Timberline Church was approved on May 16, 2007 via revisions to
the Timberline Church construction plan set. Information shown regarding the minor
amendment within this plan set is for informational purposes only. In the event of a
discrepancy between the information shown in this plan set and the revisions to the
Page I