Loading...
HomeMy WebLinkAboutTIMBERLINE CHURCH P.U.D. - FINAL - 1-97A - CORRESPONDENCE - BUILDING EXTERIOR (3)THE LARSON GROUP 9&070,2.Zl so 6750 A Prof al Corporatioradonn LETTER OF TRANSMITTAL TO: Fort Collins — Current Planning DATE: January 27, 2000 281 North College Ave Fort Collins, CO 80522-0580 PROJECT: Timberline Church JAN 2 8 2000 By— Archltecture Planning Interior Design Construction Management 720N.Tejon Street Colorado Springs, CO 80903 719. 471.7676T 719, 471,801 OF LarsonGprAOLCCM Attn: Ted Shepard PROJECT NO. 0-95171.00 COPIES DATE DESCRIPTION 1 1/06/2000 Building Exterior Elevation Construction Document These are transmitted as checked below. ❑ For approval ❑ Reviewed ❑ Rejected ■ For your use ❑ Revise and resubmit ❑ Furnish as corrected ❑ For review and comment ❑ As requested VIA: UPS Overnight REMARKS: Ted — We have been developing the construction documents for the church over the past several months. The exterior elevations have been adjusted in the process of the project development. The most notable change is the north elevation of the building. Upon close examination, the change should be evident. The window wall type of glazing was reduced, however the building theme of the building expanse broken up with large glazed areas at roof vaults is maintained. In my opinion, the revised elevation is more unified with the other building elevations in terms of the fenestration. I would like to hear your reaction so that I may be able to get the mylars submitted early next week. Signed: Qn, CE UJ G�Mrr+- Copies to: John Sailer File 4E