Corporatioradonn LETTER OF TRANSMITTAL
TO: Fort Collins — Current Planning DATE: January 27, 2000
281 North College Ave
Fort Collins, CO 80522-0580 PROJECT: Timberline Church
JAN 2 8 2000
By—
Archltecture
Planning
Interior Design
Construction
Management
720N.Tejon Street
Colorado Springs,
CO 80903
719. 471.7676T
719, 471,801 OF
LarsonGprAOLCCM
Attn: Ted Shepard
PROJECT NO. 0-95171.00
COPIES DATE DESCRIPTION
1 1/06/2000 Building Exterior Elevation Construction Document
These are transmitted as checked below.
❑ For approval ❑ Reviewed ❑ Rejected
■ For your use ❑ Revise and resubmit ❑ Furnish as corrected
❑ For review and comment ❑ As requested
VIA: UPS Overnight
REMARKS: Ted — We have been developing the construction documents for the
church over the past several months. The exterior elevations have been adjusted in
the process of the project development. The most notable change is the north
elevation of the building. Upon close examination, the change should be evident.
The window wall type of glazing was reduced, however the building theme of the
building expanse broken up with large glazed areas at roof vaults is maintained. In
my opinion, the revised elevation is more unified with the other building elevations in
terms of the fenestration. I would like to hear your reaction so that I may be able to
get the mylars submitted early next week.
Signed: Qn, CE UJ G�Mrr+-
Copies to: John Sailer
File 4E