HomeMy WebLinkAboutTIMBERLINE CHURCH P.U.D. - FINAL - 1-97A - CORRESPONDENCE - REVISIONS (5)I — Phasing lines clearly indicated.
m — Sheet numbering will include: site plan, landscape plan, elevations
n — Cover sheet included.
o — Actual square footage indicated in the footprint of each proposed building.
p — What was not indicated on the site plan is that both phases have large
auditoriums. Phase 1 having 1352 seats, and phase 2 having 2500 seats.
Following the LDGS guidelines we developed the parking with a ratio of 1
space for every 5 seats. Parking information on the cover sheet has been
updated.
q — The USDA/CSU property indicated as for sale is in fact not for sale, thus is not
feasible to obtain for easements at this time. See letter to Mike Ludwig dated
FEB 12, 1998.
r — 30 foot paving provided at the north stubs.
s thru ab notes have been revised.
Landscape plan
Ac. — Idicated.
Ad. — There is not a City ordinance requiring this, to our (Cityscape Urban Design)
Knowledge.
Shade trees are provided in all parking lot islands, where possible.
Ae. — Formal spacing of deciduous trees around the building does not conform with the
massing/grouping effect that is desired by the architect and landscape architect.
Evergreens were provided to break up the mass of the building, where they did not
conflict with windows.
Af. — Indicated.
Ag. — Indicated.
Ah. — Foundation plantings were increased, and taller materials was provided Where it
would not conflict with windows. There are also some species of Enunymus shown that
will climb the walls.
Ai. — Revised.
Aj. — Revised.
Ak. — Revised.
Al. — Shrub beds were provided around perimeter of parking lot, except where berming
will provide the necessary screening of headlights.
Building Elevations
am — Final building elevations have been indicated.
an — elevations have been provided,
ITEM #7 Natural Resources Department
A — Provided.
B — Taken under consideration.
ITEM #8
All redline sheets have been returned.
ITEM #9
All redline sheets have been returned.
ITEM #10
Comment sheet from the Stormwater Utility and redline sheets have been returned.
ITEM #11
Public service comments have been addressed.
First Assembly Of God
Final
Planned Unit Development
REPONSE TO STAFF COMMENTS SUBMITTED ON DECEMBER 22, 1997
May 13, 1999
ITEM #1 lighting and Power Utility
Transformer locations will be coordinated with the Lighting and Power Engineering
Department.
ITEM #2 US WEST
a - We understand the conditions regarding US WEST service.
b — Conditions regarding all conduit, ditch crossings, and street crossings for telephone
facilities within the project will be addressed at time of permitting. A minimum of
8'x5' will be provided for telephone.
ITEM #3 Zoning Department
a — All handicapped ramp have been indicated on the site plan/plat
b — topographical lines removed.
c — dimensions indicated
d — Trash elevations indicated for phase 1 (phase 2 similar condition).
ITEM #4 Building Inspections Department
a — buildings greater than 5000 s.f. will be equipped with fire suppression systems or be
compartmentalized by fire resistive construction. Phase 1 and 2 will have area
separations and conform to the adopted code at the time of filing. We are looking
at type II FR construction with area separations.
b —"accessible route of travel' has been indicated and will comply with all UBC and
ANSI standards /regulations.
c — All buildings will comply with Fort Collins Nonresidential Energy Code and Local
amendments.
d — all proposed facilities will seek approval by the Larimer County Health department.
E — All proposed buildings will comply with the adopted code of the time.
ITEM #5 Mapping Department
a — "right of way dedicated by this plat" indicated.
b — Tract A's usage is designated open space.
ITEM #6 Current Planning department
a — Returned as requested
PLAT
b — Names and titles provided
SITE PLAN
c thru f Dimensions provided
g — Pavement treatment has been indicated as Painted stripping
h — curb ramps indicated
i — All building envelopes dimensioned and indicated
j — All "odd" sidewalk conditions have been addressed or redesigned.
k — Site plan format will stay the same with the exception of adding a cover sheet.