HomeMy WebLinkAboutTIMBERLINE CHURCH P.U.D. - FINAL - 1-97A - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETRevisions Routing Sheet
1
FILE: PROJECT PLANNER
mom
ENGINEERING:
ADVANCE PLANNING
mmm
m
MOM
R.O.W. PLANNING
mmmm
mmmmm
WATER CONSERVATION
mmmm
mmmm
PUBLIC SERVICE
mmmmm
mmm
DITCH COMPANY
womm
mmmm
mm
mom
Project:
Planner:
Engineer:
Traffic Operations:
f�aov,,A -�
4)4uz-R� ; ZCo, (a�tc1
Items Requested
Site land Plat Utility Drainage Rpt Other Items Required
Redlined Items Being Returned
Site land Plat Utility Drainage Rpt Other Items Being Returned
Engineering
✓
✓"
✓
(4s� 5 ( F-��
Stormwater
,i
✓
✓
✓
5t \A ct 5 ( Saw w, Boa,
Water/Wastewate
/
✓
,/
�/
✓
TraM( Operations
Trans. Planning
Transfort
__
Natural Resources
,/
✓
Park Planning
✓
o�,,r 5�d2
Z
Z
z
I
�Innni�.� rp5�o�c� S
Totals
Z
3
131
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.