HomeMy WebLinkAboutNORTHGATE COMMONS - ODP - 38-96 - CORRESPONDENCE - (5)15. What is the major employment center that you are claiming 20 points for on the
Residential Uses Density Chart?
This completes the staff comments at this time. Additional comments will be
forthcoming as they are received from City departments and outside reviewing
agencies. Please be aware of the following dates and deadlines (next page) to assure
your ability to stay on schedule for the February 24, 1997 Planning and Zoning Board
hearing:
Plan revisions are due no later than the end of the working day, February 5,
1997*. Please contact me for the number of folded revisions required for each
document.
* NO REVISIONS WILL BE REVIEWED AFTER THE ABOVE DEADLINE. IF REVISIONS
ARE NOT RECEIVED BY THIS DATE, THE ITEM WILL EITHER GO TO THE
PLANNING AND ZONING BOARD WITH A STAFF RECOMMENDATION BASED ON
THE ORIGINALLY SUBMITTED DOCUMENTS OR THE APPLICANT WILL HAVE THE
OPTION TO CONTINUE THE ITEM TO THE NEXT MONTH'S BOARD AGENDA.
PMT's (photo reduction of Site Plan, Landscape Plan, and Building Elevations to
8.5" x 11"), rendering (one each colored full-size Site Plan and/or Landscape Plan
and Building Elevations), and 8 folded copies of the final full-size Site Plan,
Landscape Plan, and Building Elevations revisions ( for the Planning and Zoning
Board members packets) are due on February 18, 1997.
Please contact me at 221-6750 if you have questions or concerns regarding these
comments or if you would like to schedule a meeting to discuss the comments.
4Je
Si erely,
S eve Olt
Project Planner
cc: Sheri Wamhoff
Eric Bracke
Natural Resources
Stormwater
RBD Engineers
Dana Lockwood
Project File
8. Rob Wilkinson of the Natural Resources Department stated that the comments
(above) for the ODP apply specifically to the Phase 1 PUD, as well.
9. Randy Balok of the Parks Planning Department stated that the residential units
will be assessed parkland fees for neighborhood parks, on a unit square footage
basis, and for community parks as part of the adopted Capital Improvements
Expansion Fees, also on a unit square footage basis.
10. Kathleen Reavis, the City's Transportation Planner, offered the following
comments:
a. Improvements along North College Avenue should include 8' wide bike
lanes and 7' wide detached sidewalks (with a 10' wide parkway between
back of curb and sidewalk).
b. Pad sites A, B, and C should have direct pedestrian connections to the
sidewalk along North College Avenue, with building entrances on North
College in addition to the entrances from the parking lots.
C. You need to provide pedestrian walkways and marked pedestrian
crossings of drive aisles through the parking lots (see notes on a marked -
up Site Plan for details. This plan is enclosed with the letter to Jim Sell
Design).
d. Comments b and c will require changes to the Landscape Plan.
Kathleen can be reached at 221-6608 if you have questions about these
comments.
11. Clark Mapes of the Advance Planning Department stated that the pedestrian -
oriented layout needs major changes. There is also concern about how the
layout and design of this project complies with the North College standards and
guidelines. It is important to schedule a meeting soon to discuss the concerns.
Copies of a marked -up Site Plan and colored perspective are enclosed with the
letter to Jim Sell Design.
12. The comments sheet received from the Eaton ditch Company stated that they
are not involved with this development proposal. The City has apparently sent
the plans to the wrong ditch company. The Larimer and Weld Canal Ditch
Company should be contacted as soon as possible.
13. Is it possible to make one or more bicycle/pedestrian connections from this
development to the north and east, across the canal? This would enhance the
potential for a good trail system in the area.
14. What is the proposed building material on the 7' of Building 'H' on Pad 'H'?
3. The Zoning Department offered the following comments:
a. The parking area serving Pad "A" will require one additional handicapped
vehicular parking space, or a total of three.
b. The eventual number of residential dwelling units and number of
bedrooms per unit may affect the minimum parking requirements.
C. Give actual dimensions of the building envelopes or pad sites on the Site
Plan and provide distances to two property lines (minimum) for each.
Please contact Gary Lopez, at 221-6760, if you have questions about these
comments.
4. The Poudre Fire Authority offered the following comments:
a. Fire sprinkler systems must be provided or the building must be fire
contained if greater than 5,000 square feet in size.
b. All turning radius for emergency access must meet the City standards,
which are 20' inside and 40' outside radius.
Please contact Roger Frasco, at 221-6570, if you have questions about these
comments.
5. The Light & Power Department offered the following comments:
a. Contact Light & Power to coordinate transformer locations for all pads.
b. Additional easements will be required for electric systems.
C. Additional charges to the developer will apply to removal and relocation of
overhead electric lines.
Please contact Alan Rutz, at 221-6700, if you have questions about these
comments.
6. A copy of the comments received from Sheri Wamhoff of the Engineering
Department is attached to this letter.
7. A copy of the comment sheet from Laurie D'Audney, the City's Utility Education
Specialist, is attached to this letter. Also, the general information for Water
Conservation Standards for Landscaping and Irrigation Systems is attached.
replacement is. In general, they prefer that the wetlands be avoided by
construction and development, and that transition areas of 100 feet or
greater be provided between the project and the wetlands, with such
areas being composed of native vegetation.
b. It appears that the property could be developed in a manner which avoids
all direct wetland disturbance and still allows reasonable use of the
property. Therefore, the appropriateness of the proposed plan and
wetland disturbance is being questioned.
C. The role of the proposed pond is also of concern.
d. Natural Resources will need a determination by the developer's
consultants regarding the current wildlife use of this property. How will it
be affected by the proposed wetland disturbance and mitigation, as well
as the proposed transitional areas, which are less than what they would
desire?
e. It is understood that the wetland areas are to be utilized for stormwater
management as well. How will this affect their current functional values?
Rob can be reached at 221-6600 if you have questions about these comments.
4. Randy Balok of the Parks Planning Department stated that the residential units
will be assessed parkland fees for neighborhood parks, on a unit square footage
basis, and for community parks as part of the adopted Capital Improvements
Expansion Fees, also on a unit square footage basis.
Phase 1 - Preliminary:
TCI of Fort Collins stated that they would like to have a utility easement on the
north side of Lot 1 running east for approximately 323'. Also, can Tract B be a
"drainage, utility, and access easement"?
2. Gary Huett of Public Service Company offered the following comments:
a. Additional utility easement requirements are as follows:
* northerly 20' of Lots 4 and 5.
* westerly 15' of Lot 5.
* southerly 20' of Lot 1.
* easterly 15' of Lots 1, 2, and 3.
b. The developer will have to coordinate paving and landscaping closely with
all utilities. No trees may be planted closer than 4' to any gas line.
Commu_ _y Planning and Environmental rvices
Current Planning
City of Fort Collins
January 16, 1997
Fred Haberecht
Jim Sell Design
117 East Mountain Avenue
Fort Collins, CO. 80524
Dear Fred,
Staff has reviewed your documentation for the Northgate Commons Overall
Development Plan and the Northgate Commons PUD, Phase 1 - Preliminary that
was submitted to the City on December 23, 1996, and would like to offer the following
comments:
Overall Development Plan:
The Light & Power Department offered the following comments:
a. Contact Light & Power to coordinate transformer locations for all pads.
b. Additional easements will be required for the electric system for the
development.
C. Additional charges will apply to removal and relocation of existing
overhead electric lines.
Please contact Alan Rutz, at 221-6700, with electric service -related questions.
2. Eric Bracke, the City's Traffic Engineer, has stated that North College Avenue
and Willox Lane intersection improvements (geometry and signal phasing) must
be part of this project. It is difficult to build with the existing car lot and restaurant
at their present locations.
3. Rob Wilkinson of the Natural Resources Department offered the following
comments:
a. There is a general concern about the level of wetland impact proposed.
The ODP is not clearly labeled regarding how many acres of wetlands are
to be disturbed and proportionally what the mitigation equation for
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750
FAX (970) 221-6378 • TDD (970) 224-6002