HomeMy WebLinkAboutNORTHGATE COMMONS - ODP - 38-96 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYHCS: Unsignalized Intersections Release 2.1c ESCW.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
180
Potential Capacity: (pcph)
1122
Movement Capacity: (pcph)
1122
Prob. of Queue -Free State:
0.90
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
360
Potential Capacity: (pcph)
1099
Movement Capacity: (pcph)
1099
Prob. of Queue -Free State:
0.78
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
1426
Potential Capacity: (pcph)
130
Major LT, Minor TH
Impedance Factor:
0.78
Adjusted Impedance Factor:
0.78
Capacity Adjustment Factor
due to Impeding Movements
0.78
Movement Capacity: (pcph)
--------------------------------------------------------
101
Intersection
Performance Summary
Avg. 95%
Flow Move Shared
Total Queue
Approach
Rate Cap Cap
Delay Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
---------
-------- ------ ------ ------
WB L 105 101
-------------- -----
332.0 12.2 F
163.3
WB R 110 1122 3.6 0.3 A
SB L 243 1099 4.2 1.0 A 0.9
Intersection Delay = 18.9 sec/veh
HCS: Unsignalized Intersections Release 2.1c ESCW.HCO Page 1
---------------------------------
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
-----------------------------------------------------------------------
Streets: (N-S) SITE DRIVE (E-W) COLLEGE
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst................... GC
Date of Analysis.......... 12/16/96
Other Information ..... ...ST� LT NOON PM
Two-way Stop -controlled In rsection
--------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCIs M
SU/RVIs (�)
CVIs M
PCEIs
------------
0 2 1
Y
270 50
.95 .95
0
---------------
1 2 0
N
145 606
.95 .95
0
1.10
---------------
1 0 1
80 90
.95 .95
0
1.10 1.10
---------------
■
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
------------Time
(tf)
------------------------------Gap
Left Turn Major Road
-(tg)
5.50
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor
Road 6.50
3.30
Left Turn Minor Road
7.00
3.40
I i I
HCS: Unsignalized Intersections Release 2.1c Page 1
-------------------------------
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
---------------------------------------------------------- - -
Streets: (N-S) SIC EAST DRIVE (E-W) WILLOX
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst....... GC
Date of Analysis.......... 12/16/96
Other Information.......ST LT O NOON PM
Two-way Stop -controlled In ersection
----------------------------------------------------------------------
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's M
SU/RV's (�)
CV's M
PCE's
------------
0 1 < 0
N
243 6
.95 .95
0
---------------
0 > 1 0
N
8 152
.95 .95
0
1.10
----------------
1 0 1
12 7
.95 .95
0
1.10 1.10
----------------
Adjustment Factors
Vehicle
Critical
Follow-up
'
Maneuver
(tg)------------Time
(tf)
----
-------------------
Left Turn Major
-------------------Gap
Road
-----
5.00
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor
Road 6.00
3.30
Left Turn Minor
Road
6.50
3.40
11
0 The above assumptions are consistent with the long term geometry established by
the City. Site specific improvements related to background traffic growth and the
development of the Northgate Commons will be determined in the following sections
of this report.
IV. TRAFFIC IMPACTS
In order to assess operating conditions with Northgate Commons operational,
highway capacity analyses procedures were utilized at key intersections. These are:
1) the North College Avenue - Willox Lane intersection, 2) the site access to North
College Avenue, and 3) the site access to Willox Lane. Analyses were undertaken
for both short- and long-term conditions. At the onset of these undertakings, traffic
volumes were reviewed at each location in order to identify the need for auxiliary
lanes or an upgrade in intersection control. At the site access points to the City
Street system, auxiliary lane requirements. were determined using engineering
judgement and the warrants presented in NCHRP Report 279, "Intersection Chan-
nelization Design Guide". At the North College Avenue intersection, the State
Highway Access Code criteria and the "Manual on Uniform Traffic Control Devices"
traffic signal warrants were utilized. Findings for both short- and long-term condi-
tions and anticipated operating conditions are documented in the following sections.
A. Short-term
Short-term traffic volumes were reviewed to determine the need for additional
roadway geometry, auxiliary lanes, and traffic control improvements. This involved a
review of traffic volumes and roadway geometry at major intersections. Three lane
roadway sections (one inbound and two outbound lanes) were assumed on all site
approaches to the adjacent street system. Appropriate intersection improvements
are indicated below.
12
Figure 2
EXISTING GEOMETRY
HCS: Unsignalized Intersections Release 2.1c Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows:
(vph)
219
434
Potential Capacity:
(pcph)
1072
835
Movement Capacity:
(pcph)
1072
835
Prob. of Queue -Free
State:
0.91
0.74
--------------------------------------------------------
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows:
(vph)
285
474
Potential Capacity:
(pcph)
1254
1019
Movement Capacity:
(pcph)
1254
1019
Prob. of Queue -Free
State:
0.91
0.87
--------------------------------------------------------
Step 3: TH from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows:
(vph)
909
936
Potential Capacity:
(pcph)
364
352
Capacity Adjustment
Factor
due to Impeding Movements
0.80
0.80
Movement Capacity:
(pcph)
290
281
Prob. of Queue -Free
State:
1.00
1.00
--------------------------------------------------------
Step 4: LT from Minor
Street
NB
SB
--------------------------------------------------------
Conflicting Flows:
(vph)
968
914
Potential Capacity:
(pcph)
291
313
Major LT, Minor TH
Impedance Factor:
0.79
0.79
Adjusted Impedance
Factor:
0.84
0.84
Capacity Adjustment
Factor
due to Impeding Movements
0.63
0.77
Movement Capacity:
--------------------------------------------------------
(pcph)
182
240
Intersection Performance Summary
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Dela
'
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
-Length
(veh)
-LOS-
(sec/veh)
(sec/vy--
---e-e-t
NB
L
-Rate-
128
-Cap--
182
-Cap--
> 183
-Delay-
63.1
5.8
F
NB
T
1
290
>
37.3
NB
R
98
1072
3.7
0.2
A
SB
L
69
240
> 241
21.0
1.3
D
'
SB
T
1
281
>
9.6
SB
R
215
835
5.8
1.2
B
'
EB
L
128
1019
4.0
0.4
A
1.2
WB
L
110
1254
3.1
0.2
A
0.5
' Intersection Delay = 7.6 sec/veh
HCS: Unsignalized Intersections Release 2.1c Page 1
------------------------------
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
-------------------------------------------------------------------
Streets: (N-S) S/C-SITE DRIVE (E-W) WILLOX
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... GC
Date of Analysis.......... 12/196
Other Information ........ .ST QLT AM NOON PM
Two-way Stop -controlled Intersection
-----------------------------------------------------------------------
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCIs M
SU/RVIs M
CV's M
PCEIs
------------
1 1 < 0
N
110 145 125
.95 .95 .95
0
1.10
---------------
1 1 < 0
N
95 375 75
.95 .95 .95
0
1.10
----------------
0 > 1 1
110 1 85
.95 .95 .95
0
1.10 1.10 1.10
•--------------
0 > 1 1
60 1 185
.95 .95 .95
0
1.10 1.10 1.10
--------------
Adjustment
Factors
Vehicle
Critical
Follow-up
Maneuver
(tf)
------------------------------GaP
Left Turn Major Road
-(tg'------------Time
5.00
2.10
Right Turn Minor Road
5.50
2.60
'
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
I 1
HCS: Unsignalized Intersections Release 2.1c Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows:
(vph)
194
212
Potential Capacity:
(pcph)
1104
1081
Movement Capacity:
(pcph)
1104
1081
Prob. of Queue -Free
State:
0.93
0.74
--------------------------------------------------------
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows:
(vph)
247
257
Potential Capacity:
(pcph)
1307
1293
Movement Capacity:
(pcph)
1307
1293
Prob. of Queue -Free
State:
0.93
0.85
--------------------------------------------------------
Step 3: TH from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows:
(vph)
714
722
Potential Capacity:.
(pcph)
460
456
Capacity Adjustment
Factor
due to Impeding Movements
0.79
0.79
Movement Capacity:
(pcph)
362
359
Prob. of Queue -Free
State:
1.00
1.00
--------------------------------------------------------
Step 4: LT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows:
(vph)
797
704
Potential Capacity:
(pcph)
366
414
Major LT, Minor TH
Impedance Factor:
0.79
0.79
Adjusted Impedance
Factor:
0.84
0.84
Capacity Adjustment
Factor
due to Impeding Movements
0.62
0.78
Movement Capacity:
--------------------------------------------------------
(pcph)
227
322
Flow
Rate
Movement
(pcph)
--------
NB L
------
98
NB T
1
NB R
75
I SB L
SB T
SB R
I ' EB L
WB L
64
1
278
197
92
Intersection Performance Summary
Avg. 95%
Move
Shared
Total
Queue
Approach
Cap
Cap
Delay
Length
LOS
Delay
(pcph)
(pcph)(sec/veh)
-------
(veh)
-------
-----
(sec/veh)
---------
------
227
------
> 228
27.8
2.4
D
362
>
17.3
1104
3.5
0.1
A
322
> 323
13.9
0.8
C
359
>
6.3
1081
4.5
1.2
A
1293
3.3
0.6
A
1.4
1307
3.0
0.1
A
0.7
I' Intersection Delay = 4.5 sec/veh
HCS: Unsignalized Intersections Release 2.1c Page 1
--------------------------------
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
--------------------------------------------------------
Streets: (N-S) S/C-SITE DRIVE (E-W) WILLOX
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... GC
Date of Analysis.......... 12/196
Other Information ....... ..ST(LTAM NOON PM
Two-way Stop -controlled Intersection
-----------------------------------------------------------------------
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCI M
SU/RV's (�)
CV's M
PCE's
------------
1 1 < 0
N
170 135 100
.95 .95 .95
0
1.10
--------------
1 1 < 0
N
80 160 85
.95 .95 .95
0
1.10
----------------
0 > 1 J.
85 1 65
.95 .95 .95
0
1.10 1.10 1.10
----------------
0 > 1 1
55 1 240
.95 .95 .95
0
1.10 1.10 1.10
--------------
Adjustment Factors
Vehicle
Critical
Follow-up
'
Maneuver
(tg)------------
Time -(tf)
---
------------------- -------------------Gap
Left Turn Major Road
-----
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor
Road 6.00
3.30
Left Turn Minor Road
6.50
3.40
7
HCS: Unsignalized Intersections Release 2.1c Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
336
234
Potential Capacity: (pcph)
936
1054
Movement Capacity: (pcph)
936
1054
Prob. of Queue -Free State:
0.99
0.85
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
368
268
'
Potential Capacity: (pcph)
1145
1278
Movement Capacity: (pcph)
1145
1278
Prob. of Queue -Free State:
0.98
0.87
Street
NB
SB
Step 3: TH from Minor
---------------------------------------------------
Conflicting Flows: (vph)
772
770
Potential Capacity: (pcph)
429
430
Capacity Adjustment Factor
due to Impeding Movements
0.86
0.86
'
Movement Capacity: (pcph)
367
368
Prob. of Queue -Free State:
1.00
1.00
--------------------------------------------------------
Step 4: LT from Minor Street
NB
-----------
SB
----------------------------
Conflicting Flows: (vph)
812
744
Potential Capacity: (pcph)
359
393
'
Major LT, Minor TH
Impedance Factor:
0.85
0.85
Adjusted Impedance Factor:
0.89
0.89
'
Capacity Adjustment Factor
due to Impeding Movements
0.75
0.88
Movement Capacity: (pcph)
270
344
--------------------------------------------------------
Intersection
Performance Summary
Avg.
95%
Flow Move Shared
Total
Queue
Approach
Rate Cap Cap
Delay
Length
LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
(veh)
-------
-----
(sec/veh)
-------
-------- ------ ------ ------
NB L 18 270 > 274
-------
14.1
0.1
C
NB T 1 367 >
10.2
NB R 12 936
3.9
0.0
A
'
SB L 29 344 > 345
SB T 1 368 >
11.4
0.2
C
5.2
SB R 162 1054
4.0
0.6
A
EB L 162 1278
3.2
0.4
A
0.9
'
WB L 23 1145
3.2
0.0
A
0.2
Intersection Delay =
1.7 sec/veh
HCS: Unsignalized Intersections Release 2.1c Page 1
-----------------------------------
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
-----------------------------------------------------------------------
Streets: (N-S) S/C-SITE DRIVE (E-W) WILLOX
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ....... .......... GC
Date of Analysis ........... 12/1 6
Other Information ........ +.59 LT ® NOON PM
Two-way Stop -controlled Intersection
--------------------------------------------------------------------
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCI M
SU/RV's M
CV's M
PCE's
------------
1 1 < 0
N
140 290 60
.95 .95 .95
0
1.10
---------------
1 1 < 0
N
20 190 65
.95 .95 .95
0
1.10
----------------
0 > 1 1
25 1 140
.95 .95 .95
0
1.10 1.10 1.10
--------------
Adjustment
Factors
Vehicle
Critical
Follow-up
'
Maneuver
Gap(tg)------------Time-(tf)
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
'
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
11
HCS: Unsignalized Intersections Release 2.1c ESCW.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows:
(vph)
536
Potential Capacity:
(pcph)
741
Movement Capacity:
(pcph)
741
Prob. of Queue -Free
State:
0.78
--------------------------------------------------------
Step 2: LT from Major
Street
SB NB
--------------------------------------------------------
Conflicting Flows:
(vph)
1071
Potential Capacity:
(pcph)
456
Movement Capacity:
(pcph)
456
Prob. of Queue -Free
State:
0.70
--------------------------------------------------------
Step 4: LT from Minor
Street
WB EB
--------------------------------------------------------
Conflicting Flows:
(vph)
1876
Potential Capacity:
(pcph)
67
Major LT, Minor TH
Impedance Factor:
0.70
Adjusted Impedance
Factor:
0.70
Capacity Adjustment
Factor
due to Impeding Movements
0.70
Movement Capacity:
--------------------------------------------------------
(pcph)
47
Intersection Performance Summary
Avg.
95%
Flow
Move
Shared Total
Queue
Rate
Cap
Cap Delay
Length
LOS
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
-------
-----
--------
WB L
------
133
------
47
--------------
*
44.5
F
WB R
162
741
6.2
1.0
B
SB L
139
456
11.3
1.5
C
Intersection Delay = 188.6 sec/veh
* The calculated value was greater than 999.9.
Approach
Delay
(sec/veh)
*
1.8
HCS: Unsignalized Intersections Release 2.1c ESCW.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
------------------------------------------------------------
Streets: (N-S) SITE DRIVE (E-W) COLLEGE
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... GC
Date of Analysis.......... 12/16 96 ^
Other Information ........ .ST L AM NOON ififiVrt)
Two-way Stop -controlled Intersec ion
-------------------------------- ---------------------------------
--------------------------------------
Northbound Southbound Eastbound Westbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- --
No. Lanes 1
Stop/Yield
Volumes
PHF
Grade
MCI M
SU/RV's M
CV's M
PCE's
0 2 1
Y
1017 100
.95 .95
0
1 2 0
N
120 645
.95 .95
0
1.10
0
115 140
.95 .95
0
1.10 1.10
--------------
Adjustment
Factors
Vehicle
Critical
Follow-up
Maneuver
--------------------
Time (tf)
----
-------- ------------------------------Gap-(tg)
Left Turn Major Road
5.50
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.50
3.30
Left Turn Minor Road
7.00
3.40
I ,
II
HCS: Unsignalized Intersections Release 2.1c ESCW.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
319
Potential Capacity: (pcph)
954
Movement Capacity: (pcph)
954
Prob. of Queue -Free State:
0.81
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
638
Potential Capacity: (pcph)
779
Movement Capacity: (pcph)
779
Prob. of Queue -Free State:
0.69
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
1520
Potential Capacity: (pcph)
113
Major LT, Minor TH
Impedance Factor:
0.69
Adjusted Impedance Factor:
0.69
Capacity Adjustment Factor
due to Impeding Movements
0.69
Movement Capacity: (pcph)
--------------------------------------------------------
78
Intersection
Performance Summary
Avg. 95%
Flow Move Shared
Total Queue
Approach
Rate Cap Cap
Delay Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
(veh)
-----
(sec/veh)
---------
-------- ------ ------ ------
WB L 128 78
--------------
* 28.7 F
535.7
WB R 185 954 4.7 0.8 A
SB L 238 779 6.7 1.5 B 1.6
Intersection Delay = 80.0 sec/veh
* The calculated value was greater than 999.9.
HCS: Unsignalized Intersections Release 2.1c ESCW.HCO Page 1
------------------------------------
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
------------------------------------------------------------------
Streets: (N-S) SITE DRIVE (E-W) COLLEGE
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst. GC
Date of Analysis.......... 12/16 6
Other Information ......... ST AM PM
Two-way Stop -controlled Intersection00
-----------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCIs M
SU/RVIs (�)
CVIs M
PCEIs
------------
0 2 1
Y
606 110
.95 .95
0
---------------
1 2 0
N
205 633
.95 .95
0
1.10
----------------
0 0 0
1 0 J.
110 160
.95 .95
0
1_1010
------1_
Adjustment
Factors
Vehicle
Critical
Follow-up
'
Maneuver
(tg)
(tf)
------------------------------GaP
Left Turn Major Road
------------Time
5.50
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.50
3.30
Left Turn Minor Road
7.00
3.40
1
L
1
II
HCS: Unsignalized Intersections Release 2.1c ESCW.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
-----------------------------------------------------------------------
Streets: (N-S) SITE DRIVE (E-W) COLLEGE
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst...... ........... GC
Date of Analysis.......... 12/1 6
Other Information ......... ST LT AM NOON PM
Two-way Stop -controlled Intersection
-----------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCIs M
SU/RVIs M
CVIs M
PCEIs
------------
0 2 1
Y
342 105
.95 .95
0
---------------
1 2 0
N
210 804
.95 .95
0
1.10
----------------
Adjustment Factors
1 0 1
90 95
.95 .95
0
1.10 1.10
--------------
Vehicle
Critical
Follow-up
'
Maneuver
(tg)
------------------------------Gap
Left Turn Major Road
------------Time
5.50
- --
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.50
3.30
Left Turn Minor Road
7.00
3.40
t
II
I
11
HCM: SIGNALIZED INTERSECTION SUMMARY
Version 2.4c
12-16-1996
Center
For Microcomputers
In Transportation
-----------------------------------------------------------------------
Streets: (E-W)
WILLOX
(N-S) COLLEGE
Analyst: GC
File Name: WCPM.HC9
Area Type:
Comment: EX
Other
ST
T,T AM NOON
12-16-96
M LTPHALL WB RT W/PH 1L NS EB RT
Eastbound
Westbound
_________--_______
Northbound
Southbound
L
T R
L T
R
L T
R
L T R
No. Lanes
----
1
---- ----
1 1
---- ----
1 1
----
1
---- ----
1 2
----
1
---- ---- ----
1 2 1
Volumes
175
120 100
190 175
500
100 1120
140
370 750 70
Lane W (ft)
12.0
12.0 12.0
12.0 12.0
12.0
12.0 12.0
12.0
12.0 12.0 12.0
RTOR Vols
0
100
0
0
Lost Time
3.00
3.00 3.00
3.00 3.00
3.00
3.00 3.00
3.00
3.00 3.00 3.00
-----------------------------------------------------------------------
Signal Operations
Phase Combination
1 2
3 4
5
6 7 8
EB Left
* *
NB Left
Thru
*
Thru
Right
*
Right
Peds
Peds
WB Left
* *
SB Left
Thru
*
Thru
Right
*
Right
Peds
Peds
NB Right
EB Right
SB Right
WB Right
Green
14.OA
23.OA
Green 26.OA
37.OP
Yellow/AR
0.0
5.0
Yellow/AR 0.0
5.0
Cycle Length: 110
secs Phase
combination
order: #1
#2 #5 #6
-----------------------------------------------------------------------
Intersection
Performance
Summary
Lane
Group:
Adj Sat
v/c
g/C
Approach:
Mvmts
Cap
Flow
Ratio
Ratio Delay
LOS Delay LOS
-----
EB L
----
355
-------
1770
-----
0.518
----- -----
0.227 18.0
--- ----- ---
C 20.7 C
T
423
1863
0.298
0.227 22.9
C
R
360
1583
0.292
0.227 22.9
C
WB L
417
1770
0.480
0.227 17.5
C 17.6 C
T
423
1863
0.435
0.227 24.0
C
R
734
1583
0.574
0.464 14.7
B
NB L
438
1770
0.240
0.445 8.2
B 28.3 D
T
1321
3725
0.937
0.355 31.4
D
R
561
1583
0.262
0.355 16.4
C
SB L
438
1770
0.888
0.445 34.4
D 23.9 C
T
1321
3725
0.627
0.355 19.7
C
R
561
1583
0.132
0.355 15.5
C
Intersection
Delay =
23.9 sec/veh Intersection
LOS = C
Lost Time/Cycle,
-----------------------------------------------------------------------
L = 12.0
sec Critical
v/c(x)
= 0.831
HCM: SIGNALIZED INTERSECTION SUMMARY
Version 2.4c
12-16-1996
Center
For Microcomputers In Transportation
-----------------------------------------------------------------------
Streets: (E-W)
WILLOX
(N-S) COLLEGE
Analyst: GC
File Name: WCN.HC9
Area Type:
Comment: EX
Other
ST
LT AM NOO
12-16-96
PM LTPHALL WB RT
W/PH LTNS EB RT
-----------------------------------------------------------------------
Eastbound
Westbound
Northbound
Southbound
L
T R
L T
R
L T
R
L T R
No. Lanes
----
1
---- ----
1 1
---- ----
1 1
----
1
---- ----
1 2
----
1
---- ---- ----
1 2 1
Volumes
135
160 90
270 135
260
95 725
135
325 785 65
Lane W (ft)
12.0
12.0 12.0
12.0 12.0
12.0
12.0 12.0
12.0
12.0 12.0 12.0
RTOR Vols
0
0
0
0
Lost Time
13.00
3.00 3.00
3.00 3.00
3.00
3.00 3.00
3.00
3.00 3.00 3.00
-----------------------------------------------------------------------
Signal Operations
Phase Combination
1 2
3 4
5
6 7 8
EB Left
* *
NB Left
Thru
*
Thru
Right
*
Right
Peds
Peds
WB Left
* *
SB Left
Thru
*
Thru
Right
*
Right
Peds
Peds
NB Right
EB Right
SB Right
WB Right
Green
15.OA
13.OA
Green 20.OA 32.OP
Yellow/AR
0.0
5.0
Yellow/AR 0.0
5.0
Cycle Length:
90
secs Phase combination
order: #1
#2 #5
#6
-----------------------------------------------------------------------
Intersection
Performance
Summary
Lane
Group:
Adj Sat
v/c
g/C
Approach:
Mvmts
Cap
Flow
Ratio
Ratio Delay
LOS
Delay LOS
-----
EB L
----
387
-------
1770
-----
0.367
----- -----
0.300 14.5
---
B
----- ---
20.0 C
T
310
1863
0.541
0.167 23.7
C
R
264
1583
0.360
0.167 21.9
C
WB L
363
1770
0.782
0.300 22.9
C
19.2 C
T
310
1863
0.457
0.167 22.6
C
R
616
1583
0.445
0.389 13.5
B
NB L
417
1770
0.240
0.411 6.5
B
13.6 B
T
1407
3725
0.569
0.378 14.8
B
R
598
1583
0.237
0.378 12.4
B
SB L
417
1770
0.820
0.411 22.6
C
17.0 C
T
1407
3725
0.616
0.378 15.3
C
R
598
1583
0.114
0.378 11.8
B
Intersection
Delay =
16.8 sec/veh Intersection LOS = C
Lost Time/Cycle,
-----------------------------------------------------------------------
L = 12.0
sec Critical
v/c(x)
= 0.744
HCM: SIGNALIZED INTERSECTION SUMMARY
Version 2.4c
12-16-1996
Center For Microcomputers
In Transportation
---------------------------------------------------
Streets: (E-W)
WILLOX
(N-S) COLLEGE
Analyst: GC
File Name: WCAM.HC9
Area Type:
Comment: EX
Other
ST
NOON
12-16-96
.-'M LTPHALL WB RT W/PH 1LTN EB RT
-------------------------
Eastbound
Westbound
Northbound
Southbound
L
T R
L T
R
L T
R
L T R
---- ----
No. Lanes
----
1
---- ----
1 1
---- ----
1 1
----
1
---- ----
1 2
----
1
----
1 2 1
Volumes
155
160 105
200 120
100
55 420
105
250 1065 115
Lane W (ft)
12.0
12.0 12.0
12.0 12.0
12.0
12.0 12.0
12.0
12.0 12.0 12.0
RTOR Vols
0
100
0
0
Lost Time
3.00
3.00 3.00
3.00 3.00
3.00
3.00 3.00
3.00
3.00 3.00 3.00
-----------------------------------------------------------------------
Signal Operations
Phase Combination
1 2
3 4
5
6 7 8
EB Left
* *
NB Left
Thru
*
Thru
Right
*
Right
Peds
Peds
WB Left
* *
SB Left
Thru
*
Thru
Right
*
Right
Peds
Peds
NB Right
EB Right
SB Right
WB Right
Green
15.OA
20.OA
Green 17.OA
38.OP
Yellow/AR
0.0
5.0
Yellow/AR 0.0
5.0
Cycle Length:
100
secs Phase combination order: #1
#2 #5 #6
-----------------------------------------------------------------------
Intersection Performance Summary
Lane
Group:
Adj Sat v/c
g/C
Approach:
Mvmts
Cap
Flow
Ratio
Ratio Delay
LOS Delay LOS
--- ----- ---
-----
EB L
----
446
-------
1770
-----
0.365
----- -----
0.270 14.5
B 19.1 C
T
410
1863
0.410
0.220 22.0
C
R
348
1583
0.319
0.220 21.3
C
WB L
401
1770
0.526
0.270 15.8
C 17.9 C
T
410
1863
0.307
0.220 21.2
C
R
727
1863
0.000
0.390 0.0
A
NB L
322
1770
0.180
0.310 9.3
B 12.8 B
T
1490
3725
0.311
0.400 13.3
B
R
633
1583
0.175
0.400 12.5
B
SB L
476
1770
0.553
0.310 8.5
B 16.8 C
T
1490
3725
0.790
0.400 19.1
C
R
633
1583
0.191
0.400 12.6
B
Intersection Delay =
16.4 sec/veh Intersection LOS = C
Lost Time/Cycle,
-----------------------------------------------------------------------
L = 12.0
sec Critical v/c(x)
= 0.756
APPENDIX C
HCS: Unsignalized Intersections Release 2.1c Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
148
368
Potential Capacity: (pcph)
1165
901
Movement Capacity: (pcph)
1165
901
Prob. of Queue -Free State:
0.95
0.82
--------------------------------------------------------
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
164
400
Potential Capacity: (pcph)
1432
1105
Movement Capacity: (pcph)
1432
1105
Prob. of Queue -Free State:
0.94
0.89
--------------------------------------------------------
Step 3: TH from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
733
718
Potential Capacity: (pcph)
450
458
Capacity Adjustment Factor
due to Impeding Movements
0.84
0.84
Movement Capacity: (pcph)
378
384
Prob. of Queue -Free State:
1.00
1.00
--------------------------------------------------------
Step 4: LT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
776
728
Potential Capacity: (pcph)
376
401
Major LT, Minor TH
Impedance Factor:
0.84
0.84
Adjusted Impedance Factor:
0.87
0.87
Capacity Adjustment Factor
due to Impeding Movements
0.72
0.83
Movement Capacity: (pcph)
--------------------------------------------------------
270
333
Intersection Performance Summary
Avg.
95%
Flow
Move
Shared
Total
Queue
Approach
Rate
Cap
Cap
Delay
Length
LOS
Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
-------
-----
(sec/veh)
---------
--------
NB
L
------
64
------
270
------
> 271
-------
17.5
1.1
C
NB
T
1
378
>
10.8
NB
R
58
1165
3.3
0.0
A
SB
L
29
333
> 334
11.8
0.2
C
SB
T
1
384
>
6.0
SB
R
162
901
4.9
0.7
A
EB
L
122
1105
3.7
0.4
A
1.5
WB
L
81
1432
2.7
0.0
A
0.4
Intersection Delay
=
2.8 sec/veh
HCS: Unsignalized Intersections Release 2.1c Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
-----------------------------------------------------------------------
Streets: (N-S) S/C-SITE DRIVE (E-W) WILLOX
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... GC
Date of Analysis.......... 2/16/96
Other Information........ ST LT AM NOON PM
Two-way Stop -controlled In rsection
------------------------------------------------------------
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCIs M
SU/RVIs M
CVIs M
PCE's
------------
1 1 < 0
N
105 125 30
.95 .95 .95
0
1.10
---------------
1 1 < 0
N
70 320 60
.95 .95 .95
0
1.10
----------------
0 > 1 1
55 1 50
.95 .95 .95
0
1.10 1.10 1.10
----------------
0 > 1 1
25 1 140
.95 .95 .95
0
1.10 1.10 1.10
--------------
Adjustment
Factors
Vehicle
Critical
Follow-up
Maneuver
-------------Gap-(tg)------------Time-(tf)
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
' {
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
I I
HCS: Unsignalized Intersections Release 2.1c Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows:
(vph)
200
182
Potential Capacity:
(pcph)
1096
1120
Movement Capacity:
(pcph)
1096
1120
Prob. of Queue -Free
State:
0.97
0.78
--------------------------------------------------------
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows:
(vph)
279
221
Potential Capacity:
(pcph)
1262
1345
Movement Capacity:
(pcph)
1262
1345
Prob. of Queue -Free
State:
0.98
0.97
--------------------------------------------------------
Step 3: TH from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows:
(vph)
479
518
Potential Capacity:
(pcph)
612
583
Capacity Adjustment
Factor
due to Impeding Movements
0.95
0.95
Movement Capacity:
(pcph)
582
555
Prob. of Queue -Free
State:
1.00
1.00
--------------------------------------------------------
Step 4: LT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows:
(vph)
553
453
Potential Capacity:
(pcph)
507
579
Major LT, Minor TH
Impedance Factor:
0.95
0.95
Adjusted Impedance
Factor:
0.96
0.96
Capacity Adjustment
Factor
due to Impeding Movements
0.75
0.94
Movement Capacity:
--------------------------------------------------------
(pcph)
379
542
Intersection Performance Summary
�1
Avg.
95%
Flow
Move
Shared Total
Queue
Approach
Movement
Rate
(pcph)
Cap
(pcph)
Cap Delay
(pcph)(sec/veh)
Length
(veh)
LOS
-----
Delay
(sec/veh)
---------
--------
NB
L
------
41
------
379
-------------
> 382 10.6
-------
0.3
C
NB
T
1
582
>
7.6
NB
R
29
1096
3.4
0.0
A
SB
L
46
542
> 542 7.3
0.2
B
SB
T
1
555
>
4.6
SB
R
249
1120
4.1
1.0
A
EB
L
35
1345
2.7
0.0
A
0.3
WB
L
29
1262
2.9
0.0
A
0.3
;�,
Intersection Delay =
2.1 sec/veh
HCS: Unsignalized Intersections Release 2.1c Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
---------------------------------------------------------- -
Streets: (N-S) S/C-SITE DRIVE (E-W) WILLOX
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... GC
Date of Analysis.......... 12/16/96
Other Information_ .......ST) LT AM NOO PM
Two-way Stop -controlled In ersection
--------------------------------------------------------------------
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's M
SU/RV's M
CV's M
PCE's
------------
1 1 < 0
N
30 115 150
.95 .95 .95
0
1.10
---------------
1 1 < 0
N
25 135 75
.95 .95 .95
0
1.10
----------------
0 > 1 1
35 1 25
.95 .95 .95
0
1.10 1.10 1.10
----------------
0 > 1 1
40 1 215
.95 .95 .95
0
1.10 1.10 1.10
--------------
Adjustment
Factors
-.,
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
---------
Time (tf)
--------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1c Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
268
192
Potential Capacity: (pcph)
1013
1107
Movement Capacity: (pcph)
1013
1107
Prob. of Queue -Free State:
0.99
0.86
,.:
--------------------------------------------------------
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
274
215
Potential Capacity: (pcph)
1269
1354
Movement Capacity: (pcph)
1269
1354
Prob. of Queue -Free State:
0.99
0.91
Step 3: TH from Minor Street
NB
SB
`
--------------------------------------------------------
Conflicting Flows: (vph)
600
582
Potential Capacity: (pcph)
528
540
Capacity Adjustment Factor
due to Impeding Movements
0.91
0.91
Movement Capacity: (pcph)
478
489
Prob. of Queue -Free State:
1.00
1.00
--------------------------------------------------------
Step 4: LT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
648
582
Potential Capacity: (pcph)
446
487
Major LT, Minor TH
Impedance Factor:
0.90
0.90
Adjusted Impedance Factor:
0.93
0.93
Capacity Adjustment Factor
due to Impeding Movements
0.80
0.92
Movement Capacity: (pcph)
355
446
r--------------------------------------------------------
Intersection
Performance Summary
Avg.
95%
Flow Move Shared
Total
Queue
Approach
Rate Cap Cap
Delay
Length
LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
(veh)
-------
-----
(sec/veh)
---------
_
-------- ------ ------ ------
NB L 23 355 > 359
-------
10.7
0.1
C
NB T 1 478 >
8.4
NB R 12 1013
3.6
0.0
A
SB L 23 446 > 448
SB T 1 489 >
8.5
0.0
B
4.4
SB R 156 1107
3.8
0.5
A
EB L 116 1354
2.9
0.2
A
0.8
WB L 12 1269
2.9
0.0
A
0.1
Intersection Delay
=
1.7 sec/veh
HCS: Unsignalized Intersections Release 2.1c Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
--------------------------------------------------- --------------------
Streets: (N-S) S/C-SITE DRIVE (E-W) WILLOX
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... GC
Date of Analysis.......... 2/16/96
Other Information....... ST LT� NOON PM
Two-way Stop -controlled In errection
---------------------------------------------------------------
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's M
SU/RV's M
CV's M
PCE's
------------
1 1 < 0
N
100 250 10
.95 .95 .95
0
1.10
1 1 < 0
N
10 160 45
.95 .95 .95
0
1.10
----------------
0 > 1 1
20 1 10
.95 .95 .95
0
1.10 1.10 1.10
----------------
Adjustment Factors
0 > 1 1
20 1 135
.95 .95 .95
0
1.10 1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1c ESCW.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
406
Potential Capacity: (pcph)
862
Movement Capacity: (pcph)
862
Prob. of Queue -Free State:
0.89
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
812
Potential Capacity: (pcph)
628
Movement Capacity: (pcph)
628
Prob. of Queue -Free State:
0.81
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
1349
Potential Capacity: (pcph)
145
Major LT, Minor TH
Impedance Factor:
0.81
Adjusted Impedance Factor:
0.81
Capacity Adjustment Factor
due to Impeding Movements
0.81
Movement Capacity: (pcph)
--------------------------------------------------------
117
Intersection
Performance Summary
Avg.
95%
Flow Move Shared
Total
Queue
Approach
Rate Cap Cap
Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
(veh)
------- -----
(sec/veh)
---------
-------- ------ ------ ------
WB L 81 117
-------
93.0
5.0 F
45.9
WB R 92 862
4.7
0.3 A
SB L 122 628
7.1
0.8 B
1.5
Intersection Delay = 5.1 sec/veh
HCS: Unsignalized Intersections Release 2.1c ESCW.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
----------------------------------------------------------------------
Streets: (N-S) SITE DRIVE (E-W) COLLEGE
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... GC
Date of Analysis.......... /16/96
Other Information........{STJ LT AM NOON PM
Two-way Stop -controlled InVersection
-------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's ($)
SU/RV's M
CV's M
PCE's
------------
0 2 1
Y
771 65
.95 .95
0
1 .2 0
N
105 405
.95 .95
0
1.10
----------------
Adjustment Factors
1 0 1
70 80
.95 .95
0
1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.50
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.50
3.30
Left Turn Minor Road
7.00
3.40
HCS: Unsignalized Intersections Release 2.1c ESCW.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
240
Potential Capacity: (pcph)
1046
Movement Capacity: (pcph)
1046
Prob. of Queue -Free State:
0.87
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
480
Potential Capacity: (pcph)
947
Movement Capacity: (pcph)
947
Prob. of Queue -Free State:
0.80
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
1087
Potential Capacity: (pcph)
214
Major LT, Minor TH
Impedance Factor:
0.80
Adjusted Impedance Factor:
0.80
Capacity Adjustment Factor
due to Impeding Movements
0.80
Movement Capacity: (pcph)
--------------------------------------------------------
171
Intersection
Performance Summary
Avg. 95%
Flow Move Shared
Total Queue
Approach
Rate Cap Cap
Delay Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
(veh)
------- -----
(sec/veh)
---------
-------- ------ ------ ------
WB L 105 171
-------
53.1 4.2 F
WB R 139 1046 4.0 0.5 A
SB L 191 947 4.8 0.9 A
Intersection Delay = 4.6 sec/veh
25.0
1.4
HCS: Unsignalized Intersections Release 2.1c ESCW.HCO Page 1
-------------------------------
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
---------------------------------------------------------
Streets: (N-S) SITE DRIVE (E-W) COLLEGE
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... GC
Date of Analysis.......... /16/96
Other Information........ ST LT AM NOON PM
Two-way Stop -controlled Intersection
-------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's M
SU/RV's (�)
CV's M
PCE's
------------
0 2 1
Y
456 80
.95 .95
0
---------------
1 2 0
N
165 411
.95 .95
0
1.10
----------------
1 0 1
90 120
.95 .95
0
1.10 1.10
---------------
Adjustment
Factors
S
Vehicle
Critical
Follow-up
'
Maneuver
(tf)
-----
--------------------- ---------Gap-(tg)------------Time
Left Turn Major Road
----
5.50
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.50
3.30
Left Turn Minor Road
7.00
3.40
HCS: Unsignalized Intersections Release 2.1c ESCW.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
142
Potential Capacity: (pcph)
1173
Movement Capacity: (pcph)
1173
Prob. of Queue -Free State:
0.91
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
284
Potential Capacity: (pcph)
1207
Movement Capacity: (pcph)
1207
Prob. of Queue -Free State:
0.86
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
1076
Potential Capacity: (pcph)
217
Major LT, Minor TH
Impedance Factor:
0.86
Adjusted Impedance Factor:
0.86
Capacity Adjustment Factor
due to Impeding Movements
0.86
Movement Capacity: (pcph)
--------------------------------------------------------
187
Intersection
Performance Summary
Avg. 95%
Flow Move Shared
Total Queue
Approach
Rate Cap Cap
Delay Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
(veh)
-----
(sec/veh)
---------
-------- ------ ------ ------
WB L 92 187
--------------
37.5 2.9 E
WB R 105 1173 3.4 0.2 A
SB L 168 1207 3.5 0.5 A
Intersection Delay = 3.1 sec/veh
19.4
0.7
HCM: SIGNALIZED INTERSECTION SUMMARY
Version 2.4c 12-16-1996
Center For Microcomputers In Transportation
----------------------------------------------------------------------
Streets: (E-W)
WILLOX
(N-S) COLLEGE
Analyst: GC
File Name: WCN.HC9
Area Type:
Comment: EX
Othe
LT AM NOON
16-96
PM LTPHALL WB RT W/PH
--------------------------------------------------
Eastbound
Westbound
Northbound Southbound
L
---- ----
T R
----
L T
R
L T R
L T
R
No. Lanes
1
1<
---- ----
1 1
----
1
---- ---- ----
1 2 1
---- ----
1 2
----
1
Volumes
145
110 85
155 140
410
115 795 105
140 530
75
Lane W (ft)
12.0 12.0
12.0 12.0
12.0
12.0 12.0 12.0
12.0 12.0
12.0
RTOR Vols
0
100
0
0
Lost Time
-----------------------------------------------------------------------
13.00 3.00 3.00
3.00 3.00
3.00
3.00 3.00 3.00
3.00 3.00
3.00
Signal Operations
Phase Combination
1 2
3 4
5 6 7
8
EB Left
* *
NB Left
Thru
*
Thru
Right
*
Right
Peds
Peds
WB Left
* *
SB Left
Thru
*
Thru
Right
*
Right
Peds
Peds
NB Right
EB Right
SB Right
WB Right
Green
15.OA
25.OA
Green 10.OA 50.OP
Yellow/AR
0.0
5.0
Yellow/AR 0.0 5.0
Cycle Length: 110
secs Phase
combination order: #1 #2 #5 #6
-----------------------------------------------------------------------
Intersection
Performance Summary
Lane Group:
Adj Sat
v/c
g/C Approach:
Mvmts
Cap
Flow
Ratio
Ratio Delay LOS Delay
LOS
-----
EB L
----
432
-------
1770
-----
0.354
----- ----- --- -----
0.245 15.3 C 20.0
---
C
TR
427
1741
0.480
0.245 23.6 C
WB L
371
1770
0.439
0.245 15.9 C 20.1
C
T
457
1863
0.321
0.245 22.1 C
R
532
1583
0.614
0.336 21.2 C
NB L
323
1770
0.375
0.155 8.1 B 12.3
B
T
1761
3725
0.499
0.473 13.1 B
R
748
1583
0.148
0.473 10.6 B
SB L
203
1770
0.724
0.155 17.7 C 12.7
B
T
1761
3725
0.333
0.473 11.8 B
R
748
1583
0.106
0.473 10.4 B
Intersection
Delay =
15.1 sec/veh Intersection LOS
= C
Lost Time/Cycle, L
-----------------------------------------------------------------------
= 9.0
sec Critical v/c(x) = 0.582
HCM: SIGNALIZED INTERSECTION SUMMARY
Version 2.4c 12-16-1996
Center For Microcomputers In Transportation
-----------------------------------------------------------------------
Streets: (E-W)
WILLOX
(N-S) COLLEGE
Analyst: GC
File Name: WCAM.HC9
Area Type:
Other
12-16-96
Comment: EX
ST
LT AM NOON
PM LTPHALL WB RT
----------------------------------------------------------------------
Eastbound
-
Westbound
Northbound
Southbound
L
T R
L T
R
L T R
L T R
No. Lanes
---- ----
1
----
1 <
---- ----
1 1
----
1
---- ---- ----
1 2 1
---- ---- ----
1 2 1
Volumes
120
120 75
260 95
210
110 510 155
125 575 75
Lane W (ft)
12.0 12.0
12.0 12.0
12.0
12.0 12.0 12.0
12.0 12.0 12.0
RTOR Vols
0
0
0
0
Lost Time
-----------------------------------------------------------------------
13.00 3.00 3.00
3.00 3.00
3.00
3.00 3.00 3.00
3.00 3.00 3.00
Signal Operations
Phase Combination
1 2
3 4
5 6 7 8
EB Left
* *
NB Left
Thru
*
Thru
Right
*
Right
Peds
Peds
WB Left
* *
SB Left
Thru
*
Thru
Right
*
Right
Peds
Peds
NB Right
EB Right
SB Right
WB Right
Green
13.OA
18.OA
Green 7.OA 42.OP
Yellow/AR
0.0
5.0
Yellow/AR 0.0 5.0
Cycle Length: 90
secs Phase
combination order: #1 #2 #5 #6
-----------------------------------------------------------------------
Intersection
Performance Summary
Lane Group:
Adj Sat
v/c
g/C Approach:
Mvmts
-----
Cap
-----
Flow
Ratio
Ratio Delay LOS Delay LOS
EB L
471
-------
1770
-----
0.268
----- ----- --- -----
0.256 12.7 B 17.8 C
TR
390
1755
0.526
0.222 21.0 C
WB L
354
1770
0.774
0.256 21.4 C 21.5 C
T
414
1863
0.242
0.222 18.6 C
R
352
1583
0.628
0.222 22.9 C
NB L
271
1770
0.428
0.122 7.0 B 8.6 B
T
1821
3725
0.310
0.489 9.0 B
R
774
1583
0.211
0.489 8.5 B
SB L
314
1770
0.420
0.122 6.8 B 8.7 B
T
1821
3725
0.349
0.489 9.2 B
R
774
1583
0.102
0.489 8.0 B
Intersection
Delay =
12.7 sec/veh Intersection LOS = B
Lost Time/Cycle, L
-----------------------------------------------------------------------
= 12.0
sec Critical v/c(x) = 0.538
HCM: SIGNALIZED INTERSECTION SUMMARY
Version 2.4c
12-16-1996
Center For Microcomputers In Transportation
-----------------------------------------------------------------------
Streets: (E-W) WILLOX
(N-S) COLLEGE
Analyst: GC
File Name:
Area Type:
Other
12-16-96
Comment: EX ST
LT NOON
PM LTPHALL WB
RT
---------------
-----------------------------------------------------
Eastbound
Westbound
Northbound
Southbound
L
T R
L T
R
L T
R
L T
R
No. Lanes
---- ----
1
----
1 <
---- ----
1 1
----
1
---- ---- ----
1 2
1
---- ----
1 2
----
1
Volumes
120
130 90
185 85
85
80 295
75
195 775
120
Lane W (ft)
12.0 12.0
12.0 12.0
12.0
12.0 12.0 12.0
12.0 12.0
12.0
RTOR Vols
0
0
0
0
Lost Time
13.00 3.00
3.00
3.00 3.00
3.00
3.00 3.00 3.00
3.00 3.00
3.00
-----------------------------------------------------------------------
Signal Operations
Phase Combination
1 2
3 4
5
6 7
8
EB Left
* *
NB Left
Thru
*
Thru
Right
*
Right
Peds
Peds
WB Left
* *
SB Left
Thru
*
Thru
Right
*
Right
Peds
Peds
NB Right
EB Right
SB Right
WB Right
Green
15.OA
20.OA
Green 7.OA
48.OP
Yellow/AR
0.0
5.0
Yellow/AR 0.0
5.0
Cycle Length:
100
secs Phase
combination order: #1 #2 #5
#6
-----------------------------------------------------------------------
Intersection
Performance Summary
Lane
Group:
Adj Sat
v/c
g/C
Approach:
Mvmts
Cap
Flow
Ratio
Ratio Delay
LOS
Delay
LOS
-----
EB L
----
494
-------
1770
-----
0.255
----- -----
0.270 13.9
---
B
-----
20.8
---
C
TR
385
1748
0.603
0.220 24.6
C
WB L
335
1770
0.582
0.270 16.8
C
18.7
C
T
410
1863
0.217
0.220 20.7
C
R
348
1583
0.256
0.220 20.9
C
NB L
177
1770
0.475
0.110 8.9
B
8.8
B
T
1862
3725
0.176
0.500 8.9
B
R
792
1583
0.100
0.500 8.5
B
SB L
488
1770
0.420
0.110 7.8
B
9.9
B
T
1862
3725
0.460
0.500 10.6
B
R
792
1583
0.159
0.500 8.8
B
Intersection
Delay =
12.7 sec/veh Intersection
LOS
= B
Lost Time/Cycle, L
-----------------------------------------------------------------------
= 12.0
sec Critical
v/c(x) =
0.583
APPENDIX B
,,
11
I
141
I
HCS: Unsignalized Intersections Release 2.1c Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
172
Potential Capacity: (pcph)
1133
Movement Capacity: (pcph)
1133
Prob. of Queue -Free State:
0.98
--------------------------------------------------------
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
215
Potential Capacity: (pcph)
1354
Movement Capacity: (pcph)
1354
Prob. of Queue -Free State:
0.99
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0.99
--------------------------------------------------------
Step 4: LT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
557
Potential Capacity: (pcph)
504
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.99
Movement Capacity: (pcph)
--------------------------------------------------------
500
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
------- -----
(sec/veh)
---------
-------- ------ ------ -------------
NB L 168 500 10.8
1.7 C
NB R 23 1133 3.2 0.0 A
WB L 8 1354 2.7 0.0 A
Intersection Delay = 2.2 sec/veh
0.1
HCS: Unsignalized Intersections Release 2.1c Page 1
-----------------------
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
-----------------------------------------------------------------------
Streets: (N-S) SIC WEST DRIVE (E-W) WILLOX
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... GC
Date of Analysis.......... 12/16/96
Other Information ........ .EX ST LT AM NOON PM
Two-way Stop -controlled Intersection
------------------------------------------------------------
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's M
SU/RV's M
CV's M
PCE's
------------
0 1 < 0
N
123 82
.95 .95
0
---------------
0 > 1 0
N
7 359
.95 .95
0
1.10
----------------
1 0 1
145 20
.95 .95
0
1.10 1.10
•--------------
djustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap(tg)
- --
Left Turn Major Road
------------Time
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor
Road 6.00
3.30
Left Turn Minor Road
6.50
3.40
A
It
1
HCS: Unsignalized Intersections Release 2.1c Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
162
Potential Capacity: (pcph)
1146
Movement Capacity: (pcph)
1146
Prob. of Queue -Free State:
0.98
--------------------------------------------------------
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
203
Potential Capacity: (pcph)
1372
Movement Capacity: (pcph)
1372
Prob. of Queue -Free State:
0.99
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0.99
--------------------------------------------------------
Step 4: LT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
340
Potential Capacity: (pcph)
673
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.99
Movement Capacity: (pcph)
--------------------------------------------------------
665
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
------- -----
(sec/veh)
---------
-------- ------ ------ -------------
NB L 34 665 5.7
0.0 B
4.7
NB R 24 1146 3.2 0.0 A
WB L 15 1372 2.7 0.0 A 0.2
Intersection Delay = 0.6 sec/veh
HCS: Unsignalized Intersections Release 2.1c Page 1
-------------------------------
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
-----------------------------------------------------------------------
Streets: (N-S) SIC WEST DRIVE (E-W) WILLOX
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... GC
Date of Analysis....... ... /16/96
Other Information ...... ...EX ST LT AM NOON PM
Two-way Stop -controlled In rsection
------------------------------------------------------------ ---
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's M
SU/RV's M
CV's M
PCE's
------------
0 1 < 0
N
114 79
.95 .95
0
---------------
0 > 1 0
N
13 156
.95 .95
0
1.10
----------------
1 0 1
29 21
.95 .95
0
1.10 1.10
----------------
0 0 0
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
(tg)------------Time
(tf)
--------------------------------
Left Turn Major Road
------Gap
-----
5.00
----
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor
Road 6.00
3.30
Left Turn Minor Road
6.50
3.40
I
HCS: Unsignalized Intersections Release 2.1c Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
262
Potential Capacity: (pcph)
1020
Movement Capacity: (pcph)
1020
Prob. of Queue -Free State:
0.99
--------------------------------------------------------
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
269
Potential Capacity: (pcph)
1276
Movement Capacity: (pcph)
1276
Prob. of Queue -Free State:
1.00
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
1.00
--------------------------------------------------------
Step 4: LT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
438
Potential Capacity: (pcph)
590
Major LT, Minor TH
Impedance Factor:
1.00
Adjusted Impedance Factor:
1.00
Capacity Adjustment Factor
due to Impeding Movements
1.00
Movement Capacity: (pcph)
--------------------------------------------------------
589
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
-----
(sec/veh)
---------
-------- ------ ------ -------------
NB L 22 589 6.3
-------
0.0 B
5.7
NB R 7 1020 3.6 0.0 A
WB L 2 1276 2.8 0.0 A 0.0
Intersection Delay = 0.3 sec/veh
HCS: Unsignalized Intersections Release 2.1c Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
----------------------------------------------------------------------
Streets: (N-S) SIC WEST DRIVE (E-W) WILLOX
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... GC
Date of Analysis.......... 12/16/96 Other Information .........EX ST LT (A7+i NOON PM
Two-way Stop -controlled In ersection
-----------------------------------------------------------------------
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's M
SU/RV's M
CV's M
PCE's
0 1 < 0
N
243 12
.95 .95
0
----------------
0 > 1 0
N
2 164
.95 .95
0
1.10
•---------------
1 0 1
19 6
.95 .95
0
1.10 1.10
•---------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
(tg)------------
Time (tf)
--------------------------------
Left Turn Major Road
------Gap
-----
5.00
----
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor
Road 6.00
3.30
Left Turn Minor Road
6.50
3.40
I I
I I
HCS: Unsignalized Intersections Release 2.1c Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
138
Potential Capacity: (pcph)
1179
Movement Capacity: (pcph)
1179
Prob. of Queue -Free State:
0.96
--------------------------------------------------------
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
150
Potential Capacity: (pcph)
1454
Movement Capacity: (pcph)
1454
Prob. of Queue -Free State:
0.95
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0.94
--------------------------------------------------------
Step 4: LT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
537
Potential Capacity: (pcph)
517
Major LT, Minor TH
Impedance Factor:
0.94
Adjusted Impedance Factor:
0.94
Capacity Adjustment Factor
due to Impeding Movements
0.94
Movement Capacity: (pcph)
--------------------------------------------------------
484
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
-----
(sec/veh)
---------
-------- ------ ------ -------------
NB L 52 484 8.3
-------
0.3 B
NB R 53 1179 3.2 0.0 A
WB L 75 1454 2.6 0.0 A
Intersection Delay = 1.1 sec/veh
5.7
0.4
HCS: Unsignalized Intersections Release 2.1c Page 1
--------------------------------
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
-------------------------------------------------------------------- -
Streets: (N-S) SIC EAST DRIVE (E-W) WILLOX
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... GC
Date of Analysis.......... 2/16/96
Other Information........ST LT AM NOON PM
Two-way Stop -controlled Intersection
-----------------------------------------------------------------------
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's M
SU/RV's M
CV's M
PCE's
------------
0 1 < 0
N
120 23
.95 .95
0
---------------
0 > 1 0
N
65 314
.95 .95
0
1.10
----------------
1 0 1
45 46
.95 .95
0
1.10 1.10
----------------
Adjustment
Factors
Vehicle
Critical
Follow-up
'
Maneuver
(tg)------------Time
(tf)
----
------------------------------ --------Gap
Left Turn Major Road
-----
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
r
HCS: Unsignalized Intersections Release 2.1c Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
130
Potential Capacity: (pcph)
1190
Movement Capacity: (pcph)
1190
Prob. of Queue -Free State:
0.98
--------------------------------------------------------
Step 2: LT from Major Street
WB EB
--------------------------------------------------------
Conflicting Flows: (vph)
142
Potential Capacity: (pcph)
1467
Movement Capacity: (pcph)
1467
Prob. of Queue -Free State:
0.98
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0.98
--------------------------------------------------------
Step 4: LT from Minor Street
NB SB
--------------------------------------------------------
Conflicting Flows: (vph)
291
Potential Capacity: (pcph)
718
Major LT, Minor TH
Impedance Factor:
0.98
Adjusted Impedance Factor:
0.98
Capacity Adjustment Factor
due to Impeding Movements
0.98
Movement Capacity: (pcph)
--------------------------------------------------------
705
Intersection Performance Summary
Avg.
95%
Flow
Move
Shared Total
Queue
Approach
Rate
Cap
Cap Delay
Length
LOS
Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
--------
NB L
------
28
------
705
-------------
5.3
-------
0.0
-----
B
---------
4.4
NB R
20
1190
3.1
0.0
A
WB L
24
1467
2.5
0.0
A
0.3
Intersection Delay = 0.7 sec/veh
HCS: Unsignalized Intersections Release 2.1c Page 1
----------------------------
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
------------------------------------------------------------------
Streets: (N-S) SIC EAST DRIVE (E-W) WILLOX
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... GC
Date of Analysis.......... 12/16/96
Other Information.........®. ST LT AM NOON PM
Two-way Stop -controlled Intersection
-----------------------------------------------------------------------
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's M
SU/RV's (�)
CV's M
PCE's
------------
0 1 < 0
N
112 23
.95 .95
0
---------------
0 > 1 0
N
21 132
.95 .95
0
1.10
----------------
1 0 1
24 17
.95 .95
0
1.10 1.10
----------------
Adjustment
Factors
Vehicle
Critical
Follow-up
'
Maneuver
(tg)------------
Time -(tf)
-------------------------------- ------Gap
Left Turn Major Road
-----
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
I
HCS: Unsignalized Intersections Release 2.1c Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
259
Potential Capacity: (pcph)
1024
Movement Capacity: (pcph)
1024
Prob. of Queue -Free State:
0.99
--------------------------------------------------------
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
262
Potential Capacity: (pcph)
1286
Movement Capacity: (pcph)
1286
Prob. of Queue -Free State:
0.99
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0.99
--------------------------------------------------------
Step 4: LT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
427
Potential Capacity: (pcph)
599
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.99
Movement Capacity: (pcph)
--------------------------------------------------------
594
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
------- -----
(sec/veh)
---------
-------- ------ ------ -------------
NB L 14 594 6.2
0.0 B
NB R 8 1024 3.5 0.0 A
WB L 9 1286 2.8 0.0 A
Intersection Delay = 0.3 sec/veh
5.2
0.1
HCM: SIGNALIZED INTERSECTION SUMMARY
Version 2.4c
12-16-1996
Center For Microcomputers
In Transportation
-----------------------------------------------------------------------
Streets: (E-W) WILLOX
(N-S) COLLEGE
Analyst: GC
File Name:
Area Type- Other
Comment: EX ST LT AM
NOON
16-96
PvM
-----------------------------
Eastbound
----------------------------------------
Westbound
Northbound
Southbound
L T R
L T
R
L T R
L T
R
No. Lanes
---- ---- ----
1 1<
---- ----
1 1<
----
---- ---- ----
1 2 1
---- ----
1 2
----
1
Volumes
104 79 73
49 Ill
344
83 711 36
90 450
51
Lane W (ft)
12.0 12.0
12.0 12.0
12.0 12.0 12.0
12.0 12.0
12.0
RTOR Vols
0
0
0
0
Lost Time 13.00
3.00 3.00
3.00 3.00
3.00
3.00 3.00 3.00
3.00 3.00
3.00
-----------------------------------------------------------------------
Signal Operations
Phase Combination 1 2
3 4
5
6 7
8
EB Left
*
NB Left
Thru
*
Thru
Right
*
Right
Peds
Peds
WB Left
*
SB Left
Thru
*
Thru
Right
*
Right
Peds
Peds
NB Right
EB Right
SB Right
WB Right
Green
45.OA
Green 55.OP
Yellow/AR
5.0
Yellow/AR 5.0
Cycle Length: 110 secs Phase
combination
order: #1 #5
-----------------------------------------------------------------------
Intersection
Performance
Summary
Lane Group:
Adj Sat
v/c
g/C
Approach:
Mvmts
Cap Flow
Ratio
Ratio Delay LOS
Delay
LOS
-----
EB L
-----------
134 314
-----
0.812
----- ----- ---
0.427 37.9 D
-----
23.0
---
C
TR
738 1728
0.217
0.427 12.9 B
WB L
473 1107
0.110
0.427 12.2 B
17.7
C
TR
706 1652
0.679
0.427 18.3 C
NB L
343 662
0.254
0.518 9.6 B
10.4
B
T
1930 3725
0.407
0.518 10.5 B
R
820 1583
0.046
0.518 8.5 B
SB L
191 369
0.497
0.518 12.8 B
9.9
B
T
1930 3725
0.258
0.518 9.5 B
R
820 1583
0.066
0.518 8.5 B
Intersection
Delay =
13.3 sec/veh Intersection LOS
= B
Lost Time/Cycle,
-----------------------------------------------------------------------
L = 6.0
sec Critical v/c(x) = 0.639
HCM: SIGNALIZED INTERSECTION SUMMARY
Version 2.4c
12-16-1996
Center For Microcomputers
In Transportation
-----------------------------------------------------------------------
Streets: (E-W) WILLOX
(N-S) COLLEGE
Analyst: GC
File Name:
Area Type• Other
Comment:
ST LT AM
NOON
12-16-96
PM
-----------------------------------------------------------------------
Eastbound
Westbound
Northbound
Southbound
L T R
L T
R
L T R
L T
R
No. Lanes
---- ---- ----
1 1<
---- ----
1 1<
----
---- ---- ----
1 2 1
---- ----
1 2
----
1
Volumes
64 78 61
48 75
162
77 436 22
93 463
49
Lane W (ft)
12.0 12.0
12.0 12.0
12.0 12.0 12.0
12.0 12.0
12.0
RTOR Vols
0
0
0
0
Lost Time 13.00
3.00 3.00
3.00 3.00
3.00
3.00 3.00 3.00
3.00 3.00
3.00
-----------------------------------------------------------------------
Signal Operations
Phase Combination
1 2
3 4
5
6 7
8
EB Left
*
NB Left
Thru
*
Thru
Right
*
Right
Peds
Peds
WB Left
*
SB Left
Thru
*
Thru
Right
*
Right
Peds
Peds
NB Right
EB Right
SB Right
WB Right
Green
25.OA
Green 55.OP
Yellow/AR
5.0
Yellow/AR 5.0
Cycle Length:
90 secs Phase
combination order: #1 #5
-----------------------------------------------------------------------
Intersection
Performance Summary
Lane Group:
Adj Sat
V/c
g/C
Approach:
Mvmts
Cap Flow
Ratio
Ratio Delay LOS
Delay
LOS
-----
EB L
-----------
213 711
-----
0.314
----- ----- ---
0.300 16.0 C
-----
15.8
---
C
TR
522 1740
0.280
0.300 15.6 C
WB L
332 1106
0.154
0.300 15.0 B
17.0
C
TR
502 1672
0.498
0.300 17.4 C
NB L
436 689
0.186
0.633 4.5 A
4.5
A
T
2359 3725
0.204
0.633 4.5 A
R
1003 1583
0.023
0.633 4.0 A
SB L
457 721
0.215
0.633 4.6 A
4.5
A
T
2359 3725
0.217
0.633 4.5 A
R
1003 1583
0.052
0.633 4.0 A
Intersection
Delay =
8.0 sec/veh Intersection LOS
= B
Lost Time/Cycle, L = 6.0
-----------------------------------------------------------------------
sec Critical v/c(x) = 0.307
HCM: SIGNALIZED INTERSECTION SUMMARY
Version 2.4c
12-16-1996
Center For Microcomputers
In Transportation
-----------------------------------------------------------------------
Streets: (E-W) WILLOX
(N-S) COLLEGE
Analyst: GC
File Name:
Area Type: Other
12-16-96
Comment • EX ST LT O NOON
PM
-----------------------------------------------------------------------
Eastbound
Westbound
Northbound
Southbound
L T R
L T
R
L T R
L T
R
No. Lanes
---- ---- ----
1 1<
---- ----
1 1<
----
---- ---- ----
1 2 1
---- ----
1 2
----
1
Volumes
75 103 73
38 80
65
45 243 13
139 668
93
Lane W (ft)
12.0 12.0
12.0 12.0
12.0 12.0 12.0
12.0 12.0
12.0
RTOR Vols
0
0
0
0
Lost Time
13.00 3.00 3.00
3.00 3.00
3.00
3.00 3.00 3.00
3.00 3.00
3.00
-----------------------------------------------------------------------
Signal Operations
Phase Combination 1 2
3 4
5
6 7
8
EB Left *
NB Left
Thru *
Thru
Right *
Right
Peds
Peds
WB Left *
SB Left
Thru *
Thru
Right *
Right
Peds
Peds
NB Right
EB Right
SB Right
WB Right
Green 30.OA
Green 60.OP
Yellow/AR 5.0
Yellow/AR 5.0
Cycle Length: 100 secs Phase combination
order: #1 #5
-----------------------------------------------------------------------
Intersection
Performance Summary
Lane Group: Adj Sat
v/c
g/C
Approach:
Mvmts Cap Flow
Ratio
Ratio Delay LOS
Delay
LOS
----- -----------
EB L 347 1083
-----
0.228
----- ----- ---
0.320 16.2 C
-----
16.6
---
C
TR 559 1746
0.331
0.320 16.8 C
WB L 307 959
0.130
0.320 15.6 C
16.3
C
TR 556 1738
0.273
0.320 16.4 C
NB L 276 445
0.170
0.620 5.2 B
5.0
A
T 2310 3725
0.116
0.620 5.0 A
R 981 1583
0.014
0.620 4.7 A
SB L 639 1030
0.229
0.620 5.5 B
5.7
B
T 2310 3725
0.320
0.620 5.8 B
R 981 1583
0.100
0.620 5.0 A
Intersection
Delay =
8.4 sec/veh Intersection LOS
= B
Lost Time/Cycle, L = 6.0
-----------------------------------------------------------------------
sec Critical v/c(x) = 0.323
APPENDIX A
► If access consolidation along the east side of North College Avenue, north of
Willox Lane can be accomplished, a significant reduction in conflict potential
can be realized.
► With the identified improvements, long term traffic growth can be fully miti-
gated. This will result in acceptable operations in the area of the site for the
foreseeable future.
21
P.
In the long term, Northgate Commons will be fully built out. At that time, it is
expected to generate 852 morning peak hour trips, 1,119 noontime trips, 905
afternoon peak hour trips, and 11,093 trips per day. Half of these will be
drawn from passing traffic or diverted from other roadways.
No new improvements are needed to accommodate long term traffic; how-
ever, increased vehicle storage may be appropriate. At this time, the follow-
ing storage distances appear reasonable:
North College - Willox Provide eastbound right turn deceleration lane.
Extend southbound left turn storage to 265 feet.
Extend westbound left turn storage to 190 feet.
Extend westbound right turn storage to 125 feet.
North College - Site Access Extend southbound left turn storage to 160 feet.
Extend westbound right turn storage to 65 feet.
Extend westbound left turn storage to 100 feet.
Willox - Site Access Extend southbound right turn storage to 170 feet.
Extend southbound left turn storage to 50 feet.
Extend westbound left turn storage to 50 feet.
Extend eastbound left turn storage to 130 feet.
In reality, it may be easier and more economical to provide long term storage
lengths as part of the short term improvements. This will provide economies
of scale and reduce the likelihood of minor improvements in the future.
The proposed access scheme is consistent with the State Highway Access
Code in that it truly presents a reasonable balance between direct access
and the mobility needs of North College Avenue.
V. CONCLUSIONS
Based upon the reviews, analyses, investigations, and findings documented above,
the following can be concluded:
► Current overall operating conditions in the immediate area of the Northgate
Commons site are acceptable.
► A review of current traffic volumes revealed that a westbound right turn lane
is critically needed at the North College Avenue - Willox Lane intersection.
The number of current right turns is approaching 350 vehicles during the
afternoon peak hour.
► Northgate Commons will generate 647 morning peak hour trips, 946 noon-
time trips, 653 afternoon peak hour trips, and 9,173 trips per day in the short
term. Approximately 50 percent of these trips will be drawn from the passing
traffic stream or diverted to the site.
I. Short term improvements are as identified below:
INTERSECTION IMPROVEMENT
North College - Willox Westbound right turn deceleration lane.
Left turn signal phasing all approaches.
North College - Site Access Southbound left turn deceleration lane.
Northbound right turn deceleration lane.
Northbound right turn acceleration lane.
Willox - Site Access Eastbound left turn deceleration lane.
Westbound left turn deceleration lane
► With the identified improvements, traffic operations are expected to be
acceptable in the short term.
19
w.
0
co
N
Not to scale o
co
LO
O
M
w
O
V
LO
i
-100 (50 ft)/130 (65 ft)
or— 80 (75 ft)/105 (100 ft)
-K-Site Access
L 235 (100 ft)/290 (125 ft)
200 (175 ft)/220 (190 ft)
Willox
DESIGN PARAMETERS:
On College:
Deceleration distance - 315 feet to stop
- 295 feet to 15 mph
taper - 15:1 - 11.5:1 min.
Acceleration distance - 380 feet from stop
- 320 feet from 15 mph
taper - 15:1
On Willox:
Deceleration distance - 235 feet to stop
taper - 10:1 - 8:1 min.
,r -- 35 (25 ft)/65 (50 ft)
120 (115 ft)/140 (130 ft)--
1116 Short Term: Left turn phase
needed on all approaches 280E ft.
B
— 240+ ft.
a�
E
y >
0
yU
WD
U�
7
mFigure
12
Legend: Short Term/Long Term
y 3
SHORT AND LONG TERM
Note: Numbers denote Average Turning Volumes
and (Storage Required)
w 0
DESIGN PARAMETERS
Access Control Plan
The City of Fort Collins has a North College Access Control Plan. This plan, while
not yet adopted, indicates that direct access to North College Avenue is acceptable
for the site, as well as, the parcels to the south.
Access Consolidation
Wheeler Commercial Property Services is currently holding discussions to consoli-
date access along the east side of North College Avenue. A more defined, better
designed entry has been discussed with the property owners to the south. If
successfully negotiated, some 25-35 peak hour trips will be shifted to the North
College Avenue entry and the existing access points will be closed. The net result
will be one full movement access replacing three full movement access points.
Design Parameters
The Access Code was used to determine appropriate design parameters for the
specified auxiliary lanes. Short and long term storage requirements, accelera-
tion/deceleration distances and tapers are shown on Figure 12. It should be noted
that topography and drainage features to the north of the site may render the
installation of some improvements impractical. Rights -of -way may also be an issue
at some locations.
Along Willox Lane, it appears that the needed auxiliary lanes can be accomplished
by re -striping. Adequate roadway width can be obtained by eliminating on street
parking.
Based upon the storage lengths presented on Figure 12, stacking distances do not
appear to conflict with adjacent intersections. This applies to both short- and long
term conditions.
18
C. Private access which has the potential for signalization may be permitted
left turn movements if, (1) if meets the signalization spacing requirements
for intersecting public streets, roads and highways, as per subsection 3.7.5
and, (2) it does not interfere with the location planning and operation of the
general street system and access to nearby properties.
Item "a" restricts the property to one access. This is not reasonable considering the
amount of site generated traffic and the demand for site traffic to use North College
Avenue. By providing direct access to North College Avenue and additional access
to Willox Lane, site traffic can be more easily absorbed by North College Avenue.
Item "b" limits the North College Avenue access to right turns unless the access
does not have the potential for signalization, the left turn movements will not cause
unreasonable congestion, and other acceptable alternatives are available for the left
turns. As stated earlier, the North College Avenue access does not have the
potential for signalization and operating conditions are expected to be representative
of urban peak hour periods. Furthermore, restricting left turn movements would
cause a shift in traffic such that the average long term peak hour period would
generate a southbound left turn demand of 500 vehicles and a westbound left turn
demand of 325 vehicles at the North College Avenue - Willox intersection. These
traffic volumes clearly become excessive and would adversely impact the nearby
street system. Accordingly, there are no acceptable alternatives for the left turn
movement.
Item "c" is not applicable since there is no reason to anticipate future traffic signals
at this location. \
In summary, it appears that the proposed site access reaches the "reasonable
balance between direct access and mobility" needs of a Category 4 roadway.
17
By definition, most traffic movements are expected to operate acceptably under long
term conditions and likely will continue to do so for the foreseeable future. Typi-
cally, critical left turn movements from the side street operate at or in excess of
capacity under peak conditions.
Traffic signal installation was not given further consideration since warrants covering
more than peak hour periods are not expected to be satisfied. Additionally, left turns
from the site access to southbound North College Avenue have access to an
alternate signal location at the Willox Lane - North College Avenue intersection.
V. ACCESS CONSIDERATIONS
State Highway Access Code
North College Avenue is a Category Four roadway per the State Highway Access
Code (Access Code). This category strives for "a reasonable balance between
direct access and mobility needs within this category". The Access Code addresses
private direct access as indicated below:
a. No more than one access shall be provided to an individual parcel or to
contiguous parcels under the same ownership unless it can be shown that,
(1) additional access would not be detrimental to the safety and operation
of the highway and are necessary for the safety and efficient use of the
property, or (2) allowing only one access would be in conflict with local
safety regulations, and the additional access would not be detrimental to
public health, safety and welfare.
b. An access shall be limited to right turns only unless (1) the access does
not have the potential for signalization, (2) a left turn would not create
unreasonable congestion or safety problems and lower the level of service,
and (3) in the determination of the issuing authority alternatives to the left
turn would cause unacceptable traffic operation and safety problems on
the general street system.
iR
m = A, � ow �=
m i w
Figure 11
LONG TERM GEOMETRY
North College - Willox Provide eastbound right turn deceleration lane.
Extend southbound left turn storage to 265 feet.
Extend westbound left turn storage to 190 feet.
�j Extend westbound right turn storage to 125 feet.
North College - Site Access Extend southbound left turn storage to 160 feet.
Extend westbound right turn storage to 65 feet.
Extend westbound left turn storage to 100 feet.
Willox - Site Access Extend southbound right turn storage to 170 feet.
Extend southbound left turn storage to 50 feet.
Extend westbound left turn storage to 50 feet.
Extend eastbound left turn storage to 130 feet.
Traffic volume projections shown on Figure 9 and long term geometry shown on
Figure 11 were used to estimate long term operating conditions at key intersections.
Resultants levels -of -service are below with worksheets in Appendix C.
LONG TERM OPERATIONS
Intersection (Control)
Movement
Level -of -Service
AM
Noon
PM
College - Willox (Signal)
Overall
C
C
C
College - Access (Stop)
WB LT
F
F
F
WB RT
A
A
B
SIB LT
A
B
C
Willox - S/C/Site Access (Stop)
NB LT/TH
C
D
F
NBRT
A
A
A
SB LT/TH
C
C
D
SBRT
A
A
B
EBLT
A
A
A
WBLT
A
A
A
15
SHORT TERM OPERATIONS
Intersection(Control)
Movement
Level -of -Service
AM
Noon
PM
College - Willox (Signal)
Overall
B
B
C
College - Access (Stop)
WB LT
E
F
F
WBRT
A
A
A
SB LT
A
A
B
Willox - S/C/Site Access (Stop)
NB LT/TH
C
C
C
NBRT
A
A
A
SB LTITH
B
B
C
SBRT
A
A
A
EBLT
A
A
A
WB LT
A
A
A
As indicated above, all intersections are expected to operate at acceptable levels -of -
service in the short term. At the North College Avenue - Access intersection, the
critical left turn movement fell to level -of -service "F" under stop sign control. Traffic
signals are not warranted at this location and, therefore, should not be given further
consideration. This is considered typical in an urban environment. Capacity work
sheets are presented in Appendix B.
B. Long Term
The following roadway improvements are assumed implemented in the long term.
These improvements are anticipated as part of the evolving development activity in
the area of the Northgate Commons project. They are intended to supplement the
improvements provided in the short term.
14
°' N
Figure 10
SHORT TERM GEOMETRY
INTERSECTION IMPROVEMENT
North College - Willox Westbound right turn deceleration lane.
Left turn signal phasing all approaches.
North College - Site Access Southbound left turn deceleration lane.
Northbound right turn deceleration lane.
Northbound right turn acceleration lane.
Willox - Site Access Eastbound left turn deceleration lane.
Westbound left turn deceleration lane
Capacity analyses were conducted with the above improvements assumed in place
resulting in the short term geometry shown on Figure 10 and the traffic loadings
shown on Figure 8. Traffic signal cycle lengths consistent with those currently used
were maintained in the future. Analyses resulted in the peak hour and noontime
operating levels -of -service shown below. For evaluation purposes, desirable
operations are defined as level -of -service "D" or better under peak hour conditions
at signalized locations. At unsignalized locations, level -of -service "E/F" is consid-
ered normal and, therefore, acceptable for critical left -turn movements. Other
movements should operate at level -of -service "D" or better. These levels -of -service
are considered normal, if not better than normal, at unsignalized intersections during
peak -hour conditions in urban areas. At other times, significantly better operating
conditions can be expected.
13
:>r: (JI• s s
120
� o
o
(D toLQ M
LO
0 N
155/135/175
160/160/120
—�
105/90/100
-�
Legend: AM/NOON/PM
0
U
" -- 95/160/140
K- 90/110/115
Site Drive
100/2601500
f— 120/135/175
200/270/190
o
LO Z
fn
E
v Z
0
o
1
k 65/85/75
Z
N
--
190/160/375
1
20/80/95
T
140/170/110
V) T
0o ov
290/135/145 - ►
o m
N
60/100/125LO
LO
rn L M
N o
N
Z
Lo
o
Z
Note: Rounded to nearest 5 vehicles
Figure 9
LONG TERM
PEAK HOUR TOTAL TRAFFIC
120/120/145 1
130/120/110 -
90/75/85 -�
a�
rn
a�
O
U
90/120/80
80/90/70
1
t0 O
O O
N 0
CO
O CO
O
O
O
V
Site Drive
85/210/410
�- 85/95/140
185/2601155
Willox
E
O
O
� Z
to O N
Z
N
Z N
m
k-45/75/60
4-- 160/135/320
or- 10/25/70
100/150/105 -
) 1
R *
I
1
250/115/125 —►
N E
,n ,O 0
10/30/30 -�
i z o
m0
1
eM �N
0
p L
N O
Z
O
CO rnr-
o
N
Z
Nk
Legend: AM/NOON/PM Figure 8
SHORT TERM
Note: Rounded to nearest 5 vehicles PEAK HOUR TOTAL TRAFFIC
year 1998, the point at which Northgate Commons is expected to be 45 percent
developed. The long-term time frame is represented by the year 2015. By that
time, Northgate Commons is expected to be fully built. This design year is consis-
tent with area planning documents and long-term traffic volume projections prepared
by various agencies.
The City of Fort Collins provided long term traffic data. In the short term, straight
line growth of about 2% per year was used for North College Avenue. On Willox
Lane, short term growth in the 1 % range was used. Short term estimates were
increased to reflect planned development activity in the southeast and southwest
quadrants of the North College Avenue - Willox Lane intersection. More specifi-
cally, a Total gas/c-store, a medical building, and a McDonalds restaurant. These
facilities are anticipated in the short term. Long term traffic was adjusted to reflect
buildout of the Country Club Corner development to the south of the site. Site traffic
was added to the growth in background traffic. This resulted in more reasonable
future traffic volumes and more conservative traffic analyses. Total traffic is pre-
sented on Figures 8 and 9 for short and long term conditions, respectively. Total
traffic is a combination of site and background traffic.
F. Future Roadway System
The likelihood of major roadway improvements not related to development activity
was considered in both the long- and short-term. The improvements assumed
operational for each evaluation year are indicated below:
Short-term
Long-term
No improvements.
No improvements.
11
s r r■w E ;mot �e <�■r M 1 m m 1 1t
o —
N 0
o U U
0
o 6 �-- 95/160/140
+ co N 90/110/115
Site Drive
0
0
0
in
0
4)1(A
35/25/15
25/40/10
Legend: AM/NOON/PM
k- 5/30/45
— 10/35/25
140/185/115
1r
0 0
rn
\
co
co o
rn
Note: Rounded to nearest 5 vehicles
Lo
co
r
Q O
N N
N
N
140/170/110 -A
Z
k -- 65/85/75
Figure 7
LONG TERM
PEAK HOUR SITE TRAFFIC
LO
o Q
Lo
LO co
to
0 90/120/80
o v
1 80/90/70
LO
le
0
0
I
n
LO
too
N N
Lo
Lo M M
•I1A
15/25/10 1
20/20/20
Legend: AM/NOON/PM
k-- 5/20/35
4-- 5/20/25
or' 135/185/80
1
Note: Rounded to nearest 5 vehicles
Site Drive
0
LO
L
� N
N 0
v
m 0
1 N
100/150/105 ---4
A,
k— 45/75/60
T
Figure 6
SHORT TERM
PEAK HOUR SITE TRAFFIC
z
T
N
Figure 5
Site Traffic Distribution
As indicated above, when fully developed, Northgate Commons is expected to
generate 852 morning peak hour trips, 1,119 noon peak hour trips, 905 afternoon
peak hour trips, and 11,093 trips per day.
In an attempt to estimate the number of new trips created by the Northgate Com-
mons development, a further reduction was made to account for passerby and
diverted trips. This resulted in an estimated 426 morning peak hour new trips, 560
noon hour new trips, 453 afternoon peak hour new trips and 5,547 new trips per
day.
D. Trip Distribution
Trip distribution is a function of the origin and destination of site users, their working,
shopping and other travel patterns and the available roadway system. In this case,
all site traffic will access the site via single access points along North College
Avenue and Willox Lane. Based upon the anticipated tenants of Northgate Com-
mons, a two-step assignment process was undertaken. This process involved: 1)
traffic assignments related to the passing traffic stream such as a part of the fast
food, restaurant, and gas/ convenience store demand, and, 2) the general market
area associated with the remaining traffic demand created by other site uses.
Traffic drawn from the passing traffic stream is representative of the directional
biases discussed earlier in this report. In the long term, these biases are expected
to be less pronounced as growth occurs to the north of the site. General directional
distribution is approximated on Figure 5. Estimated site traffic is presented on
Figures 6 and 7 for short and long term conditions respectively.
E. Background Traffic Volumes
Both short and long-term traffic volume projections were developed along North
College Avenue and Willox Lane. The short-term was selected to represent the
10
11
SITE TRIPS
DAILY
AM
NOON
PM
PAD
USE/SIZE
Rate
Trips
In
Out
In
Out
In
Out
A
Fast Food 4K S.F.
710.08
2,840
114
109
123
118
76
70
B
Sec. Retail 11KS.F.
40.67
447
8
6
34
37
31
23
C
Sec. Retail 8K S.F.
40.67
325
6
4
25
27
22
17
D
Gas/C-Store 12 pumps
162.78
1,953
60
60
82
82 1
80
80
E
Fast Food 4K S.F.
710.08
2,840
114
109
123
118
76
70
F
Sec. Retail 6K S.F.
40.67
244
5
3
19
20
17
13
G
Sec. Retail 6K S.F.
40.67
244
5
3
19
20
17
13
H
Restaurant 8K S. F.
Office 8K S.F.
24.60
1 177.87
197
1,423
23
60
3
58
7
113
7
100
4
58
23
45
1
Retail 6K S.F.
Condo 6 DU
5.86
40.67
35
244
0
5
3
3
0
19
0
20
1
17
2
13
PHASE I SUB -TOTAL
10,792
400
361
564
549
399
369
Reduction for Captured Trips
1,619
60
54
85
82
60
55
PHASEI TOTAL
"9,173
'- 340:
307,
`.'�479
.: 467
339,
; 314`
J
Retail 6K S.F.
Condo 6 DU
5.86
40.67
35
244
0
5
3
3
0
19
0
20
1
17
2
13
K
Retail 6K S.F.
Condo 6 DU
5.86
40.67
35
244
0
5
3
1 3
0
19
0
1 20
1
17
2
13
L
Office 13.5K S.F.
23.46
317
37
4
12
12
8
36
M
Office 20K S.F.
21.33
427
50
6
17
17
10
48
N
Office 18K S.F.
22.00
396
46
6
15
15
9
45
O
Office 13.5K S.F.
23.46
.317
37
4
12
12
8
36
P
Office 8K S.F.
Condo 8 DU
5.86
24.60
47
197
1
23
3
3
0
7
0
7
3
4
1
23
SUB -TOTAL
13,051
604
399
665
652
477
588
Reduction for Captured Trips
1,958
91
60
100
98
72
88
;GRAND TOTAL
11,093
613
339
565
b54
405
500'
' Noon time activity was assumed to be generator peak hour for restaurant
uses, shopping center hourly distribution or generator peak hour for retail
uses. One half of the employees were assumed to go out for lunch for
1 office uses while condo activity is assumed negligible.
I i
4
In the case of the Northgate Commons, it is estimated that approximately 50 percent
of the site traffic will be drawn from the passing traffic stream or diverted to this site
from other roadways. This percentage was applied to total site traffic. Specific site
uses will draw significantly more traffic from the passing traffic stream while others
will draw less. On balance, this reduction presents a conservative analyses. It must
be noted that driveway activity is not affected by passing traffic reductions. Typi-
cally, a vehicle will turn into the site and exit the site in the same direction originally
travelled. The reduction is only used in determining the number of new trips gener-
ated by the site.
Traffic volume estimates are presented in the table on the following page. It illus-
trates the aggregate site traffic for each land use which is then totalled and reduced
to account for captured trips. Following the table, a brief statement is made con-
cerning the anticipated amount of new traffic contributed to the nearby street
system.
t-1
captured traffic must be considered. Captured traffic accounts for the fact that some
customers will shop or eat at the contiguous retail projects. Additionally, people
working on site may bank, eat, and conduct business within the development.
These types of internal trips need to be reflected in the estimated number of vehicu-
lar trips entering and exiting the site.
The types of trips discussed above become internal to the multi -use site and are
"captured" on -site. A capture rate therefore is defined as a percentage reduction in
trip forecasts to account for trips internal to the site. Chapter VI I of Trip Generation
addresses captured trips for multi -use developments. Rates range from zero to over
40 percent of peak hour depending on the blend of uses, overall size of develop-
ment, and other such criteria. For evaluation purposes, a 15% overall reduction in
trips was assumed captured at Northgate Commons. It should be noted that
captured trips directly reduce trips that are external to the site. This results in fewer
trips assigned to site access points, the adjacent streets, and nearby intersections.
Another consideration when evaluating service, retail, gas stations, convenience
stores, restaurants, and other similar establishments is the amount of activity drawn
from the passing traffic stream. For example a vehicle enroute from point A to point
B may very well stop along the way for gas, groceries, lunch, or other such items. If
this were the case, the gas, groceries, and lunch stops are recorded as six trip ends
when in fact one car was added to the street system.
Trip making can be broken down into the following three categories: 1) primary trips,
2) pass -by trips, and 3) diverted trips. Primary trips are made to and from the
generator with the specific intention of using the generator. Pass -by trips are made
as intermediate stops on the way from one point to another not associated with the
intermediate stop. Typically these include land uses such as banks, shopping
centers, restaurants, convenience stores, etc. Diverted trips are trips attracted from
other roadways to a roadway serving a particular development in order to gain
access to that development.
7
"� M r w s �r
j
pad \�
l36 iuee
P M
SF-
iVV� \
DLCYD 5r. .y USlb SF. G
A�m ° 8
�L,�,�J. •- I J�
• Pm r ` ,Pb K•.. Pb r pad \
`� i0LC0 af. U9N lP. '� 1i fF. I V6 SP. \
W 7 \Q Oppp - • \� pad 1\,
Uj
e ecE 0.43LLI
.�cr
•� J _. eP. ABm
J ems'
n
n. ar. Ob6
O ❑ `�.71
Z
' I •ceo 'JJJ .may u. ♦ pmm er. . •ams ar: .
Figure 4
-WILLOX LANEZOin cC .r%Q Counrty Clu� Corners wi v ate vVm oils
Fort Collins, Colorad
B. Development Overview
The current development schedule anticipates that Northgate Commons will be
some 45 per cent developed (on a square foot basis) by 1998. Short term develop-
ment will likely occur along the North College Avenue and Willox Lane frontages.
Typical users are expected to include two fast food restaurants, a gas/ convenience
store, a sit-down restaurant, specialty retail stores, and a minor amount of office and
residential development. A concept plan is presented on Figure 4.
The balance of the site will be developed by 2015. Less intense traffic generating
uses such as office and residential development will be predominant in the long
term with only 12,000 square feet of additional retail space proposed. These uses
will tend to balance short term traffic flows. A total of 178,000 square feet will be
built on some 27.5 acres of ground when fully developed.
Site access is planned via a full movement driveway to North College Avenue at
some 500 feet north of Willox Lane and a full movement drive to Willox Lane. The
Willox Lane driveway will align to the north of the east Country Club Corner drive-
way.
C. Site Traffic
Site generated traffic was estimated using the standard generation rates and
procedures consistent with those presented in "Trip Generation, Fifth Edition". This
publication is prepared by the Institute of Transportation Engineers (ITE) and is
nationally recognized.
The procedure to determine the impact of site traffic is a multi -step process. Initially,
traffic generated from each land use is estimated using ITE trip generation rates. In
the case of the Northgate Commons, a forecast of trips for each land use was made
and then added together. Given the character of mixed land uses, the effects of
III. FUTURE TRAFFIC CONDITIONS
A. Agency Discussions
During the course of conducting this study, information was gleaned from design
team and agency staff members. Agencies included the City of Fort Collins and the
Colorado Department of Transportation. Key elements of these conversations are
noted below.
1. The City wants short term (1998) and longterm (2015) analyses con-
ducted as part of this study.
2. Long term traffic volumes are estimated at 40,000 vehicles per day on
North College Avenue and 11,000 vehicles per day and 5,500 vehicles
per day east and west of North College Avenue, respectively.
3. The long term roadway section is four lanes on North College Avenue and
two lanes on Willox Lane excluding auxiliary lanes.
4. The City will not require signal progression diagrams as part of this study
in the event new traffic signals are deemed appropriate.
5. The North College Avenue intersection with State Highway 1 is being
relocated approximately 500 feet to the north and will be completed in
1997.
6. North College Avenue is a category four roadway per the State Highway
Access Code.
7. The City has a North College Avenue Access Control Plan which has yet
to be adopted indicating access to the Northgate Commons site.
02
food restaurant, a bank, and other minor retail uses. Access points to the shopping
center are located some 280 and 520 feet east of North College Avenue along
Willox Lane. To the east of the shopping center, an office complex currently exists.
Q. Existing Operating Conditions
Current operating conditions were determined using traffic volumes for the morning
peak hour, noontime, and the afternoon peak hour and existing roadway geometry.
As shown on the following table, all intersections and traffic movements operate at
level -of -service "C" or better indicating acceptable conditions.
EXISTING OPERATIONS
Intersection(Control)
Movement
Level -of -Service
AM
Noon
PM
College - Willox (Signal)
Overall
B
B
B
Willox - West S/C Drive (Stop)
WB LT
B
B
C
WB RT
A
A
A
SIB LT
A
A
B
Willox - East S/C Drive (Stop)
NB LT/TH
B
B
B
NB RT
A
A
A
WB LT
A
A
A
Overall
Capacity worksheets are in Appendix A.
4
Significant directional biases can be noted in traffic volumes on North College
Avenue adjacent to the site. During the morning peak hour, traffic flow is largely
higher inbound to Fort Collins with the opposite movement slightly higher during the
afternoon peak hour. Noontime traffic flows are approximately equal.
Willox Lane also has significant directional traffic flows. This is due to the shopping
center development (Albertsons) located in the southeast corner of the North
College Avenue - Willox Lane intersection and the office complex to the east. More
balanced flows occur during the noontime hour.
The North College Avenue - Willox Lane intersection is under traffic signal control.
To the north of the site, another traffic signal is located at the North College Avenue
- SH 1 intersection. This intersection is situated about 1,400 feet to the north of
Willox Lane.
C. Surrounding Land Uses
Along the west side of North College Avenue, a gas/c-store(convenience store)
occupies the northwest corner of the Willox Lane intersection. A motel, an auto
sales lot, and vacant ground exist further north. Excluding the gas/c-store, access is
unrestricted along North College Avenue. The Northgate Commons project will be
built on vacant ground. It will surround an apartment development and two existing
businesses located in the northeast corner of the North College Avenue - Willox
Lane intersection. These businesses are an auto sales lot and a restaurant. The
auto sales lot has access via Willox Lane while the apartments and restaurant have
full movement access to North College Avenue. The restaurant access is located
some 110 feet north of Willox Lane.
A shopping center development is situated along the south side of Willox Lane, east
of North College Avenue. This development has an Albertsons grocery store, a fast
3
i IM m= m m w= m m! m m= m i m es
O
LO
vo
M M
zt
cc00o M
k -- 65/162/344
°' CO
f-80/75/111
A%
38/48/49
75/64/104 1
103/78/79 c
73/61 /73 n CO
N
C tpN
LO M
:!t "
CM
v
N
m
rn
m
0
U
Legend: AM/NOON/PM
164/156/359
2/13/7
Willox
243/114/123—►
12/79/82
N
v
C04 N
CO
0
N
0
4-1521132/314
243/112/120-i
6/23/23 ---),
N
>
Shopping Center
Figure 3
CURRENT PEAK HOUR TRAFFIC
II. EXISTING CONDITIONS
A Existing Road Network
The site is bordered by U.S. 287 (North College Avenue) on the west and Willox
Lane on the south. U.S. 287 is under Colorado Department of Transportation
jurisdiction while Willox Lane is under City of Fort Collins' control.
North College Avenue is a major arterial roadway providing north -south circulation
extending through Fort Collins and beyond. In the immediate area of the site, North
College Avenue serves approximately 26,600 vehicles daily. The posted speed limit
is 40 miles per hour on this roadway which has two travel lanes in each direction.
Paved shoulders in the range of 4 - 5 feet wide currently exist adjacent to the site.
On the approach to Willox Lane, North College Avenue widens to provide a south -
bound left turn lane.
Willox Lane is an east -west minor arterial roadway. It is striped to provide one lane
in each direction, a bike lane in each direction, and on -street parking along both
sides. The posted speed limit is 30 miles per hour. Current daily traffic on Willox
Lane is 5,800 vehicles per day west of North College Avenue and 9,200 vehicles per
day east of North College Avenue. Current roadway geometry is presented on
Figure 2.
B. Existing_ Traffic Conditions
Peak hour traffic volumes on North College Avenue and Willox Lane were extracted
from recent traffic studies in the immediate area of the site, City of Fort Collins traffic
count data, and peak hour and noon time traffic counts conducted as part of this
study. This traffic data is shown on Figure 3.
2
No Text
I. INTRODUCTION
Northgate Commons is a proposed mixed use development situated along the east
side of U.S. 287 (North College Avenue) north of Willox Lane in Fort Collins,
Colorado. The location of the site is shown on Figure 1. The development will be
comprised of restaurant, retail, general office, and residential land uses on some
27.5 acres. A total of 178,000 square feet will be constructed. Northgate is ex-
pected to be 45 percent developed, on a square footage basis, in the next 2 years
with the balance of the site developed in the following ten years. Wheeler
Commercial Property Services is the developer of the property.
This study follows the established guidelines for traffic impact studies as are appli-
cable and appropriate to the proposed project. The following key steps were
undertaken as part of this study.
> Obtain current traffic and roadway data in the immediate
area of the site.
'
> Evaluate current traffic operations to establish the base
condition.
> Determine site generated traffic volumes and distribute
this traffic to the nearby street system.
> Project roadway traffic volumes for both short- and long-
term conditions.
> Evaluate traffic operations with the Northgate project
operational under both short- and long-term conditions.
> Identify areas of potential deficiencies.
> Recommend measures to mitigate the impact of site
'
generated traffic as appropriate.
TABLE OF CONTENTS
I. INTRODUCTION .................'............................ 1
II. EXISTING CONDITIONS ...................................... 2
A. Existing Road Network ................................... 2
B. Existing Traffic Conditions ................................ 2
C. Surrounding Land Uses .................................. 3
D. Existing Operating Conditions ............................. 4
III. FUTURE TRAFFIC CONDITIONS ............................... 5
A. Agency Discussions ..................................... 5
B. Development Overview .................................. 6
C. Site Traffic ............................................ 6
D. Trip Distribution ....................................... 10
E. Background Traffic Volumes ............................. 10
F. Future Roadway System ................................ 11
IV. TRAFFIC IMPACTS ......................................... 12
A. Short-term ........................................... 12
B. Long -Term ........................................... 14
V. ACCESS CONSIDERATIONS ................................. 16
State Highway Access Code ................................ 16
Access Control Plan ....................................... 18
Access Consolidation ...................................... 18
Design Parameters ....................................... 18
V. CONCLUSIONS ............................................ 19
Traffic Impact Study
Northgate Commons
Fort Collins, Colorado
Prepared For:
Wheeler Commercial Property Services
1125 W. Drake Road
Fort Collins, CO 80526
Prepared By:
Eugene G. Coppola P.E.
P. O. Box 260027
Littleton, CO 80163-0027
303-792-2450
r �7
December 19, 1996 7 V
J
>'dn..•'. PPS.;
yu,uu•�wa