HomeMy WebLinkAboutCHOICE CENTER FILING 3 (FORMERLY 1721 S. COLLEGE TOWNHOMES) - PDP - PDP160042 - CORRESPONDENCE -01/03/2017: A landscape plan shall contain accurate and identifiable
hydrozones, including a water budget chart that shows the total annual water
use, which shall not exceed fifteen (15) gallons per square foot over the site. If
you have questions contact Eric Olson at eolson@fcgov.com or 970-221-6704.
Comment Number: 2
Comment Originated: 01/03/2017
01/03/2017: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Department: Water -Wastewater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue a0fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/04/2017
01/04/2017: The water and sewer service configurations do not meet the City's
requirements. Each building will require it's own water and sewer service.
Comment Number: 2 Comment Originated: 01/04/2017
01/04/2017: Are fire services going to be required?
Comment Number: 3 Comment Originated: 01/04/2017
01/04/2017: The minimum utility easement widths are 20 feet for water and 30
feet for sanitary sewer.
Comment Number: 4 Comment Originated: 01/04/2017
01/04/2017: The minimum sanitary sewer size is a diameter of 8-inches.
Department: Zoning
Contact: Ryan Boehle, 970-416-2401, rboehleaaUcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/03/2017
01/03/2017: The provided parking does not meet the T.O.D. adjusted minimum
requirement of 22 spaces. The attached garage parking may be credited
toward the minimum requirement only if such spaces are made available to
dwelling unit occupants at no additional rental or purchase cost.
Comment Number: 2 Comment Originated: 01/03/2017
01/03/2017: A floor plan detail will need to be provided to show where the
interior bicycle parking will be allocated . A dedicated 6 square ft. area will need
to be provided to meet this requirement.
Comment Number: 3 Comment Originated: 01/03/2017
01/03/2017: Will the trash enclosure remain, or will it be reconstructed ? The
existing enclosure is constructed over the existing property line. If reconstructed,
the enclosure is shown as 8' high and will need a separate building permit.
Topic: Lighting Plan
Comment Number: 16 Comment Originated: 01/05/2017
01/05/2017: Please remove the address from the title & title block. With the
project being replatted, the address could change.
Topic: Plat
Comment Number: 1 Comment Originated: 01/04/2017
01/04/2017: This Plat has many issues. Please make changes as marked. If
changes are not made or you disagree with comments, please provide written
response of why corrections were not made. Please provide any responses on
redlined sheets and/or in response letter.
Topic: Site Plan
Comment Number: 2 Comment Originated: 01/04/2017
01/04/2017: Please change the title. The address needs to be removed from
the title & title block. With the project being replatted, the address could change.
Comment Number: 3 Comment Originated: 01/04/2017
01/04/2017: Please make changes to the sub -title as marked. See redlines.
Comment Number: 4 Comment Originated: 01/04/2017
01/04/2017: There are line over text issues. See redlines.
Comment Number: 5 Comment Originated: 01/04/2017
01 /04/2017: There are text over text issues. See redlines.
Comment Number: 6 Comment Originated: 01/04/2017
01/04/2017: There is text that needs to be rotated 1800. See redlines.
Comment Number: 7 Comment Originated:
01/04/2017
01/04/2017: Some of the easement descriptions shown are incorrect. If they
are going to stay on the plan, they should match what is shown on the
Subdivision Plat. Please remove the "proposed" and/or "PR" from the labels.
Comment Number: 8 Comment Originated:
01/04/2017
01/04/2017: Some of the right of way descriptions shown are incorrect. If they
are going to stay on the plan, they should match what is shown on the
Subdivision Plat. Please remove the "proposed" and/or "PR" from the labels.
Comment Number: 9 Comment Originated:
01/05/2017
01/05/2017: The legal description does not match the Subdivision Plat, and is
not necessary with the sub -title.
Comment Number: 10 Comment Originated:
01/05/2017
01/05/2017: There are sheet numbering issues in the sheet index. See
redlines.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson CCUcQov.com
Topic: General
Comment Number: 1 Comment Originated: 01/03/2017
Comment Number: 18 Comment Originated: 01/05/2017
01/05/2017: Please make changes to the sub -title as marked. See redlines.
Comment Number: 19
Comment Originated: 01/05/2017
01/05/2017: Please provide the following information for the Benchmark
Statement in the EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM, SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED FOR THEIR VERTICAL DATUMS,
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED
= NAVD88 - X.XX'.
Comment Number: 20
Comment Originated: 01/05/2017
01/05/2017: We suggest using another benchmark. C 322 Reset has been
moved during bridge reconstruction.
Comment Number: 21 Comment Originated: 01/05/2017
01/05/2017: All benchmark statements must match on all sheets.
Comment Number: 22 Comment Originated: 01/05/2017
01/05/2017: There are line over text issues. See redlines.
Comment Number: 23 Comment Originated: 01/05/2017
01/0512017: There is text that needs to be masked. Mask all text in hatched
areas. See redlines.
Comment Number: 24 Comment Originated: 01/05/2017
01/05/2017: There is text that needs to be rotated 1800. See redlines.
Topic: Landscape Plans
Comment Number: 11
Comment Originated: 01/05/2017
01/05/2017: Please change the title. The address needs to be removed from
the titles & title blocks. With the project being replatted, the address could
change.
Comment Number: 12
01/05/2017: There are line over text issues. See redlines.
Comment Originated: 01/05/2017
Comment Number: 13
01/05/2017: There are text over text issues. See redlines.
Comment Originated: 01/05/2017
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam(afcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 12/20/2016
12/20/2016: The site disturbs more than 10,000 sq. ft., therefore Erosion and
Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of
Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials
Submitted do not meet requirements. Please submit; an Erosion Control Plan,
an Erosion Control Report, and an Escrow / Security Calculation. If you need
clarification concerning the erosion control section, or if there are any questions
please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
Contact: Wes Lamarque, 970.416-2418, wlamarquecDfcgov.com
Topic: General
Comment Number: 2 Comment Originated: 01/04/2017
01/04/2017: Please document in the Drainage Report how the 100-year flows
exit the site.
Comment Number: 3 Comment Originated: 01/04/2017
01/04/2017: Please provide a Drainage Plan in the Utility Plan set.
Comment Number: 4 Comment Originated: 01/04/2017
01/04/2017: Please show the pavers in the Utility Plan set. The Drainage Plan
is a good sheet to show this.
Comment Number: 5 Comment Originated: 01/04/2017
01/04/2017: Please add a LID table to the Drainage Plan.
Comment Number: 6 Comment Originated: 01/04/2017
01/04/2017: Please add a basin summary table to the Drainage Plan.
Department: Technical Services
Contact: Jeff County, 970-221-6588, icountyCa)fcgov.com
Topic: Building Elevations
Comment Number: 14
Comment Originated: 01/05/2017
01/05/2017-. Please change the title. The address needs to be removed from
the titles & title blocks. With the project being replatted, the address could
change.
Comment Number: 15 Comment Originated: 01/05/2017
01/05/2017: There are line over text issues. See redlines.
Topic: Construction Drawings
Comment Number: 17 Comment Originated: 01/05/2017
01/05/2017: Please change the title. The address needs to be removed from
the titles & title blocks. With the project being replatted, the address could
change.
cohesive massings.
Comment Number: 5 Comment Originated: 01/04/2017
01/04/2017: Originally I had said that a 10' wide parkway is required along the
College frontage, however the 5' parkway is allowable with the Midtown plan.
Overall the parkway design along the Choice Center looks bleak. The parkway
to the north for some reason is not currently installed per the approved
landscape plans. This needs to be investigated further. Would suggest massings
of low perennial grasses between the trees.
Comment Number: 6 Comment Originated: 01/04/2017
01/04/2017: 7' width entrance walks to each door along S. College is
excessive, change to 5 feet.
Comment Number: 7 Comment Originated: 01/04/2017
01/04/2017. Too much pavement touching the building in the NE corner and NE
portion of the site. Snow/ice issues and not aesthetically pleasing. Also walkway
next to building would have visibility/crossing issues. Think about ways to
combine walkways, such as the east/west walkways to the north, perhaps locate
shrubs to create privacy and buffering from S. College of the grass panel as
opposed to along the drive connection, perhaps a low wall/seating area
somewhere to the north, also the pedestrian crossing appears to be important
with the current Choice Center approval.
Comment Number: 8
Comment Originated: 01/04/2017
01/04/2017: Bike area location is odd and tacked on. Only accessed by drive
aisle used by autos, and by jumping over the curb. Not a good solution.
Comment Number: 9 Comment Originated: 01/04/2017
01 /04/2017: Proposal includes elements of Choice Center that are off -site. I will
need to discuss this approach with staff to see options available to amend
these plans or whether this project would be a new filing of the Choice Center.
Comment Number: 10 Comment Originated: 01/04/2017
01/04/2017: Building designs: Need subtle changes to add variety, such as
variation in door design. Clarify window inset depth on the callouts. See building
varaition requirements in LUC 3.8.30.
Comment Number: 11
Comment Originated: 01/04/2017
01/04/2017: Too much of one material on the south elevations and interior
elevations. Would like to see better quality materials turning the corner of the
buildings as opposed to the fagade dominant treatment.
Comment Number: 12 Comment Originated: 01/04/2017
01/04/2017: Need to project the durable/quality materials further inward, and
also a better garage door design would be helpful.
Comment Number: 13 Comment Originated: 01/04/2017
01/04/2017: PDP submittal, landscape plan in particular does not include all of
the items in the detailed city PDP checklist. Also naming the buildings 'A' and
'B' would be helpful if the proposal continues with two separate buildings.
Comment Number: 14
Comment Originated: 01/04/2017
01/04/2017: Please make appointment and resubmit for further review. Will
send you a routing sheet with specific quantities.
apparatus access road shall be a minimum of 25 feet inside and 50 feet
outside.
Comment Number: 2
01/04/2017: FIRE LANE
Comment Originated: 01/04/2017
There are some inconsistencies between the Replat and Site Plan documenting
the width of the Emergency Access Easement. In order to avoid confusion, the
EAE should be widened to include the whole drivable width between the
buildings.
Comment Number: 3
Comment Originated: 01/04/2017
01/04/2017: FIRE LANE SIGNS
The limits of the fire lane shall be fully defined. Fire lane sign locations should be
indicated on future plan sets and the applicant should be aware that additional
on -site signage may be required at time of field inspection and final CO. Code
language provided below.
> IFC D103.6: Where required by the fire code official, fire apparatus access
roads shall be marked with permanent NO PARKING - FIRE LANE signs
complying with Figure D103.6. Signs shall have a minimum dimension of 12
inches wide by 18 inches high and have red letters on a white reflective
background. Signs shall be posted on one or both sides of the fire apparatus
road as required by Section D103.6.1 or D103.6.2.
Department: Planning Services
Contact: Jason Holland, 970-224-6126, iholland@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 01/04/2017
01/04/2017: The proposed layout has significant code issues regarding
landscape requirements. Full tree stocking is required around the buildings.
Foundation planting is required along the west face of the west building. See
LUC 3.2.1. The combination of elements used to transition between the Choice
Center Building 2 and new west building are too harsh and the area is not put
together in a way that meets the requirement in LUC 3.2.1(H). Currently this
west area includes wet utility lines so it does appear that space exists with the
current layout to meet all of the basic elements of the land use code.
Comment Number: 2 Comment Originated: 01/04/2017
01/04/2017: Parking design: HC spaces? Guest spaces? Parking dimensions
of garage spaces?
A 28' drive aisle width btw. garages is required per LUC 3.2.2(L).
Comment Number: 3 Comment Originated: 01/04/2017
01/04/2017: Landscape plan -- The three ribbons of plantings along College
Do not provide a good design. All of the ribbons are about the same width.
Would suggest getting rid of the grass strip and making the design have larger
massings of perennial grasses and tougher evergreen sections such as the
dwarf varieties of Spruce, such as Globe Spruce.
Comment Number: 4
Comment Originated: 01/04/2017
01/04/2017: Would suggest looking at recent locally approved plans for plant
selections that are more bullet-proof and that will grow together in more
tapped off of this and supplied to a dedicated transformer for the site.
Comment Number: 2 Comment Originated: 01/03/2017
01/03/2017: If power is taken from an area located on another private property,
utility easements will need to be obtained from that property owner
Comment Number: 3
Comment Originated: 01/03/2017
01/03/2017: Single phase service can be supplied from the existing three
phase transformer. Contact Light and Power Engineering to coordinate the
transformer and electric meter locations. Please show these locations on the
utility plans. Transformers need to have an 8' frontal and 3' side/rear clearance.
It also has to be 10' within a drivable surface and cannot be located under the
drip zone of any
trees. Please reference our Electric Service Standards to ensure requirements
and policies are met.
http://www.fcgov.com/utilities/business/builders-and-developers/development-fo
rms-guidelines-regulations
Comment Number: 4
Comment Originated: 01/03/2017
01/03/2017: A completed commercial service form (C-1) and one -line diagram
will need to be filled out by engineer/electrician and provided to Light & Power
in order to determine billing and proper transformer sizing. A link to our C-1
form is below.
http://www.fcgov.com/utilities/business/builders-and-developers/development-fo
rms-guidelines-regulations
Comment Number: 5 Comment Originated: 01/03/2017
01103/2017: Currently the existing transformer to the south has only six feed
positions available. If service to these townhomes needs more than this, a new
transformer must be added and location must be coordinated.
Comment Number: 6 Comment Originated: 01/03/2017
01/03/2017: If there are any additional questions, please contact Todd Vedder
with Light & Power at tvedder@fcgov.com or 970-224-6152
Comment Number: 7
Comment Originated: 01/03/2017
01/03/2017: Gas must maintain a 3 feet parallel and meter separation with
electric services.
Comment Number: 8
Comment Originated: 01/04/2017
01/04/2017: The two 5 unit buildings will be treated as a commercial
application. Therefore commercial rates will apply.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, ilynxwilerna.poudre-fire.org
Topic: General
Comment Number: 1
Comment Originated: 01/04/2017
01/04/2017: FIRE LANE TURN RADIUS
The plans do not support the ability of fire apparatus to negotiate the turn at the
south end of the central drive aisle. Turning radius is to be a minimum of 25ft.
This should also be reflected on the plat. Code language provided below.
> IFC 503.2.4 and Local Amendments: The required turning radii of a fire
2012 International Energy Conservation Code (IECC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
2012 International Plumbing Code (IPC) as amended by the State of Colorado
2014 National Electrical Code (NEC) as amended by the State of Colorado
Fort Collins has amendments to most of the codes listed above. See the
fcgov.com web page to view them.
Accessibility: State Law CRS 9-5 & ICC/ANSI Al17.1-2009.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Use
1. Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012 IECC.
2. Multi -family and Condominiums 3 stories max: 2012 IECC residential
chapter.
3. Commercial and Multi -family 4 stories and taller: 2012 IECC commercial
chapter.
1721 s college — project specific concerns:
1. Fire -sprinkler systems are required.
2. Bedroom egress windows required below 4th floor for 1 exit buildings.
3. All windows above the 1 st floor require minimum sill height of 24"
4. Building code and State statute CRS 9-5 requires project provide accessible
units.
5. Upgraded insulation is required for buildings using electric heat or cooling.
6. Exterior walls and roof must meet a STC (sound resistance) rating of 40 min.
if building located within 1000ft to train tracks.
7. Low -flow Watersense plumbing fixtures (toilet, faucets, shower heads) are
required.
8. Special combustion safety requirements for natural draft gas appliances.
9. Low VOC interior finishes.
City of Fort Collins
Building Services
Plan Review
416-2341
Department: Light And Power
Contact: Todd Vedder, 970-224.6152, tvedderaRfcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/03/2017
01/03/2017: Currently three phase power is the primary source of power in the
area. There is a 120/208V three phase transformer located to the NE corner of
the property to the south. This can be upgraded or primary can be
Contact: Molly Roche, mroche@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 01/05/2017
01/04/2017:
Please schedule a site visit with the City Forester to obtain Tree Inventory and
Mitigation information.
Comment Number: 2 Comment Originated: 01/05/2017
01/04/2017:
Please evaluate the feasibility of expanding the parkway to 5 feet wide in order
to accommodate the future health of the trees. Also, be sure to use irrigated turf
grass in the parkway.
Comment Number: 3 Comment Originated: 01/05/2017
01/04/2017:
The City Forester would like to see Catalpa and Kentucky Coffeetree used as
street trees.
Comment Number: 4
01/04/2017:
Comment Originated: 01/05/2017
In the Plant Schedule, please be sure to include tree sizes, quantities, and list
as B&B (balled and burlapped).
Comment Number: 5
Comment Originated: 01/05/2017
01/04/2017:
Please add the bolded Permit Box note, which is available through the City
Forester.
Department: Internal Services
Contact: Russell Hovland, 970-416.2341, rhovlandaofcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 12/21/2016
12/21 /2016:
Building Permit Pre -Submittal Meeting:
Pre -Submittal meetings are required to assist the designer/builder by assuring,
early on in the design,
that the new commercial or multi -family projects are on track to complying with
all of the adopted City
codes and Standards listed below. The proposed project should be in the early
to mid -design stage for
this meeting to be effective and is typically scheduled after the Current Planning
conceptual review
meeting. Applicants of new commercial or multi -family projects are advised to
call 416-2341 to schedule
a pre -submittal meeting. Applicants should be prepared to present site plans,
floor plans, and elevations
and be able to discuss code issues of occupancy, square footage and type of
construction being proposed.
Construction shall comply with the following adopted codes as amended:
2012 International Building Code (IBC)
2012 International Residential Code (IRC)
01 /03/2017: The north measurements of the lot are not consistent with the
suggested movement of the property line.
Comment Number: 4
Comment Originated: 01/03/2017
01/03/2017: The cross access easements need to identify who they are
dedicated to. They will need to sign accepting the easement.
Comment Number: 5 Comment Originated: 01/03/2017
01 /03/2017: Is this re -plat dedicating 13from the existing Lot 2 of the Choice
Center? If so, need approval from current owner.
Topic: Site Plan
Comment Number: 21
Comment Originated: 01/03/2017
01/03/2017-. The applicant will need to obtain access permits from CDOT for
closing and opening the access point on S College Ave.
Contact: Sheri Langenberger, 970-221-6573, slangenbergeraOfcgov.com
Topic: Fees
Comment Number: 1 Comment Originated: 12/09/2016
12/09/2016: The project owes an additional $279.75 for the TDR PDP fees.
The project is platting 1.474 acres and only identified .35 acres on the form.
Department: Environmental Planning
Contact: Rebecca Everette, 970-416-2625, reverette(a)fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 12/16/2016
12/16/2016: It appears there are a few trees that would be removed with this
project, but a tree mitigation plan was not submitted. Please arrange an on -site
meeting with the City Forester to determine mitigation requirements for any
significant trees on the site. For trees that will be protected, the City's standard
tree protection specifications and notes will need to be included with the
landscape plan.
Note LUC Section 3.2.1(C) requiring developments to submit a landscape and
tree protection plan, and if receiving water service from the City, an irrigation
plan, that: "...(4) protects significant trees, natural systems, and habitat, and (5)
enhances the pedestrian environment." Note that a significant tree is defined as
a tree having DBH (Diameter at Breast Height) of six inches or more. If any of
the trees within this site have a DBH of greater than six inches, a review of the
trees shall be conducted with Tim Buchanan, City Forester (970-221-6361 or
tuchanan@fcgov.com) to determine the status of the existing trees and any
mitigation requirements that could result from the proposed development.
Comment Number: 2
Comment Originated: 12/16/2016
12/16/2016: If tree removal is necessary, please include the following note on
the tree mitigation plan and/or landscape plan, as appropriate: "All tree removal
shown shall be completed outside of the songbird nesting season (Feb 1 - July
31) or a survey will be conducted of the trees to be removed to ensure that no
active nests are present."
Department: Forestry
field by the City Engineering Inspector. All repairs to be in accordance with City
street repair standards.
Comment Number: 11 Comment Originated: 01/03/2017
01/03/2017: Note that you can not drain more than 750sgft over a sidewalk.
Comment Number: 12
Comment Originated: 01/03/2017
01/03/2017: Per LCUASS detail 707.1 the driveway onto College Ave needs
to be between 24'-36' wide, currently 22' is shown.
Comment Number: 13
Comment Originated: 01/03/2017
01/03/2017: Cannot build structures that require building permits in utility
easements, there is a proposed retaining wall on the west and south side of the
property and on the east side
Comment Number: 14 Comment Originated: 01/03/2017
01/03/2017: Storm inlet D2 is in the trash enclosure, what does this detail look
like?
Comment Number: 15 Comment Originated: 01/03/2017
01/03/2017: Labels for easements are not consistent through documents, the
middle 24' easement is listed as just a drainage easement on the utility plan
sheet 5.
Comment Number: 16
Comment Originated: 01/03/2017
01/03/2017: Show all easements on the utility plans, missing the trash
enclosure easement and the access easements in the south corner.
Comment Number: 17 Comment Originated: 01/03/2017
01/03/2017: LCUASS 9.4.6, the driveway needs to be concrete up until the
property line.
Comment Number: 18 Comment Originated: 01/03/2017
01/03/2017: Please label the property lines and easement lines more clearly.
Comment Number: 20 Comment Originated: 01/03/2017
01/03/2017: Please provide a table of curves for your return radii, CDOT curb
return radii for this intersection be 30' from table 7.13.
Topic: General
Comment Number: 22 Comment Originated: 01/03/2017
01/03/2017: See redlines for additional comments.
Comment Number: 23 Comment Originated: 01/03/2017
01/03/2017: Have graphic scale but missing the wording 1"-XX' on all sheets.
Comment Number: 24 Comment Originated: 01/03/2017
01/03/2017: The legal name on all the documents need to match the legal
name on the plat.
Topic: Plat
Comment Number: 2 Comment Originated: 01/03/2017
01/03/2017: All of the "to be vacated" statements should be removed, all of the
easements need to be recorded prior to the recording of this plat. Show them
as completed on this document with the reception number.
Comment Number: 3 Comment Originated: 01/03/2017
Fort of
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov. corn/devetopmentreview
January 06, 2017
Mark Goehausen
CORE FT COLLINS LLC
2234 W NORTH AVE
Chicago, IL 60647
RE: 1721 S College Townhomes, PDP160042, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Jason Holland, at 970-224-6126 or jholland@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Morgan Uhlman, 970-416-4334, muhiman a(7}cgov.com
Topic: Construction Drawings
Comment Number: 6 Comment Originated:
01/03/2017
01/03/2017: Move the date under the legal description.
Comment Number: 7 Comment Originated:
01/03/2017
01/03/2017: Missing note 1. in Street Improvement notes:
1. All street construction is subject to the General Notes on the cover sheet of
these plans as well as the Street Improvements Notes listed here.
Comment Number: 8 Comment Originated:
01/03/2017
01/03/2017: Missing note 1. in Traffic Signing and Pavement marking notes:
1. All signage and marking is subject to the General Notes on the cover sheet of
these plans, as well as the Traffic Signing and Marking Construction Notes
listed here.
Comment Number: 9 Comment Originated:
01/03/2017
01/03/2017: Missing construction notes on section:
D - storm drainage notes
E - Waterline notes
Comment Number: 10 Comment Originated:
01/03/2017
01 /03/2017: Add street cut notes to demolition plans.
Limits of street cut are approximate. Final limits are to be determined in the