HomeMy WebLinkAboutHOME2 SUITES AT HARMONY VILLAGE - FDP - FDP160016 - CORRESPONDENCE - REVISIONSComment Number: 6 Comment Ori inated: 04/26/2016
04/26/2016: Please change the titles to match other plans. See redlines. 45cd`
Comment Number: 7 Comment Originated: 04/26/2016
04/26/2016: Please change the sheet numbers to match the index on sheet 1.
See redlines.
Topic: Site Plan
Comment Number: 1
Comment Originated: 04/26/2016
04/26/2016: Some of the sheet titles in the she t index do not match the sheet
titles on the noted sheets. See redlines. M(,�ossee/`
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/25/2016
04/25/2016: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com P-,eVo1-% Mo [e dL
Department: Water -Wastewater Engineering
Contact: Shane Boyle, 970-221-6339, sbovle@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/18/2016
04/18/2016: Please label Utility Easements on the Utility Plan. If the proposed
fire hydrant is not within an existing Utility Easement, one will need to be
dedicated. , b4l q: �grY.vre'ik %.. led
Comment Number: 2 Comment Originated: 04/18/2016
04/18/2016: Please see redli�n/ s�foor additional comments.
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/26/2016
04/26/2016: Where are the elevations of the accessory structures?
I�sc : Sce 4y"h en c"x-e 106C a - -
4
Russ 416-2341
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, ischlam@fcgov.com
Topic: Erosion Control
Comment Number: 4
Comment Originated: 04/19/2016
04/19/2016: Erosion Control Report was acceptable. Erosion Control Plan
needs to address some redlines and based offAiose changes the erosion
control escrow will need to be recalculated. �l)M : '01(C55CA
Contact: Shane Boyle, 970-221-6339, sbovle@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 04/18/2016
04/18/2016: Please label existing easements on the Grading Plan. If the
proposed bioretention facilities are not located within an existing Drainage ff
Easement, one will need to be dedicated with this project. ��(,� ASe. : iiA�OG eaCCpptmyy e ri 4s
Comment Number: 2 Comment O iaY�4/18/2016►
04/18/2016: Some of the calculations provided in the Drainage Report do not
follow Fort Collins approved methodology. Please see redlines and revise
accordingly. g�pp (-. (,Jia
Comment Number: 3 Comment Originated: 04/18/2016
04/18/2016: Please see Utility Plan and Drainage Report redlines for
additional comments. 1?kS ✓►g W�Yak
Department: Technical Services
Contact: Jeff County, 970-221-6588, icounty@fcgov.com
Topic: Building Elevations
Comment Number: 3
Comment Originated: 04/26/2016
04/26/2016:, Please clean up the fuzziness around the text and/or line work.
See redlines. AdkowC
Comment Number: 4 Comment Originated: 04/ 6/2016
04/26/2016: Please change the titles to match other plans. See redlines. yam`
Comment Number: 5
04/26/2016: Please add sheet numbers. See redlines.
Topic: Construction Drawings
Comment Number: 8
04/26/2016: No comments.
Topic: Landscape Plans
Comment Originated: 04/26/2016
Aim cb /`
Comment Number: 2
04/26/2016: There are line over text issues. See redlines.
Topic: Lighting Plan
Comment Originated: 04/26/2016
Comment Originated: 04/26/2016
A.ressek
10
d -e� F J L= w n l m: 0 o v E
No -� LEDT S Fe -.a wc'l- Pa r - r1
t lyd G order to confirm and to pass along clear direction to the contractor, please add
G
L h� ry 4T oa note on the architectural sheets th the "Beacon" will not be internally or
tip xtemall illuminate / )Vll( , � �r �s r
t c r Comment Number: 4 Comment Origina d: 04/27/2016
G5N 04/27/2016: Pleasq a d the corn�spe detail back on to the architectural
elevation sheets. ji(/ir SOO k P - K 74 r„ 'lrp rfto-" 4XA-Z-S
Comment Number: 5 Comment Originated: 04/27/2016
tom/ 04/27/2016: On the Site Plan Cover Sheet, under Note Number 6, please add:
S Lo "Under canopy lighting must be fully recessed and installed with a flush mount,
fl ens." This installation is the only way to shield the light source. o �-
, = )m,, Ad..dJ
Department: En sneering Development Review
Contact: Katie Sexton, 970-221-6501, ksexton@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/26/2016
04/26/2016: Water/stormwater comments indicate you may need to dedicate
additional easements. More inf ation regarding the easement dedication
process can be found here: � S` : �� !D Q. n.� Ea�rvitn�t (C�orrA
htt://www.fc ov.com/en ineerin / df/Easrowdedications 1 pd
Comment Number: 2 Comment Originated: 04/26/2016
04/26/2016: Larimef County doesn't need to approve plans, please remove the
signature block. 05pnsr, : Acagz�A
Department: Environmental Planning
Contact: Kelly Kimple, 970-416-2401, kkimale@fcqov.com
Topic: General
Comment Number: 1
Comment Originated: 04/26/2016
04/26/2016: Please add the following note to the landscape plans: "All tree
removal shown shall be completed outside of the songbird nesting season (Feb
1 - July 31) or a survey will be conducted of the tre s to be remod to ensure
that no active nests are present." i��ry�, - Masse I
Comment Number: 2 Comment Originated: 04/26/2016
04/26/2016: In regard to LED light fixtures, cooler color temperatures are
harsher at night and cause more disruption to circadian rhythms for both
humans and wildlife. Please consider choosing the warmer color temperature
(warm white, 3000K or less) for your LED light fixtures, when available. Please
also consider fixtures with dimming capabilities so that light levels can be
adjusted as needed. e-cenS(,: N06�,
Department: Internal Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 04/15/2016
04/15/2016:
This applicant needs to schedule aspre-submittal building code review meeting
asap. �C j sL: Ndl/
�`"� 2
r
G9911V --F-A Q J S— r -) - 1 6
Fort of
c?�
Dfi►
April 27, 2016
Ken Merritt
JR ENGINEERING ON BEHALF OF EAST AVENUE DEVELOPMENT LLC
2900 SOUTH COLLEGE AVENUE
Fort Collins, CO 80525
RE: Home2 Suites at Harmony Village, FDP160016, Round Number 1
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins CO 80522
970.221.6750
970.224 6134 tax
fcgov. com,developmentre wew
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Ted Shepard, at 970-221-6343 or tshepard@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Ted Shepard. 970-221-6343, tshepard@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/27/2016
04/27/2016: It appears that architectural elevations are not the latest set of
revised plans. Please note that the amount of Loveland Buff (not "Bluff")
I Sandstone has been reduced along east (front) and south (side) elevations.
V Please restore the amount of stone per the approved P.D.P. In addition, the
6!(�' five columns along the north elevation that were previously called out to be stone
have been replaced by what appears to be steel (TS-1). All of these columns
1111J/// must be restored to stone. Also, the window treatments (stone sills in lintels)
that we agreed t t P.D.P. is not shown. Please restore all ar hitectural detp iIs
per the P.D.P. V� : A&bu% . 6e-e- u pd- n k<i — WL�
Comment Number: 2 Comment Originated: 04/27/2016
04/27/2016: 1 will need a sample of the "Laminated White Frosted Glazing
Beacon in order to evaluate its opacity. Also, please describe in a detail what
exactly is the "White SS Frame," AM((.%d O%L eIlSUin�`cC S7-/'s7-
Comment Number: 3 Comment Originated: 04/27/2016
04/27/2016: Neither the Lighting Plan or the cut sheets indicate any fixture for
e �p the purpose of internally illuminating the aforementioned beacon. Thank you for
responding to our earlier comments and concerns in a positive manner. In