Loading...
HomeMy WebLinkAboutHOME2 SUITES AT HARMONY VILLAGE - FDP - FDP160016 - CORRESPONDENCE -Please add this screen wall to all three elevations and label accordingly. In addition, please indicate the material and color (E.I.F.S.? metal?). Based on the shadowing indicated on the Left Elevation — East, the screen wall appears open to the east. If open, how is the rooftop equipment screened? Please be sure that the screen wall is sufficient (height, length, width) to completely screen the equipment. If, upon inspection, the screen wall proves to be insufficient, staff will request a retrofit. One option would be to show this as a separate scaled detail New Comment: Please add the following note to the Site Plan. - "The developer is responsible for replacing any existing trees on Lot 11A, Harmony Village P.U.D. Replat No. 1 that are either failing to thrive or dead that are not specifically indicated to be replaced by new landscaping per Home 2 Suites Landscape Plan." New Comment: On the Lighting Plan E-0.2, the porte cochere is not indicated. As a result, there are no under -canopy light fixtures. Generally, a porte cochere includes under canopy lighting. Is this the case? Please confirm. If there is to be under -canopy lighting, please adjust the Lighting Plan accordingly to indicate the type of fixtures. Since the area is under a structure, the foot-candle illuminance plan does not need to be adjusted. New Comment: On the Lighting Fixture Schedule, please add a column for Quantity. Please let me know if you have any questions. Sincerely: Ted Shepard Chief Planner Xc: Ken Merritt, JR Engineering Tim Halopoff, JR Engineering City of Fort Collins May 18, 2016 Mr. Jorge Urrea Phillips Architects and Engineers 5901 Peachtree Dunwoody Road Building A, Suite 450 Atlanta, GA 30328 RE: Home 2 Suites Final Plan, Pre-Mylar Review Dear Jorge: Planning, Development and Transportation Services Current Planning 281 N. College Ave. PO Box 580 Fort Collins, CO 80522-0580 970.221.6750 970.224.6134 - fax fcgov.com/Currentp/anning Here are my remaining comments for Home 2 Suites, Pre-Mylar Review: April 27th Planning Comment number one — resolved. April 27th Planning Comment number two — resolved. April 27th Planning Comment number three — resolved but only to the extent that the E.I.F.S. provides an opaque material versus a translucent material on the "beacon." The architectural elevations continue to indicate that there is to be external illumination placed within the lighting cove. The comment made on April 27th requires that this rooftop component "... not be internally or externally illuminated. As a result, the light cove must be removed. The lighting materials now include a lighting detail called the "Flexible Magic Line LED Light Strip — 227FLMagic." Is this the proposed light source intended to be placed within the lighting cove for the purpose of illuminating the "beacon" component? If so, since we are not allowing external illumination of the "beacon," this detail can be removed from the plan set. New Comment: On the architectural elevation "Left Elevation — East", there is what appears to be a rooftop mechanical screen wall but this screen wall is not labeled. But, this screen wall does not appear, or labeled, on any of the other three elevations.