August 9, 2007
Poudre Valley Health Systems (PVHS) is willing to enter Into an agreement to
provide for the reimbursement by PVHS of one-half (1/2) of the actual costs for
snow removal from the sidewalks and/or parking areas of the Affected Property
as mitigation for those portions of such sidewalks and parking surfaces which
may be negatively impaled by the shadow cast by the parking structure. PVHS
will also grant access for parking in the parking structure for any "lost" parking
spaces due to snow accumulation within the impacted shadow area.
Such agreements shall each Include the following elements: the property
owners shall contract for, pay and assume all liabilities for snow
removal on the Affected Properties; the property owner shall bill PVHS
on a monthly basis one-half (1/2) of the costs of such snow removal and
PVHS shall reimburse within thirty (30) days of receipt of Invoice; the
property owner shall competitively bid the snow removal work (i.e.
getting at least three quotes); and the agreement would remain in effect
until the Affected Properties were to redevelop In any manner which
would require City development review approval.
Daniel Gri n, Dat
Member/ Me e
Harvest My I estments
Kevin
Poudre
F c-2 i-e 7
Date
TOTAL P.02
86/11/2002 11:46 9704824407 BUTLERS PAGE 01
a agv a of a
Sut* POP 1f 14-07
Date: 10/30/2007
To:
October 30, 2007
To: City Clerk and Ft. Collins City Council
From: Paul Butler, owner of 1005-1017 S. Lemay, the property immediately north and adjacent to proposed
PVH parking garage and a Party in Interest
On September 20, 20071 entered testimony at the P and Z meeting and would Ike to clarify some statements
made that night by PVH. I dispute the statement that i was offered a contract to share snow removel costs
from our parking lot and roof as was stated at the meeting. Although I did receive a contract for the parking lot,
there was no reference to the roof whatsoever. Since our roof is flat this is a major point, In my estimation, so I
did not sign IL Also there has been no offer from PVH to share any Iabift resulting from Injuries due to ice not
metling and people slipping and failing because of the problem caused by the parking garage shadow.
I have also been shown two different shadow studies, one shadow covering 75% of my property and one
covering 21396. When Steve Ellsworth from PVH was asked why there were two radically dfferent studies and
how do I know which one is correct, he said he didn't know but would find out That was about two weeks ago
and 198H have not heard from him.
Thank you for considering these points.
Paul Sutler
10201 CR 74
Windsor, Co. 80550