Response: The MOB is designed to project a contemporary modern healthcare image
while recognizing the existing hospital and remaining sensitive to the adjacent
residential neighborhood. The modular brick is used to tie with the existing hospital
while the stone and metal panel systems are materials that directly transition from the
institutional hospital to a smaller scale residential language. The fourth floor cement
board panel system was selected as a modular system (as opposed to a monolithic
skin such as stucco) to maintain the same contemporary modular feel as the brick,
stone, and metal panel systems. At the same time the light tan color and smooth
texture of the cement board provide a clean, modern yet nondescript finish allowing the
material to form more of a background, secondary wall mass, an important
consideration for the fourth floor. The smooth, modular nature of the cement board,
along with the selected color, help the language of the building project the modern
healthcare image of a clean, technologically advanced, yet warm and inviting facility.
The color switch from the earlier cold light grey to the current warm Sienna tan was
crucial to the acceptable use of this material. The modularity of the panel installation,
each panel with its own color gradations, will provide more of a depth to the system
than can be seen in a single panel sample.
6. Please add a note to the Site Plan of the Parking Structure that states that, due to
the fact that the design of the parking spaces are Long Term, parking within the
Parking Structure shall be limited to staff, physicians, and all other employees of
the Poudre Valley Hospital, the Medical Office Building and other surrounding
medical office buildings that are duly authorized by P.V.H.S. And, that the Parking
Structure is not available to the general public.
Response: Note has been added to the Parking Structure site plan
7. Please add a note to the Site Plan for the Parking Structure that the Parking
Structure access onto Robertson Street shall be restricted for emergency access
only and not open on a regular daily basis.
Response: Note has been added to the Parking Structure site plan
8. Please consider shifting the location of the trash enclosure away from the south
property line out of consideration for neighborhood compatibility.
Response: We have studied several locations on the site for the trash enclosure. This
location is preferred since it is least visible from the public rights -of -way and public
entrance areas, yet still accessible for building tenants and trash haulers. Also, this
location is similar to the existing condition. The existing site contains a similar trash
enclosure located adjacent to the back fence of the adjacent residences, so we are not
creating a change to the current situation.
9. Be sure to specify on the architectural elevations for the Parking Garage that the
supporting columns are topped by a cornice and capstone.
Response: Noted and indicated on plans
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Sincerely:
Page 6
Northern: The clean -out has been labeled as "traffic rated".
Number: 95 Created: 12/19/2007
[12/19/07] Fire hydrant and fire line on the north side of Garfield extending toward parking
structure appear to impact a large existing tree. Adjust FH and FL accordingly.
Stantec: The proposed fire hydrant and fire line on Garfield have been moved
approximately 25' to the west to avoid an existing tree that is to remain in place.
Number: 96 Created: 12/19/2007
[12/19/07] Is an irrigation tap planned for the MOB site?
Northern: A separate irrigation tap is not being provided. Irrigation service will be
provided downstream of the proposed domestic water meter.
Number: 97 Created: 12/19/2007
[12/19/07] Show existing sewer service to 1050 Robertson and add appropriate notes to
abandon at the main.
Stantec: The existing sewer service has been shown on the utility plan and called out to be
abandoned to the main. A street cut has also been shown on the utility plan and demo plan.
Comments from Current Planning:
1. The landscaping along the south side of the M.O.B., as discussed at the site visit,
will need to be revised after underground utilities are located. Then, with
permission from the affected utilities (Light and Power, Comcast, Qwest), relocation
north into the parking lot drive will allow for more plant material along the south
property line.
Response: With the information received from the on -site utility locates, we believe
the trees shown on the plans can be carefully planted in this area without disturbing the
existing utilities. Based on our site visit meeting with the utility companies, engineering
and planning, this was preferred. The contractor will be made aware of the utilities, and
will be responsible to note any additional conflicts that are found once construction
begins and these lines are more thoroughly located. If necessary, affected utilities will
be relocated north into the proposed parking lot area to avoid the conflict.
2. On the lighting plan, please indicate the south property line of the M.O.B.
Response: Property line has been added to the drawing in addition to the 20'-0"
setback line that is currently shown.
3. Please note on the lighting plan that illumination levels are too high and there is too
much light spillage along the south property line of the M.O.B. Please consider
reducing the number of poles, reducing the wattage, and/or reducing the height of
the AA4 fixtures. At the very least, these fixtures should be equipped with external
house -side shields that drop down a sufficient distance to block the view of the light
source from the backyards of the adjacent houses. The applicant needs to be
aware that, due to issues related to neighborhood compatibility, there will be a
reduced lighting level in this portion of the parking lot.
Response: The photometrics of the luminaires have been revised to meet the criteria
of 0.1 fc at the 20' setback. Also, the external house -side shield have been indicated
with a note on the luminaire schedule located on the drawings.
4. For both buildings, please indicate the quantity of each specified light fixture.
Response: The Luminaire Schedule has been revised to indicate the quantity of each
light fixture.
5. For the architectural materials on the M.O.B., please note that the mock up wall on
display at the hospital indicates that the panel board is smooth, flat finish. Staff is
concerned that this represents a degradation of quality for building that needs to be
Paste 5
Stantec: The rock has been specified as a washed gravel with a diameter of 1.5 to 3
inches. Documentation has been provided to Wes Lamarque that this supports the
assumption of 40% voids.
Number: 91 Created: 12/19/2007
[12/19/07] A drainage easement is required for the water quality swale around the perimeter
of the parking structure. The northwest section of this swale is not in an easement. It looks
like the lot line goes all the way to the proposed right-of-way with no space for an easement.
The lot line may need to be adjusted.
Stantec: The drainage swale has been reviewed with Wes Lemarque and has been found
to always be an easement, whether it be a drainage or utility easement.
Number: 92 Created: 12/19/2007
[12/19/071 Please add a not on the utility and grading plan sheets stating a maintenance
and inspection schedule for the owners of the stormceptor.
Northern: A table indicating the maintenance schedule recommended by the
manufacturer has been added to the drawings.
Number: 93 Created: 12/19/2007
[12/19/07] For the City's records, please submit a maintenance manual (preferably by the
manufacturer) for the stormceptor with the mylar submittal.
Northern: A copy of the owner's manual from the manufacturer has been included
with this submittal and includes maintenance recommendations.
Number: 94 Created: 12/19/2007
[12/19/07] Please provide an erosion control esrow calculation for both lots. This number
will be included in the Development Agreement.
Stantec: An erosion control escrow calculation has been provided and will be added to the
drainage letter upon final submittal. A copy is provided with these comment responses.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: WaterMastewater
Number: 54 Created: 6/15/2007
[12/19/07] City records do NOT show line stubbed to north. If field surveys showed other
information, please provide documentation. If not, remove note pertaining to the 8-inch stub
extending north from the manhole.
[7/12/07] Revise plan to show connection being made at MH. Include note to core drill
opening in MH.
[6/15/07] To the south of the M.O.B., it is indicated that there is an 8-inch stub going north
out of the existing MH. Is this based on field observation? (City records don't show this
stub.)
Northern: Field investigations do show that a stub is present from this manhole
heading north.
Number: 63 Created: 7/12/2007
[12/19/071 Cut -in a tee or wye fitting using adaptor couplings.
[7/12/07] The 8-inch sewer in Robertson is VCP. The 6-inch service connection must be
made by cutting a wye or tee into the sewer main. Add appropriate notes.
Stantec: The proposed sanitary sewer connection to the existing main has been called out
as cutting in a wye fitting and joining the proposed sewer to the existing main using coupling
adapters.
Number: 88 Created: 12/19/2007
[12/19/07] Label the sewer service clean -out south of the MOB as "traffic rated".
Page 4
Department: Light & Power Issue Contact: Alan Rutz
Topic: Light & Power
Number: 84 Created: 12/19/2007
[12/19/071 There are two electric lines along the south lot line of the MOB. One serves the
residential area and it will remain in place. The other line is for the existing office building
and it will be removed.
Response: Noted.
Number: 85 Created: 12/19/2007
[12/19/07] Trees should be placed no closer than 10' from an existing electric structure.
Bushes can be placed 3' from the sides of a structure. An 8' operating clearance is required
in front of an electric structure. Note that some structures have two fronts.
Response: Tree and shrub locations have been revised
Number: 86 Created: 12/19/2007
[12/19/07] Development charges will apply to this development. Contact Light and Power
with electric load requirements and to coordinate transformer location.
Response: Transformer has been located on the plans based on the location discussed
with light and power. Electric development charges will be determined with building permit.
Topic: Stormwater
Number: 87 Created: 12/19/2007
[12/19/07] .
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 42 Created: 6/13/2007
[12/19/07]
[6/13/07] PFA has no comments or concerns at this time.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: Landscape
Number: 89 Created: 12/19/2007
[12/19/07] Adjust trees and shrubs to provide required separation distances from
water/sewer lines.
Response: Tree and shrub locations have been revised
Stantec: The proposed fire hydrant and fire line on Garfield have been moved
approximately 25' to the west to avoid an existing tree that is to remain in place.
Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 83 Created: 12/18/2007
[12/18/071 The proposed shade tree next to the Stormceptor needs to be relocated. These
are large underground structures and the tree should be 10 feet from the edge of the
structure, not the center.
Response: Shade tree has been relocated
Number: 90 Created: 12/19/2007
[12/19/07] The assumption of 40% voids in the detention and water quality swale may be
high with the materials being proposed. Please call Wes Lamarque at 416-2418 to discuss.
Pa«e 3
Number: 77 Created: 12/18/2007
[12/18/071 Stantec — Please show the R.O.W. consistently, same line type on all three sides
of the parking structure site.
Stantec: The ROW lines have been revised and are now shown consistently.
Number: 78 Created: 12/18/2007
[12/18/07] Stantec — Please show how the Robertson access to the parking structure will be
closed off for use (i.e. bollards, walls, doors etc...). Since this access will not be used, it
does not seem appropriate to place a striped cross walk at this driveway.
Stantec: A note has been added to the horizontal control plan regarding the gated
emergency access and refers to the Architectural plans for final configuration. The
architectural plans indicate the access with a roll -down gate.
Number: 79 Created: 12/18/2007
[12/18/07] Stantec — The proposed standard detached 4.5 foot sidewalk on Robertson
cannot be constructed without removing all of the existing curb, gutter and attached
monolithic walk. Please clearly indicate on the Utility Plan sheet the section of concrete to
be removed and replaced with standard vertical curb and gutter. Since there is parking on
the street, you will be able to make a two foot cut in the pavement to remove and
reconstruct the new vertical curb and gutter and patch with new asphalt. Please clearly
show the two foot street cut limits on the plan as well.
Stantec: The demo plan has been revised to show the removal of the monolithic walk, curb
and gutter in addition to the sawcut. A detail has been added to the grading plan that
shows a typical section of C/G replacement and a 2' asphalt patch along the curb and gutter
in Robertson Street.
Number: 80 Created: 12/18/2007
[12/18/07] Stantec — Please revise the Lemay Plan and Profile sheet per the redline
comments. The plan view needs to show stationing along the flowline to be consistent with
the stationing provided in the profile. Remove the landscape and topo layers to clean up the
plan view and label the ROW and any easements. The cross sections provided should
graphically reflect the location of sidewalks and C&G.
Stantec: All redline comments on the Lemay Plan and Profile sheet have been addressed.
Number: 81 Created: 12/18/2007
[12/18/071 Please revise the Site and Landscape Plans to be consistent with any changes
made on the Utility Plans. Please refer to the redlines for any additional minor comments
related to drafting and labeling.
Response: Site and Landscape Plans have been revised to reflect changes on utility plans
Stantec: BHA has received updated base files and coordinated changes.
Number: 82 Created: 12/18/2007
[12/18/07] Bridge plans are still under review by the structural engineer. Comments will be
forthcoming.
Department: Light & Power Issue Contact: Doug Martine
Topic: Electric
Number: 69 Created: 12/17/2007
[12/17/07] The developer needs to coordinate power requirements, a location for a pad type
transformer, and the electric development charges with Light & Power Engineering (221-
6700).
Response: Transformer has been located on the plans based on the location discussed
with light and power. Electric development charges will be determined with building permit.
Page 2
STAFF PROJECT REVIEW
Citpof Fort Collins
ANGELA MILEWSKI Date: 12/20/2007
BHA DESIGN, INC.
1603 OAKRIDGE DRIVE
FORT COLLINS, CO 80525
Staff has reviewed your submittal for PVH MEDICAL OFFICE BUILDING AND PARKING
STRUCTURE PDP - TYPE II AND FINAL PLANS, and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Randy Maizland
Topic: Engineering
Number: 70 Created: 12/18/2007
[12/18/07] Plat — The Bus Shelter and pad are being shown extending out of the ROW.
Please dedicate additional ROW or a transit easement on Lemay to encompass all of the
shelter and concrete pad. If you decide to dedicate as a transit easement, you'll need to
insert the transit easement note provided on the Plat.
Stantec: A transit easement has been added to enclose the Bus Shelter and pad. The
transit easement note has been added to the cover page.
Number: 71 Created: 12/18/2007
[12/18/07] Northern — The modified H.C. ramp at Lemay and Garfield will need some
changes. Please see the redline comments on Sheet DT2.
Northern: The requested modifications have been made.
Number: 72 Created: 12/18/2007
[12/18/07] Northern — You are showing a section of C&G on Garfield to be removed and
replaced. You will need to label on the plan to MATCH EXISTING and also provide a detail.
I have provided the old detail that was used when this was the standard. You will need to
make some changes to it as noted and provide a revised detail.
Northern: The provided detail has been added to the drawings and the new curb
and gutter has been noted to match existing.
Number: 73 Created: 12/18/2007
[12/18/07] Northern — Please label the easement on Lemay for the sidewalk as an access
easement rather than pedestrian easement to be consistent with the Plat.
Northern: The note has been updated.
Number: 74 Created: 12/18/2007
[12/18/07] Northern — Please add a note to the Utility Plan sheet and the Storm Sewer Plan
sheet indicating that the storm drain system is private and to be maintained by the hospital.
Northern: The note has been added.
Number: 75 Created: 12/18/2007
[12/18/07] Stantec — Please add the final Plat to the Utility Plan set as indicated on the
Drawing Index.
Stantec: The final Plat has been added to the Utility Plan set.
Number: 76 Created: 12/18/2007
[12/18/07] Stantec -The H.C. ramps at the comer of Garfield and Lemay are non-standard
ramps and a detail will be needed. Please see the redline comments provided on sheet
DT2 of the Northern Engineering plans. Either use the same detail or provide your own for
this modified ramp configuration.
Stectec: The custom handicap ramp detail has been added to detail sheet C-501.