HomeMy WebLinkAboutWOVENHEARTS MEMORY CARE - PDP/FDP - 5-97A - CORRESPONDENCE - (6)7. The Light and Power Utility stated that there is existing underground
electric along Lemay Avenue and Rule Drive. Service is available from
the existing vault at the southwest property corner. Electric service must
be adequately routed around the proposed detention pond. Please
coordinate a transformer location with the Light and Power Utility
Engineering Department. The transformer must be located within 10' of a
paved surface. Please have your electrician submit a C-1, Commercial
Use form to Light and Power. Normal electrical development charges will
apply. Please refer to the fee information that was provided. CAUTION
there is a 13,000 volt line in the area. Please contact Alan Rutz at 221-
6700 with any questions regarding these comments.
8. The Poudre Fire Authority stated that an automated fire suppression
system and alarm system will be required. A hazardous materials impact
analysis will be required for medical gases, etc. A "knox-box" which stores
a key to the building for the fire department will be required. A 20 foot
inside radius and 40 foot outside radius must be provided for the
maneuvering of fire trucks around the access drive. The parking lot
paving must be designed to carry the weight of a fire truck. Unobstructed
(paved) access must be provided to the emergency exits. Please contact
Ron Gonzalez at 221-6570 with any questions regarding these comments.
9. The Current Planning Department offered the following comments:
a. The MMN, Medium Density Mixed Use Neighborhood is described
in Division 4.5 of the Land Use Code (Article 4, pp. 30-42).
b. General Development Standards (such as fencing and
landscaping) are described in Article 3 of the Land Use Code. In
the event of a conflict between a standard or requirement
contained in Article 3 and Article 4, the standard in Article 4 shall
prevail.
C. Per Section 2.2.2 of the Land Use Code (Article 2, pp. 13-14), a
neighborhood meeting is required prior to the submittal of a Type 2
development application. The meeting has been scheduled for
February 24, 1998 from 7 to 9 PM at the Evangelical Covenant
Church.
d. A geographic notification map has been provided to the applicant.
The developer is responsible for obtaining the names and
addresses of property owners within the mailing area. The
developer pays the City 50 cents per name for the mailing.
Please contact Mike Ludwig at 221-6206 with any questions regarding
these comments.
reduction. The Drainage Master Plan specifies a release rate of 0.5
cfs/acre. The Sterling House detention pond was built on-line. This
project proposes enlarging that pond. However, it is recommended that
this pond be pulled off-line since all of the Harmony Market Shopping
Center currently drains through the Sterling House detention pond and is
negatively affecting its operation. The drainage ditch along Lemay
Avenue drains the Evangelical Covenant Church and other developments
to the north and needs to be maintained by this development. The design
of the site should take into account water quality considerations and Best
Management Practices. The City recommends utilizing extended
detention. Standard drainage and erosion control reports prepared by a
Colorado licensed professional engineer will be required. Please contact
Basil Harridan at 221-6589 with any questions regarding these comments.
4. The Water and Wastewater Utility stated that there are 8" water and
sanitary sewer mains existing in Rule Drive. Service cannot be taken from
the 20" water transmission line along Lemay Avenue. Plant investment
fees and water rights will be due at the issuance of building permit for
each building. The City's Water Conservation Standards for Landscaping
and Irrigation will apply. Please contact Roger Buffington at 221-6681
with any questions regarding these comments.
5. The Engineering Department stated that Utility Plans must be prepared
by a Colorado licensed professional engineer. The Street Oversizing fee
for this use is currently $7,292 per acre based upon the total building
square footage. The project will be subject to the building permit fees in
effect at the time of the issuance of building permit. A Transportation
Impact Analysis will be required which addresses vehicle, bike, pedestrian
and transit service. Additional right-of-way may need to be dedicated
along Rule Drive or the sidewalk may need to be placed in a public access
easement. The traffic circle proposed approximately 25 feet from the
flowline will need to be evaluated. Separation will be needed between the
back of the sidewalk and the edge of the detention pond. Please contact
Mike Coley at 221-6750 with any questions regarding these comments.
6. The Transportation Planning Department stated that bicycle and
pedestrian access in this area is critical. Direct pedestrian access is
needed between this facility and the Sterling House PUD assisted living
facility. Pedestrian connections to Lemay Avenue and the property to the
north are needed. Bike parking is needed at the building entrance. There
is currently a parking issue at the Evangelical covenant church (about 3
hours a day, 1 day each week). Please work with adjacent property
owners regarding common/shared vehicular and pedestrian access.
Please contact Kathleen Reavis at 221-6608 with any questions regarding
these comments.
M
MEETING DATE: February 2, 1998
ITEM: Wovenhearts Assisted Living Facility.
APPLICANT: Jim Sell
Jim Sell Design
153 W. Mountain Avenue
Fort Collins, CO 80524
LAND USE DATA: Request for an approximately 25,000 square feet, 36
bed assisted living facility on approximately 3.5 acres.
The property is located at the northwest corner of
Rule Drive and S. Lemay Avenue; east of the existing
Sterling House PUD Assisted Living Facility.
COMMENTS:
The Zoning Department stated that the property is zoned MMN, Medium
Density Mixed Use Neighborhood. Long term care facilities are permitted
in the MMN District subject to Planning and Zoning Board (Type 2) review
and approval. The eight foot high fencing must receive a modification to
standard or be reduced to a maximum height of 6 feet as required by
Section 3.8.11 of the Land Use Code. Bike parking must be provided in
an amount equivalent to 5% of the vehicle parking. Vehicle parking
requirements are found in Section 3.2.2 and in the MMN District Block
Standards of Division 4.5 of the Land Use Code. An informational
handout from the Building Inspections Department was given to the
applicant. Please contact Jenny Nuckolls at 221-6760 with any questions
regarding these comments.
2. The Natural Resources Department stated that trash enclosures must
be large enough to accommodate recycling bins (approximately 9 feet by
12 feet). The pedestrian access between the proposed facility and the
Sterling House needs to be more direct. Please contact Susie Gordon at
221-6600 with any questions regarding these comments.
3. The Stormwater Utility stated that this site is located in the
McClellands/Mail Creek Basin (inventory grid #9Q) which has a new
development fee of $3,717 per acre subject to the runoff coefficient
COMNIUNrrYPLANNING AND ENVIRONMENTAL SERVICES 281N.CollegeAve. 1'0.Box 5811 PurlCollins, C()80522-0580 (970)221-6750
CURRENT PLANNING DEPARTMENT
Comm ty Planning and Environmental
Current Planning
City of Fort Collins
February 5, 1998
Jim Sell
Jim Sell Design
153 W. Mountain Avenue
Fort Collins, CO 80524
Dear Jim,
Irvices
R�%-Qvlt 0
For your information, attached is a copy of the Staff's comments concerning the
Wovenhearts Assisted Living Facility, which was presented before the Conceptual
Review Team on February 2, 1998.
The applicant proposes to construct an approximately 25,000 square feet, 36 bed assisted
living facility on approximately 3.5 acres. The property is located at the northwest corner
of Rule Drive and S. Lemay Avenue; east of the existing Sterling House PUD Assisted
Living Facility.
The comments are offered informally by Staff to assist you in preparing the detailed
components of the project application. Modifications and additions to these comments
may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in the review
process, please feel free to call me at 221-6206.
Sincerely,
�7� '
Michael Ludwig, AI P
City Planner
xc: Stormwater Utility
Project Planner
File
281 North College Avenue • W. Box 580 • Fort Collins, CO 80522-0580 9 (970) 221-6750 • FAX (970) 416-2020