DATE: April 1, 1998 DEPT: Water & Wastewater
PROJECT: #5-97A Sterling House PUD, Wovenhearts
Memory Care - Type II Project Development
Plan/Final Compliance
All comments must be received by Mike Ludwig no later than the
staff review meeting:
Wednesday, April 8, 1998
-Modify the plant note 13 on the landscape plan to include services.
-Water service must be type K copper from the main to a point 5 feet downstream of the meter
pit.
-Include standard general notes on the overall utility plans.
-Place curb stop 1 foot from the back of the utility easement and the meter pit 2 feet beyond that.
-A cleanout is required every 100 feet on a sanitary sewer service. Show and label all clean outs.
-See site, landscape and utility plans for other comments.
Date: Signature:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF
X PLAT X SITE _DRAINAGE REPORT _
X UTILITY \ REDLINE UTILITY \ LANDSCAPE
3. The 100-year frequency adjustment factor should be applied to the detention
calculations.
RESPONSE:
4. Calculations are needed to verify the volume provided by the proposed detention pond
grading.
RESPONSE:
5. Emergency spillways are needed for both detention ponds.
RESPONSE:
6. Drainage easements are needed for the detention ponds.
RESPONSE:
Erosion Control Comments
1. The dust abatement paragraph (6.4) of the erosion control report needs to say how this
can be accomplished.
2. The paragraph on permanent stabilization (6.7) of the erosion control report needs to
state that reseeding and mulching will be installed immediately, the vegetative cover
being derived from that. The. way the paragraph reads now, it can too easily be
interpreted as meaning nothing needs to be installed for 1-'/2 years.
3. The report must include performance standard, effectiveness, and escrow calculations.
Please refer to the redline report and plan for additional review comments.
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: March 11, 1998 TO: Stormwater
PROJECT: #5-97A Sterling House PUD, Wovenhearts
Memory Care -Type II Project Development
Plan/Final Compliance
All comments must be received by Mike Ludwig no later than the staff
review meeting:
Wednesday, April 8,1998
1. Detention of the half streets is needed. It appears that runoff from Rule Drive
upstream of the site can be routed through the on -site detention pond.
RESPONSE:
2. More details are needed on the improvements to the existing swale along the east side
of the site. Provide cross -sections of the improved swale for locations of different cross -
sections. More information on the proposed grading of the swale is needed. The east
side of the Swale should be improved to side slopes no greater than 4:1. The swale must
be within a drainage easement for the distance of the site.
RESPONSE:
Date:
Adle Ludw%g
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS T JR eP%-°S 51
_ Plat _ Site _ _ O �wg} lorvoca
City of Fort Collins
Comments continued from the sheet 1...
Sheet 2 of 5: Utility Plan
X Please enlarge the text on the plan view. It is very difficult to read.
X Please provide a cross-section of both Lemay Avenue and Rule Drive.
X Please show the ROW dimensions for Lemay Avenue and Rule Drive.
X Please reference all details used.
X Please modify the pedestrian connection between Lot 1 and Lot 2. 1 don't
think that the City wants to direct pedestrians into the front of parked cars.
Provide a better pedestrian -friendly connection to the building.
X Please provide curve information to the curb returns at the entrance to the
site.
X You may want to meet with the PFA to discuss the fire truck access into
the site. Talking with Ron Gonzales, he wasn't too "thrilled" with the traffic
circle feature at the front of the development.
X The portions of the sidewalk that are not contained within the ROW will
need to be contained within a pedestrian access easement.
X The saw -cut lines need to be either in the middle of the travel lane or
along the edge of the travel lane.
Sheet 4 of 5: Drainage and Erosion Control Plan
X It seems as though the cross-section for Lemay (A_A) is missing.. Please
provide and label.
X I'm concerned with the placing the storm sewer under the building. Can
this lead to problems down the road, i.e. leaks, etc.
Sheet 5 of 5: Details
X Please modify the driveway approach detail. It currently doesn't match
what is being proposed.
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: March 11, 1998 TO: Engineering
PROJECT: #5-97A Sterling House PUD, Wovenhearts
Memory Care - Type II Project Development
Plan/Final Compliance
All comments must be received by Mike Ludwig no later than the staff
review meeting:
Wednesday, April 8,1998
GENERAL COMMENTS:
Sheet 1 of 5: Cover Sheet
X Please modify the General Notes as shown on the utility plans.
X Please include a copy of the most recent plat of the Lot/subdivision for our
reference. We need to see existing easements and rights -of -way.
X We would like for you to provide us with copies of any private easements
associated with this development and all original copies of easements
being dedicated to the City.
Please see sheet 2 for additional comments r►
Date:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat ✓ Site _ Drainage Report _ Offer
Utility ✓ Redline Utility ✓ lands*
kd Attached is a redlined set of the Site/Landscape Plan and Building
Elevations. Please return the redlined set to Current Planning with plan
revisions.
7. Comments and redlined utility plans from the Engineering Department are
attached. Please return all redlined documents with plan revisions.
8. Comments and redlined utility plans from the Stormwater Utility are attached.
Please return all redlined documents with plan revisions.
9. Comments and redlined utility plans from the Water and Wastewater Utility are
attached. Please return all redlined documents with plan revisions.
This completes the review comments at this time. Additional comments may be
forthcoming as the various departments and reviewing agencies continue to review this
request.
Please provide a written response to each of the above stated comments with the submittal
of plan revisions. A Planning and Zoning Board hearing date will be assigned once all
comments have been addressed and revisions have'been reviewed.
Please contact me at 221-6206 if you have any questions or concerns related to these
comments.
Sincerely,
VO-Z
'
Michael Ludwig, AICP
City Planner
xc: Tim Blandford
Stormwater Utility
Current Planning File #5-97A
Please provide a photometric grid of proposed lighting levels across the site
so that staff may review the plan for compliance with Sections 3.2.2[C][5][c]
and 3.2.4 of the Land Use Code.
gi Please provide a breakdown of the required and proposed number of parking
spaces as per Section 3.2.2[K][2] of the Land Use Code.
jje Please note colors of all building materials on the building elevations and
/provide color samples as per Section 3.5.1 [G] of the Land Use Code.
MI Please provide a scale'for the building elevations and provide dimensions to
the top of the roof as per section 3.5.1 [H] of the Land Use Code.
Is there any'roof-top or ground mounted mechanical equipment proposed?
Is it screened? Where are building mounted utility meters proposed? Will
they be painted to match the building surface? Where is the trash enclosure
elevation? Please refer to Section 3.4.1 [J] of the Land Use Code.
Please refer to Sections 3.5.3[B][2], 3.5.3[B][2][b], and 3.5.3[B][2][c] of the
Land Use Code regarding the vehicle use area between the building face
and street; and the building setbacks from Lemay Avenue and Rule Drive.
The applicant must either revise the plan; request and receive a
determination from the Director of Planning for an "exception'; or request and
receive a modification of standard from the Planning and Zoning Board.
7� Portions of the east and west building elevations exceed 100 feet in length
without building recess or projection. Please refer to Section 3.5.3[C][1 ] of
the Land Use Code.
Please add brick/stone to the base of the building on the north and west
building elevations as per Section 3.5.3[D][2][a][3] of the Land Use Code.
Sheltering elements for building entrances are needed as per Section
3.5.3[D][4] of the Land Use Code.
Please submit a cross access easement with the Sterling House PUD for the
private drive as per Section 3.6.2[J][4] of the Land Use Code.
It appears that the proposed fencing exceeds 6 feet in height. Please either
revise or submit a request for modification to standard to Section 3.8.11 [3][c]
of the Land Use Code.
ar,/ Sidewalks adjacent to parking lots must be a minimum of 6 feet wide to
accommodate vehicle overhang as per Section 3.2.2 of the Land Use Code.
Vf Please add a sentence to Plant note #10 which states that a minor
amendment must be submitted by the applicant and reviewed and approved
by the City for any such landscaping changes.
rg� Please revise plant note #11 to reference that the escrow or letter of credit
must be for 125% of the materials and installation.
eloo� Should there be a deciduous landscape category in the water usage
information?
Sections 4.5[E][1 ][a] &[b] of the Land Use Code states that if a development
is less than 10 acres, it must demonstrate how the development request
contributes to the overall mix of block types within the surrounding area. The
proposed facility would be considered to be a part of a Civic Block which
should constitute 10% - 15% of the surrounding area. Please address
this criteria.
Please add trees around the perimeter of the building as per Section
3.2.1 [D][1 ][c] of the Land Use Code.
a466' k. Please add ornamental trees along Lemay Avenue and Rule Drive as per
Section 3.2.1 [D][2][c] of the Land Use Code. — NA� 0^ 0AW" T' -\ 4e. -p7
IO Numerous tree additions are noted on the redlined plan set. Please revise
the plant list accordingly and verify that the species diversity is in accordance
with Section 3.2.1 [D][3] of the Land Use Code.
WlbAw! Please add foundation plantings along the fence and building as noted on
the redlined plan set in a orda a with Section 3.2.1 [E][2][d] of the Land
Use Code. `p"% '`SIG Son
,r Please add deciduous shade trees along both sides of the private drive as
per Section 3.2.1 [E][5][d] of the Land Use Code.
Oz Please show utility service locations on the Landscape Plan so that staff may
review the plan for compliance with Section 3.2.1 [K] of the Land Use Code.
4z Please clarify the sidewalk connection to the existing Sterling House PUD
site. How wide is the sidewalk? Are curb ramps necessary? Should a
raised patterned crosswalk be provided? Please refer to Sections 3.2.2[C][1 ]
and 3.2.2[D][1] of the Land Use Code.
Please provide sidewalk connections as noted on the redlined plans as per
Section 3.2.2[C][5] of the Land Use Code.
4 Where is the pedestrian access between the two facilities as noted in
paragraph one of the written narrative?
G The proposed building is located within the Neighborhood Sign District.
Please show all sign locations on the building elevations. Please add a
project note to the Site Plan regarding this comment.
/9. The building elevations show a gazebo structure on the south building
elevation. The gazebo is not shown on the Site Plan. Please clarify.
Please provide one-way directional signage for traffic circulation around the
proposed round -about.
Please shift the location of the proposed tree on the south side of the four
round -about parking spaces as it causes a visual hazard for backing
vehicles.
Please provide landscaping around the perimeter of the detention pond.
Please show building envelope dimensions. and relative distances to the
property lines on the Site Plan.
Please provide parking stall, drive aisle, and sidewalk dimensions on the Site
Plan.
Please coordinate a transformer location with the Light and Power Utility. The
transformer must be adequately screened.
6. The Current Planning Department offers the following comments:
Please separate the Site and Landscape Plans due to the volume of
information being provided.
fa! Please label / show the existing sidewalk along Lemay Avenue.
�i Please delete the attorney's certificate on the Site Plan and add a notary
certification and signature block. If a replat of Lot 2 of the Sterling House
PUD is proposed, then submit a separate plat in accordance with Section
3.3.1 of the Land Use Code.
Should the "turf areas" in plant note #6 be referenced as sod?
V/ Plant note #7 references "future phase areas". However, no future phases
are shown on the Site Plan.
✓c. Any relocation of existing telephone facilities required by these plans will be
paid for by the developer.
2. The Light and Power Utility requests that your contact Bruce Vogel at 221-6600
to coordinate a transformer location.
3. The Poudre Fire Authority offers the following comments:
✓a. Fire apparatus access roads shall be provided for every facility, building or
portion of a building hereafter constructed or moved into or within the
jurisdiction when any portion of the facility or any portion of an exterior wall
of the first story of the building is located more than 150 feet from fire
apparatus access as measured by an approved route around the exterior of
the building or facility.
The fire lane(s) provided shall be signed for visibility and maintained
unobstructed (please add a project note to the Site Plan).
The roundabout entry is not acceptable to the Poudre Fire Authority.
Although it meets design criteria for turn-arounds used for dead -ends, this
is not acceptable for entries.
✓�. An automated fire suppression system is required. Quick response or
residential sprinkler heads are required in the patient sleeping quarters
(please add a project note to the Site Plan).
✓c. A manual and automatic fire alarm system is required for this facility (please
add a project note to the Site Plan).
7 d. A fire hydrant is required within 300 feet of the building.
4. The Zoning Department offers the following comments:
✓a. Please provide separate Site and Landscape Plans. There is too much
information provided for a combined plan.
�b. Fences are indicated on the Site/Landscape Plan. Please label the height
�19a of the proposed fences. A modification of standard is needed for any fences
which exceed 6 feet in height.
.��lc- The proposed building location does not meet "build -to" requirements along
Lemay Avenue (10-25 foot setback) or Rule Drive (maximum 15 foot
setback). Please refer to Sections 3.5.3[B][2][b]-[c].
Please relocate the bike rack from the west side of the building to the main
entrance on the south side of the building.
Comm ty Planning and Environmenta --rvices
Current Planning
City of Fort Collins
April 15, 1998
Del Care Corp. & ALS-Wovenhearts Inc.
c/o Jim Sell
Jim Sell Design
153 W. Mountain Avenue
Fort Collins, CO 80524
Dear Jim,
Staff has reviewed your documents for the Wovenhearts Memory Care PDP, that were
submitted on March 11, 1998 and would like to offer the following comments:
The Transportation Planning Department offers the following comments:
✓a. Please provide direct, continuous pedestrian connections between this site
and the Sterling House (not through parking areas) and to the church site
north of the property.
b. Please provide a pedestrian connection to Lemay Avenue at the north end
of the building.
A. Please providd paarrking for employees and visitors at the main entrance to
the building (south side, not the west side).
2. U S WEST offers the following comments:
✓a. Review of these plans should not be construed as a commitment that
telephone facilities sufficient to serve this project are presently available. U
S WEST will provide telephone service in accordance with the rates and
tariffs on file with the Colorado Public Utilities Commission.
✓ b. The owner is responsible for provision of all conduit, ditch crossings, and
street crossings for telephone facilities within the project. The owner also
provides terminal room space (usually 8' x 5') and power for the telephone
terminal, generally in a utility room. Contact Susan Peterson Capacity
Provisioning Field Engineer, at (970) 224-7473 for conduit specifications for
the telephone entrance cable.
281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020