Loading...
HomeMy WebLinkAboutWOVENHEARTS MEMORY CARE - PDP/FDP - 5-97A - CORRESPONDENCE - REVISIONS(Vacant) Existing Faith Evangelical Church 4.62 4% Sterling House, Wovenhearts & 19.15 15% Cottonwood j. trees have been added around the perimeter of the building. k. not necessary as per Mike Ludwig/Tim Buchanan 1. trees have been added as per redlined plans, and the species diversity is in accordance with the Land Use Code. m. foundations planting are in accordance with the Land Use Code. n. trees have been added. o. utility services are shown on the plan. p. noted on the plan. q. noted on the plan. r. a photometric grid has been provided. s. noted on the plan t. addressed by EUA u. addressed by EUA v. addressed by EUA w. an exception is being requested for the setback requirements (see attached letter) x. addressed by EUA y. addressed by EUA z. addressed by EUA aa. addressed by JR Engineering ab. addressed by EUA ac. noted on the plan. Please review this information and should you have any questions, give me a call. Sincerely, JIM SELL DESIGN Inc. 'J. Brad SaucermanJ Landscape Architect/Project Manager encl. a. The site and landscape plans have been separated onto their respective sheets b. addressed by Eppstein Uhen Architects (EUA). c. An exception to the Land Use Code is being requested for the building setback along Lemay Ave. and Rule Dr. (see attached letter) d. the bike rack has been moved to the front of the building. e. the pedestrian access has been clearly labeled on the site plan. f. addressed by EUA g. the site plan has been modified to label the gazebo structure. h. the drive width around the roundabout accommodates two way traffic, directional arrows have been provided on the plan. i. the tree in question has been shifted to the east. j. landscaping has been provided around the detention pond. k. building envelope dimensions are on the site plan 1. parking stall, drive aisle, and sidewalk dimensions has been added to the site plan. 5. Light and Power Utility - the transformer location will be adequately screened. 6. Current Planning Department a. the site and landscape plans have been separated. b. the existing sidewalk has been labeled. c. the attorney's signature has been deleted. d. sod has been noted. e. note has been deleted. f. note has been changed. g. note has been changed. h. the categories include turf grasses and ornamental (shrubs, trees, and perennials) i. The proposed site was originally included in the Oakridge West Overall Development Plan, however the site has a closer relationship to the areas included within the Oak/Cottonwood Farm ODP (Miramont). This area would include the "block" from Harmony, south between Boardwalk and Lemay Ave. The proposed site as well as the existing Sterling House and Cottonwood Facilities being similar uses comprise +/- 19.15 acres of the block in questions. The following represents the proposed site acreage and the surrounding uses and how they relate to each other with regards to percentage of use: use acres percent of total ✓Community/Regional shopping 50.3 39% (Sam's, Builders Square, Steeles, etc.) ✓Multi -family, patio homes, 30.7 24% (Miramont Apt., patio homes) PeasR a City Park/l i-f or 13.0. 10% i-- I.-4lulti-family and/or Business Ser. 9.7 8% n May 1, 1998 Mike Ludwig Project Planner City of Fort Collins Current Planning Department 281 North College Avenue Fort Collins, Colorado 80522-0580 RE: Wovenhearts Memory Care (Sterling Cottages) - Project Development Plan Staff Comments Dear Mike: The attached prints of Wovenhearts Memory Care Project Development Plan, Final Site and Landscape Plan, reflect revisions made in accordance with the comments in your letter of April 15, 1998. Our specific response to each comment is noted below, using numbering shown on your letter. 1. Transportation Planning Dept. a. Pedestrian connections have been provided to Sterling House and the church to the north. b. The existing storm drainage ditch, which parallels Lemay Ave. on the Eastern edge of the property, creates an obstacle for providing a safe pedestrian connection from the building to Lemay Ave. c. The bike parking has been moved to the front entrance. 2. US West a. addressed by JR Engineering b. addressed by JR Engineering 3. Light and Power - will be coordinated by the DelWest representative 4. Poudre Fire Authority a. Fire lanes will be signed for visibility and maintained unobstructed (note has been added to the site plan). The roundabout entry has been discussed with Ron Gonzales, and he has accepted the design with a few stipulations: 1. the planter will have roll-over curb and gutter and the turf height will not exceed 6" above the curb. 2. plantings within the planter will include only turf and a few low shrubs. 3. the fire lanes will be signed. b. noted on the site plan. c. noted on the site plan. d. addressed by JR Engineering. 4. Zoning Department