Loading...
HomeMy WebLinkAboutWOVENHEARTS MEMORY CARE - PDP/FDP - 5-97A - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject ST5ZLINg. Ht)LAsE jub, MI�M�4 CAR45 Planner: Mir W OWIG Traffic Operations: F—P►c Qevzi; Engineer: -rio %L&NoFowJ Date: _8 AMA.., I Site I Land I Plat Engineering ; i Stormwater Water/Wastewate ` I Traffic Operations Items Requested Utility I Drainage Rpt Other Items Required ,Mw Unu, s 2 P-G LAMi3b unu P�myS ��,,�, unu P�.r+�,s Redlined Items Being Returned Site I land Plat Utility Drainage R t Other Items Being Returned Cbt*4&Ar is I COHP4& ; CoNtr It6sr Trans. Planning iran*rt Natural Resources Park Planning Totals 13 4 f- Other: Nate: All redlined items should be returned with the resubmittal/ revisions. � 1 � Revisions Routing Sheet f uL A 2 , Item: [# 2 - ] WoVg mr Ma Z Date: 1q,16 FILE: PROJECT PLANNER ENGINEERING: PAVEMENT ZONING BUILDING INSPECTION LIGHT & POWER MAPPING / DRAFTING FORESTRY FCLWD/ELCOBOXELDER FIRE POLICE ADVANCE PLANNING STREETS R.O.W. PLANNING WATER CONSERVATION POST OFFICE US WEST PUBLIC SERVICE SCHOOLS: POUDRE/TIIOMPSON CABLE TV STATE HIGIIWAY DEPARTMENT DITCH COMPANY RAILROAD: UP or BN/CS / / PRPA -` �D%OE AU �/ ER. ER. TOTAL 5 -1 11 5 Rev. 5-07.97 ✓ v v