p - Project: �TERWQG DUSK
�W Meeting Location: WP-RNc-:.Q CLc�,t -p
1 C77 of Fort Collins `
3 3 Date: !2%i 1j96
dy
Attendees: Please sign this sheet. The information will be used to
v update the project mailing list and confirm attendance at nei;hborhood
meetings. Contact the Plannin; Department (221-67-90) if you wish to Did You Receive �orreci
1 receive minutes of this meetin.g. Written.Notincationl4ddres
of this meetinz?
` Name Address Zip I Yes I No IYes I N
11
I
I
&k
18. How far is the site from Lemay Avenue?
A. Approximately 300 to 500 feet.
19. Do you receive any Medicaid subsidy?
A. Not in our Colorado facilities.
20. You are licensed for a total of 50 residents?
A. Yes. Approximately 12% are couples.
8. How many employees does Sterling House have?
A. Sterling House corporation employs approximately 400-500 people.
9. What is your rate structure?
A. Approximately $1800/month. A 1 month down payment is required.
10. What process would an expansion of Collinwood be required to go through?
A. It depends on whether the original PUD was approved showing a future expansion. If so
then the applicant would only need to apply for a building permit. If not, then the
applicant would need to submit an amended PUD or other applicable plan.
11. Is this located within the Harmony Corridor?
A. Yes. It is located in a mixed use activity center of the Harmony Corridor Plan. The
proposed use is consistent with this designation.
12. When do you intend to begin construction?
A. Hopefully summer or fall of 1997.
13. The impact of this facility is not the same as a multi -family project.
14. Do you have scheduled activities for residents?
A. Yes.
15. How does the size of this facility compare to Collinwood?
A. Collinwood has 88 beds. We propose 50 beds.
16. Will the building have a security system for the protection of residents?
A. Yes. Our facilities have an electronic system which monitors all entrances/exits with
sensors. This rings back to the front desk attendant. The system complies with building
codes.
17. Why do you propose parking on the east side instead of the west side next to the fitness
A. That is our preference.
NEIGHBORHOOD MEETING MINUTES
PROJECT:
STERLING HOUSE
DATE:
DECEMBER 11, 1996
APPLICANT.
BCI CONSTRUCTION
STAFF:
MIKE LUDWIG, CITY PLANNER
QUESTIONS/ CONCERNS/ COMMENTS
1. Do you operate, any other facilities of this size?
A. Our other facilities are approximately 21-37 beds. We are proposing a 50 bed facility in
Fort Collins.
2. What does your staffing consist of ?
A. 2-3 Aides, Nurses, Cook/Help, Maintenance, and Facility Director.
3. Do you plan an expansion of the proposed facility beyond 50 units?
A. Not at this time.
4. Could you?
A. Possible, but doubtful.
5. What is the maximum height of the structure?
A. The front elevation is approximately 30 feet in height. The remaining elevations are
approximately 19 to 20 feet in height.
6. What is the height of the fitness center?
A. Maximum of approximately 40 feet.
7. Is this a long-range business?
A. We are a public company - not a short term endeavor. We have very limited franchising.