Loading...
HomeMy WebLinkAboutFIRST ASSEMBLY OF GOD PUD - PRELIMINARY - 1-97 - CORRESPONDENCE - (3)The Light and Power Utility Department stated that there is 3-phase power available from Timberline Road. It will have to be extended from south of the adjacent C.S.U. property or from the existing service to the adjacent C.S.U. property. In either case, an easement may be needed from C.S.U. The applicant should meet with the Light and Power Engineering Department separately regarding transformer locations and usage needs. Please contact Alan Rutz at 221-6700 with any questions regarding these comments. The Poudre Fire Authority stated that all of the proposed buildings should be fire sprinklered at a minimum. In addition it was recommended that a fire alarm system also be installed. Fire hydrants capable of providing 1,500 g.p.m. must be provided within 300' of all buildings. Travel lanes must be a minimum of 20' wide for fire trucks and turnarounds must have a minimum 20' inside radius and minimum 40' outside radius. Please contact Mike Pretz at 221-6570 with any questions regarding these comments. 9. The Parks Department stated that the Parkland Fee is $813 per dwelling unit. Please contact Janet Meisel at 221-6640 with any questions regarding this comment. 10. The Transportation Department stated that a Traffic Impact Analysis will be required for this proposal. This traffic study will determine the extent of improvements to Timberline that will be required. The developer is responsible for improving Timberline Road to arterial standards the length of this property's frontage. The City will reimburse the developer for all but the local portion of these improvements. Please contact Laura Varden or Eric Bracke of the Transportation Department at 221-6608 with any questions regarding these comments and to obtain a list of potential traffic consultants. of property owners within the mailing area. The developer pays the City 50 cents per name for the mailing. The City will set up the meeting upon the developers request and will facilitate the meeting. For further information regarding these comments, please contact Mike Ludwig, Project Planner at 221-6206. 3. The Building Inspections Department stated that any building which exceeds 5,000 square feet must be provided with an automatic fire suppression system. It is mandatory that the church chapel be fire sprinklered. Handicap accessible routes from any building entrance/exit within 6" of grade must be provided to the public sidewalk and must be signed and marked. The food service area for the assisted living facility must be approved by the Larimer County Health Department. Please contact Jim Devore at (970) 498-6775 to obtain the necessary application forms. Please contact Sharon Getz at 221-6760 with any questions regarding these comments. 4. The Water and Wastewater Utility Department stated there is a 16" water main located in Timberline Road. The applicant will be required to loop a service main through the development. An 8" sanitary sewer main has been extended across the Foothills Channel to the southern property line. The developer may be required to extend this sanitary sewer main through the site to the north property line. Separate water and sewer service lines and meters will be required for each building. A grease interceptor will be required for all kitchen facilities. Water Conservation Standards for Landscaping and Irrigation will be applicable. Please contact Mark Taylor at 221-6681 with any questions regarding these comments. 5. The property is located in the Foothills Drainage Basin. The stormwater development fees for this basin are $6,525 per acre based upon the amount of additional impervious surface area and the amount of on -site detention provided. The applicant will be required to provide detention for on -site flows as well as some off -site flows as per the Pinecone Overall Drainage Plan. The City may be installing a drop structure in the Foothills Channel. Staff cautions the applicant not to propose heavy irrigation near the channel due to the potential of it causing sloughing. An access easement for ditch maintenance must be provided along the Foothills Channel. A drainage report and erosion control plan must be prepared by a Colorado licensed civil engineer and submitted with the development. The channel must be surveyed prior to designing a plan for outfalls. Please contact Glen Schlueter of the Stormwater Utility Department at 221-6589 with any questions regarding these comments. 6. The Engineering Department stated that Timberline Road has a 120' wide R.O.W. (60' half section). A 5' wide sidewalk must be detached from the back of the curb by a 10' landscaped strip. A 15' utility easement must be provided behind the R.O.W. The project will be assessed a Street Oversizing Fee of $5,252 per acre for the church, school, and assisted living facility if it is classified as a nursing home; and $14,005 per acre for the day care facility. If the assisted living facility is classified as a single dwelling unit, it will be assessed a Street Oversizing Fee of $584. The Street Oversizing Fee is pro -rated based upon the amount of each land use. A 20' travel lane must be provided on each side of the median at the proposed entrance(s). Standard Utility, Grading, and Drainage Plans must be prepared by a Colorado licensed civil engineer and submitted at the time of development application. Please contact Kerrie Ashbeck at 221-6750 with any questions regarding these comments. (Aok daffil NO M) CONCEPTUAL REVIEW STAFF COMMENTS City of Fort Collins MEETING DATE: September 11, 1995 ITEM: First Assembly of God Church, Day Care, and Assisted Living Facilities. APPLICANT: Pastor Frank Estep Associate Pastor First Assembly of God 1800 S. Lemay Avenue Fort Collins, CO 80525 LAND USE DATA: Request for an approximately 2,500 seat chapel; office, school and day care uses; 1,000 car space parking lot; and 75-100 bed assisted living facility on 34 acres. The property is located on the east side of Timberline Road, north of the Fort Collins High School and Pine Cone Apartments, approximately '/4 to '/2 mile south of East Drake Road. COMMENTS: 1. The property is located in the B-P, Planned Business zoning district. All of the proposed uses, except for the assisted living (intermediate health care) facility, are permitted in the Planned Business zoning district. Since the assisted living facility is not a permitted use, the proposal must be submitted as a Planned Unit Development subject to the requirements of the Land Development Guidance System. Please contact Gary Lopez at 221-6760 with any questions regarding these comments. 2. The Planning Staff provided the applicant a copy of the Land Development Guidance System. All Planned Unit Developments are subject to mandatory compliance with all applicable All Development Criteria (see page 61). These criteria are explained in detail on pages 13-60. In addition, the proposal must achieve 60 points on the Residential Uses Point Chart (see Point Chart H on pages 78-79a). Landscaped medians will be required throughout the parking lot. Please refer to the Parking Lot Development Guide for design requirements. Substantial screening will be needed along the north, west, and south property lines. A neighborhood meeting will be required prior to the submittal of this development proposal. The Planning Department will make a geographical notification map upon your request to proceed with the project. The developer is responsible for obtaining the names and addresses COMMUNITY PLANNING & ENVIRONMENTAL SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750 PLANNING DEPARTMENT Commun Planning and Environmental 5 vices Current Planning City of Fort Collins September 19, 1995 Pastor Frank Estep Associate Pastor First Assembly of God 1800 S. Lemay Avenue Fort Collins, CO 80525 Dear Pastor Estep, • G� �,.�, �• �NINC� D�'T SI•'YS 4S2-5g22 For your information, attached is a copy of the Staff s comments concerning the request for a First Assembly of God Chapel, Day Care, and Assisted Living Facilities on Timberline Road, which was presented before the Conceptual Review Team on September 11, 1995. The applicant proposes an approximately 2,500 seat chapel; office, school and day care uses; 1,000 car space parking lot; and 75-100 bed assisted living facility on 34 acres. The property is located on the east side of Timberline Road, north of the Fort Collins High School and Pine Cone Apartments, approximately '/4 to '/2 mile south of East Drake Road. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6206. Sincerely, Michael Ludwig Project Planner xc: Stormwater Utility Transportation Department Project Planner File 281 North College Avemie • P.O. Box 580 Fort Collins, CO 80522-0580 • (970) 221-6750 FAX (970) 221-6378 TDD (970) 224-6002