HomeMy WebLinkAboutFIRST ASSEMBLY OF GOD PUD - PRELIMINARY - 1-97 - MINUTES/NOTES - CORRESPONDENCE-NEIGHBORHOOD MEETINGNT-rTr~T3'Tr\TITTr\i1T\ TN T!'\11T:T 1TTr'N-Nr \ TTT.r,,-
'^r� 1�L1LJ111Jk—/.LX V<.JL 11\1'lJ1\1Y1.-111\Ji\ 1VJC,.ra11iY1J
s for
- Project AssEMta[.( of -(r.) tiv cia-. Pub
City of Fort Collins
Meeting Location: EoKr C.QLU t, C I�- (, W ��►.v .�
is 5- Date: it�(a.
e d 4-
Attendees: Please sibn this sheet. The information will be used to
update the project mailing list and conf-irm attendance at neighborhood
meetings. Contact the Planning Department (221-6750) if you wish to
receive minutes of this meeting.
\\J .
I
0
Did You Receive Correct
Written NotiFcatioolkiddress.l
Name Address Zio
I Yes I No IYes i Nol
1
Vill
eea i�t e� OS I I I I
n
I f-1'O Gu,�i-/L✓.J � � is,2J' �--y %L �i�'c� r !"1 �i � � `'"✓
.��.37 f/E�DSTO.I�E �OS,Z 5
l� 6 20" . - ot, C"' $5 I rL
8os
cow NSLO ig OS2
'.�7.
10. Is this like the side of First Christian Church?
A. Yes, but they started with the auditorium. It's different. They still have to put out
chairs in the gym every Sunday. First Christian is 24 acres and this is 33.
11. When will the traffic study be done?
A. We would like the City to consider a traffic light at Sagebrush if CSU sells the land
to the south.
12. Approximately how far is Sagebrush to your facility?
A. 200 feet. It could be right turn only out. We are showing the potential for future
connections to the east as future development occurs.
13. What is your anticipated submittal date?
A. Either the 25th of November or in January. It will be a minimum of 2 years plus,
before this is developed. (Note: No submittal was received on November 25,
1996)
A. It will come from the churches side.
(City) Typically the right-of-way already exists. The applicant will be responsible for
widening the portion of Timberline that is adjacent to their property. The applicant
will be required to submit a traffic study which identifies all of the proposed
improvements that are needed.
(Citizen) They can't take any more from the west side of Timberline. It has to come
from the east.
4. The primary traffic would be on Saturday and Sunday?
A. I assume it would be opposite of the school.
5. We heard in the letter that there would be a nursing home facility.
A. On the south side of the plan we have a retirement complex. That would maybe
happen 20 years later. It may never happen. If it does, it would go through it's own
P.U.D. process.
(City) We require an overall development plan for the entire property with the first
PUD submittal for phased development. It gives the neighbors and the City an idea
of what's potentially in the future.
6. The school you're proposing is on the east side?
A. The church members have talked about it. It may not happen, but we have talked
about doing it.
7. ' What about the open space planned?
A. On the east side there will be a soccer field and a baseball/softball field in the
southeast corner. We want the campus look.
8. So are you going to grade the whole site, then develop it with grass and
landscaping? ,
A. Yes, we will grade the soil and put landscaping in.
9. What is the time frame for the main building?
A. It depends on who you talk to. It could take 1 year to 14-16 months. It's large -- but
very practical. It doesn't look like a church, but that's the feeling of our
congregation. There's a stage and the seating is theatrical style. There will also
be a coffee shop and a book store. It's family oriented, yet conservative.
NEIGHBORHOOD MEETING MINUTES
PROJECT: First Assembly of God Church PUD
DATE: November 6, 1996
APPLICANT: Frank Estep
STAFF: Michael Ludwig, City Planner
APPLICANT'S PRESENTATION
- 2 entrances off of Timberline
- will have... auditorium, Sunday school, children's church, music facility,
administrative office
- open space-- soccer field, ball diamond
- parking toward back-- 1 space per 3 seats-- around facility
- 2200 seats in auditorium
- daycare center and possible private school in the future
- 100,000 to 110,000 square feet of main facility
- Timberline widened-- 25 feet/ landscape setback
- 2 levels-- one main and a balcony
- pastel/earthtone colors
- stucco like walls and standing seam metal roof walls
- maximum height of the main sanctuary building is 43 feet, remaining portions of the
building small buildings are 28 feet
QUESTIONS / CONCERNS / COMMENTS
1. It certainly is big.
2. How big is the Fort Collins high school?
A. I'm not sure about that. but definitely larger than this proposed building.
3. This is about the widening of Timberline. Is the First Assembly of God property
some of that land? Or will it come
from the neighborhood?