Loading...
HomeMy WebLinkAboutFIRST ASSEMBLY OF GOD PUD - PRELIMINARY - 1-97 - CORRESPONDENCE - STREET RELATED DOCUMENTLocal Connector Street Costs prepared by.Stan X Myers P.E. Based on input from Western Mobile 4/28/97 Sidewalk 4.5 feet wide (per s.f.) Curb & Gutter (2ft. pan) (per I.f.) 3-1/2inch Asphalt Pvmnt and 6 inch Base Course (per s.y.) Total Street Improvements per I.f. Cost per Street Extension (273 I.f.) Total Estimated Cost for Both Extensions to Custer Drive Unit Cost per I.f. Cost of Roadway $1.75 $15.75 $7.50 $15.00 $9.25 $32.89 $63.64 $17,373.42 $34,746.83 1 Starr A. Myers P.E. 1318 Tarryton Drive Fort Collins, CO 80525 223-7973 (H) 482-5922 (W) April 29, 1997 Mike Herzig City of Fort Collins Planning Office . 281 N. College Ave. Fort Collins, Co 80521 Re: First. Assembly of Fort Collins - Cost of Offsite Roadway Improvements Dear Mike: Please find attached an estimate of the offsite roadway connections agreed to by First Assembly. These are based on a flowline to flowline width of 36 feet. The extensions are based on a field measured distance of 273 feet from the north property line of the church site to the south flowline of Custer Drive (extended east as a collector). I trust this will provide you with the documentation you requested.. If you have questions please contact me. Sincerely, Stan A. Myers P.E. cc: Frank Estep; FirstAssembly Lowe Ross; The Larson Group