HomeMy WebLinkAboutFIRST ASSEMBLY OF GOD PUD - PRELIMINARY - 1-97 - CORRESPONDENCE - DRAINAGE RELATED DOCUMENTMAY 05 '97 02:58PM SEAR -BROWN GROUP FC P.2
Stan A.Myers P.E.
1318 Tarryton Drive
Fort Collins, CO 80525
(W) 482-5922 (H) 223-7973
May 2, 1997
Mike Ludwig
Planning Department
City of Fort Collins
281 N. College Ave.
Fort Collins, CO 90521
Fax 112+<k 9$ 4/G- RCRo
Re: First Assembly of Fort Collins - Storm Water - Water Quality
Dear Mike:
The purpose of this letter is to convey to you that First Assembly has committed to addressing
water quality in the final design of the storm water conveyance elements for their site. The fact
that the site has substantial extra detention volume will easily allow us to accommodate the design
of a water quality feature such as a low level pond or grass filtration to address to quality of
runoff from the large parking area.
I trust this information will address your concerns. Please call me if you have questions.
Sincerely,
Stan A. Myers P.E.
pc: Frank Lstep; First Assembly of Fort Collins