Loading...
HomeMy WebLinkAboutMARTINEZ PUD - FINAL - 4-97A - CORRESPONDENCE - REVISIONS (5)Steve Olt Page 2 October 15, 1997 9. Permits have been submitted for the public street and utilities crossings over the railroad. I have spoken to Mark Sears and Jack Baier of the PUC, both assure me that there is no problem with either, they just need the time to process them. 10. An easement for the potential future sidewalk connection is included on the new plat. 11. Tract F will be maintained by the Parks & Recreation department as it always has been. The project will have a home owners association for the commercial, single family, and cohousing areas separately. These associations A, B and C will be members of a master association that will maintain common use items. 12. The note on the parking lot was asked for by parks and recreation to indicate the agreement they have with the developer to use that gravel parking lot for the park until the commercial building is developed. 16. The project will be phased as shown on the site and landscape plans. Sincerely, Mikal S. Torgerson/ M. Torgerson Architects rtkt October 15, 1997 Steve Olt City of Fort Collins Current Planning Department P.O. Box 580 Fort Collins, Colorado 80522-0580 Dear Steve: Based upon you letter written on October 8, 1997 and the referal comments we have received, we have made the following changes and clarifications to the Final Site Plan: 2a. I spoke to Janet Meisel about the coordination of utilities in Sherwood so that the entrance drive to the park is not obstructed. The developer is aware of this and will coordinate with Janet before construction begins. 2b. Brian Shear has coordinated the off site drainage easements with Janet, and will have this easement ready to go to City Council on November 4`h 2c. The developer will salvage the park departments fence and gate for them. 3a. Lots 2-10 are revised to reflect the fact that they are duplexes. 3b. Dimensions are shown for the building envelope to the property lines. 3c. The temporary construction building was put on the site because it is submittal requirement (f) on the Final Plan check list. 4. The drainage around the retail building, around the restroom building, and swale have been coordinated with parks an recreation and meet their satisfaction. 5. The off site drainage easement will go to City Council for approval on November 4`h 6. Shear is working with storm water on this water main. 7. The Public street is to be named Fat Tire Lane. 320 West Olive Fart Collins, CO 80521 970.416.7431 1.888.416.7431 Fax: 970.416.7435 [mail: mikolQarchitex.com http:\\www.archi tex.com