Loading...
HomeMy WebLinkAboutCOUNTRY CLUB CORNERS SIXTH FILING (CARWASH) - PDP - PDP170003 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEW2012 International Residential Code (IRC) 20012 Intemational Energy Conservation Code (IECC) 2012 International Mechanical Code (IMC) 2012 International Fuel Gas Code (IFGC) 2012 International Plumbing Code (/PC) as amended by the State of Colorado 2014 National Electrical Code (NEC) as amended by the State of Colorado Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2009. Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF. Frost Depth: 30 inches. Wind Load: 100- MPH 3 Second Gust Exposure B. Seismic Design: Category B. Climate Zone: Zone 5. Energy Code Use 1. Single Family; Duplex; Townhomes: 20121RC Chapter 11 or 2012 IECC Chapter 4. 2. Multi -family and Condominiums 3 stories max: 2012 IECC Chapter 4Residential Provisions. 3. Commercial and Multi -family 4 stories and taller: 2012 IECC Chapter 4Commercial Provisions. Fort Collins Green Code Amendments effective starting 2/17/2014. A copy of these requirements can be obtained at the Building Office or contact the above phone number. City of Fort Collins Building Services Plan Review 970-416-2341 Page 10 of Acknowledged 6. Please see the Development Review Guide at www.fcgov.com/drg. This online guide features a color coded flowchart with comprehensive, easy to read information on each step in the process. This guide includes links to just about every resource you need during development review. Acknowledged 7. This development proposal will be subject to all applicable standards of the Fort Collins Land Use Code (LUC), including Article 3 General Development Standards. The entire LUC is available for your review on the web at hftp://www.colocode.com/ftcollins/landuse/begin.htm. Acknowledged 8. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a Modification of Standard Request will need to be submitted with your formal development proposal. Please see Section 2.8.2 of the LUC for more information on criteria to apply for a Modification of Standard. Acknowledged 9. Please see the Submittal Requirements and Checklist at: hftp://www.fcgov.com/developmentreview/applications .php. Acknowledged 10. The request will be subject to the Development Review Fee Schedule that is available in the Community Development and Neighborhood Services office. The fees are due at the time of submittal of the required documents for the appropriate development review process by City staff and affected outside reviewing agencies. Also, the required Transportation Development Review Fee must be paid at time of submittal. Acknowledged 11. When you are ready to submit your formal plans, please make an appointment with Community Development and Neighborhood Services at (970)221-6750. Acknowledged Pre -Submittal Meetings for Building Permits Pre -Submittal meetings are offered to assist the designer/builder by assuring, early on in the design, that the new commercial or multi -family projects are on track to complying with all of the adopted City codes and Standards listed below. The proposed project should be in the early to mid -design stage for this meeting to be effective and is typically scheduled after the Current Planning conceptual review meeting. Freeman Architects will schedule a pre -submittal meeting once the code study and plans have been developed further. Applicants of new commercial or multi -family proiects are advised to call 970-416-2341 to schedule a pre -submittal meeting. Applicants should be prepared to present site plans, floor plans, and elevations and be able to discuss code issues of occupancy, square footage and type of construction being proposed. Construction shall comply with the followina adopted codes asamended: 20012 International Building Code (IBC) Page 9 of 8 Colorado Fort Collins has amendments to most of the codes listed above. See the fcgov.com/building web page to view them. Accessibility: State Law CRS 9-5 & ]CC/ANSI Al17.1-2009. Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF. Frost Depth: 30 inches. Wind Load: 100- MPH 3 Second Gust Exposure B. Seismic Design: Category B. Climate Zone: Zone 5 Energy Code Use 1. Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012 IECC. 2. Multi -family and Condominiums 3 stories max: 2012 IECC residential chapter. 3. Commercial and Multi -family 4 stories and taller: 2012 IECC commercial chapter. Planning Services Contact: Clark Mapes, 970-221-6225, cm es fcgov.com 1. Use: The carwash use is permitted in the C-S zone. The development would require a Major Amendment to 1995 CC Corners PUD which established the shopping centerlayout and infrastructure patterns in 1995. The use would require Type 1 review with a public hearing to be decided by a Hearing Officer. Acknowledged. 2. Building design: The predominant use of brick is generally consistent with the established character of the center. The exact selection of brick and possibly concrete block masonry should include consideration of the materials used in the center. Freeman Architects has studied the neighboring buildings and chosen materials that are consistent with the existing materials and color palette. 3. Screening of vehicular use areas is the crucial design consideration. Shrub beds in conjunction with screen walls should be designed to mitigate the visual clutter of carwash operations. Shrub beds have been added around all parking and vacuum areas. A combination of upright evergreens to screen carwash entries and deciduous and evergreen shrubs have been used to create a dense planting around the parking area stalls 4. Sidewalks need to be added to continue the circulation framework of the center. RESPONSE: Sidewalks are proposed to be provided along the west and north frontages of the carwash site. A sidewalk is not proposed along the east side of the site due to no connectivity to properties to the south (a sidewalk was not constructed to be extended north along the existing health services building along Bristlecone.) 5. The proposed development project is subject to a Type 1 review and public hearing, the decision maker for Type 1 hearings is an Administrative Hearing Officer. The applicant for this development request is not required to hold a neighborhood meeting for a Type 1 hearing, but if you would like to have one to notify your neighbors of the proposal, please let me know and I can help you in setting a date, time and location for a meeting. Neighborhood Meetings are a great way to get public feedback and avoid potential hiccups that may occur later in the review process. Page 8 of 8 Department: Electric Engineering Contact: Todd Vedder, 970-224-6152, tvedder fcaov.com 1. Electric Capacity Fee, Building Site charges and any system modification charges necessary will apply to this development. A link to our online fee estimator is below. http://www.fcgov.com/util ities/business/builders-and-developers/development-forms- guidelin es -regulations RESPONSE: Acknowledged 2. Currently there is 4" conduit stubbed up to this lot, which is suitable for single and three phase power. RESPONSE: Acknowledged 3. A completed commercial service form (C-1) and one -line diagram will need to be filled out by engineer/electrician and provided to Light & Power in order to determine billing and proper transformer sizing. A link to our C-1 form is below. http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1 Form. pdf RESPONSE: Acknowledged 4. Contact Light and Power Engineering to coordinate the transformer and electric meter locations. Please show these locations on the utility plans. Transformers need to have an 8' frontal and 3' side/rear clearance. It also has to be 10' within a drivable surface and cannot be located under the drip zone of any trees. Please reference our Electric Construction, Policies Practices & Procedures to ensure requirements and policies are met. http://www.fcgov.com/utilities/business/builders-and- developers RESPONSE: Acknowledged Department: Building Inspection Contact: Sarah Carter, 970-416-2748, scarterQfcgov.com 1. Please schedule a pre -submittal meeting for this project. Pre -Submittal meetings assist the designer/builder by assuring, early on in the design, that the new commercial or multi -family projects are on track to complying with all of the adopted City codes and Standards listed below. The proposed project should be in the early to mid -design stage for this meeting to be effective. Applicants of new commercial or multi -family projects should email scarter@fcgov.com to schedule a pre -submittal meeting. Applicants should be prepared to present site plans, floor plans, and elevations and be able to discuss code issues of occupancy, square footage and type of construction being proposed. Freeman Architects will schedule a pre -submittal meeting once the code study and plans have been developed further. 2. Construction shall comply with the following adopted codes as amended: 2012 International Building Code (IBC) 2012 International Residential Code (IRC) 2012 International Energy Conservation Code (IECC) 2012 International Mechanical Code (IMC) 2012 International Fuel Gas Code (IFGC) 2012 International Plumbing Code (IPC) as amended by the State of Colorado 2014 National Electrical Code (NEC) as amended by the State of Page 7 of 8 Department: Engineering Development Review Contact: Marc Virata, 970-221-6567, mvirata fcgov.com 1. Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of building permit. Please contact Matt Baker at 224-6108 if you have any questions. RESPONSE: Acknowledged 2. The City's Transportation Development Review Fee (TDRF) is due at the time of submittal. For additional information on these fees, please see: http://www.fcgov.com/engineering/dev-review.php RESPONSE: Acknowledged 3. If the proposal had frontage on a public street(s), any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate ofOccupancy. RESPONSE: Acknowledged 4. If the proposal had frontage on a public street(s), all public sidewalk, driveways and ramps existing or proposed adjacent or within the site need to meet ADA standards, if they currently do not, they will need to be reconstructed so that they do meet current ADA standards as a part of this project. The existing driveway will need to be evaluated to determine if the slopes and width will meet ADA requirements or if they need to be reconstructed so that they do. RESPONSE. Acknowledged 5. Any public improvements must be designed and built in accordance with the Larimer County Urban Area Street Standards (LCUASS). They are available online at: http://www.larimer.org/engineering/GMARdStds/UrbanSt.htm RESPONSE. Acknowledged 6. If the proposal had frontage on a public street(s), this project would be responsible for dedicating any right-of-way and easements that are necessary or required by the City forthis project. This shall including the standard utility easements that are to be provided behind the right-of-way (15 foot along an arterial, 8 foot along an alley, and 9 foot along all other street classifications). RESPONSE: Acknowledged 7. Utility plans will be required and a development agreement will be required and recorded at Larimer County once the project is finalized, with recordation costs paid for by the applicant. RESPONSE: Acknowledged 8. This site utilizes access to and from a CDOT roadway and all access to the site is governed by an access control plan. CDOT may require an amendment or update to an access permit for the potential increase in traffic out driveway(s) to College Avenue. We'll look to verify CDOT's acceptance of any access permit updates prior to final development plan approval. RESPONSE: Please let us know if there is any new information regarding the access permit. 9. A Development Construction Permit (DCP) will need to be obtained prior to starting any work on the site. RESPONSE: Acknowledged Page 6 of 8 Acknowledged 2. The applicant should make note of Article 3.2.1(C) that requires developments to submit a landscape and tree protection plan, and if receiving water service from the City, an irrigation plan, that: "...(4) protects significant trees, natural systems, and habitat, and (5) enhances the pedestrian environment". Note that a significant tree is defined as a tree having DBH (Diameter at Breast Height) of six inches or more. If any of the trees within this site have a DBH of greater than six inches, a review of the trees shall be conducted with Tim Buchanan, City Forester (970-221-6361 or tuchanan@fcgov.com) to determine the status of the existing trees and any mitigation requirements that could result from the proposed development. Acknowledged 3. If tree mitigation is necessary, please include a note on the tree mitigation plan or landscape plan, as appropriate, that requires a tree removal to occur outside of the migratory songbird nesting season (February 1-July 31), or that a survey be conducted prior to removal to ensure no active nests in the area. Acknowledged, no trees to be removed. 4. Our city has an established identity as a forward -thinking community that cares about the quality of life it offers its citizens and has many sustainability programs and goals that may benefit your project. Of particular interest may be the: 1. ClimateWise program: fcgov.com/climatewise/ 2. Zero Waste Plan and the Waste Reduction and Recycling Assistance Program (WRAP): fcgov.com/recycling/pdf/_20120404_WRAP_ProgramOver-view.pdf, contact Caroline Mitchell at 970-221-6288 or cmtichell@fcgov.com 3. Green Building Program: fcgov.com/enviro/green-building.php, contact Tony Raeker at 970-416-4238 or traeker@fcgov.com 4. Solar Energy: www.fcgov.com/solar, contact Norm Weaver at 970-416- 2312 or nweaver@fcgov.com 5. Integrated Design Assistance Program: fcgov.com/idap, contact Gary Schroeder at 970-224-6003 orgschroeder@fcgov.com 6. Nature in the City Strategic Plan: fcgov.com/planning/natureinthecity/? key= advancepl ann ing/n atu rei nthecity/, contact Justin Scharton at 970- 221-6213 or jcharton@fcgov.com Please consider the City's sustainability goals and ways for your development to engage with these efforts, and let me know if I can help connect you to these programs. Acknowledged 5. If there are any prairie dogs on site, please note that City Code and the Land Use Code require that any prairie dogs inhabiting a site must be humanely eradicated (see Section 3.4.1(N)(6) of the Land Use Code). Additionally, should this project gain approval and proceed to construction, a burrowing owl survey, in accordance with the Division of Parks and Wildlife standards, shall be conducted prior to construction by a professional, qualified wildlife biologist. Acknowledged 6. In regard to LED light fixtures, cooler color temperatures are harsher at night and cause more disruption to circadian rhythms for both humans and wildlife. Please consider a warmer color temperature (3000K-4000K) for your LED light fixtures. Please also consider fixtures with dimming capabilities so that light levels can be adjusted asneeded. Parking lot light and building mount fixtures are specified at 4000 kelvin dusk till dawn full cut off. Page 5 of 8 apply to any volume based stormwater storage, including extended detention basins and bio-retention cells. RESPONSE: Acknowledged for the interim detention pond. We understand the State Portal no longer requires documentation for elements such as rain gardens. 8. The 2016 city wide Stormwater development fee (PIF) is $8,217/acre for new impervious area over 350 sq. ft. and there is a $1,045.00/acre review fee. No fee is charged for existing impervious area. These fees are to be paid at the time each building permit is issued. Information on fees can be found at: hftp://www.fcgov. com/uti I ities/business/bu i lders-and-developers/plant-i nvestment- developme nt-fees or contact Jean Pakech at 221-6375 for questions on fees. There is also an erosion control escrow required before the Development Construction permit is issued. The amount of the escrow is determined by the design engineer, and is based on the site disturbance area, cost of the measures, or a minimum amount in accordance with the Fort Collins Stormwater Manual. RESPONSE: Acknowledged Department: Fire Authority Contact: Jim Lynxwiler, 970-416-2869, iynxwiler ooudre-fire.ora 1. FIRE LANES Fire access is required to within 150' of all exterior portions a the building perimeter. This requirement appears to be satisfied with the access drive aisles already available in the area. Code language provided below. > IFC 503.1.1: Approved fire Lanes shall be provided for every facility, building or portion of building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building orfacility. RESPONSE: Fire access is anticipated to be provided by the surrounding private drives. 2. WATER SUPPLY A hydrant is requiredwithin 300' of the building as measured along an approved path of vehicle travel. The existing utility infrastructure already available in the area appears to support this requirement however it is the applicant's responsibility to verify location, pressure and volume. Code language provided below. > IFC 508.1 and Appendix B: COMMERCIAL REQUIREMENTS: Hydrants to provide 1,500 gpm at 20 psi residual pressure, spaced not further than 300 feet to the building. RESPONSE: An existing fire hydrant is located in the northeast comer of the site which satisfies this requirement. Department: Environmental Planning Contact: Rebecca Everette, 970-416-2625, reverette(cDfcgov.com 1. With respect to landscaping and design, the City of Fort Collins Land Use Code, in Article 3.2.1 (E)(3), requires that you use low -water -use plants and grasses in your landscaping or re -landscaping and reduce bluegrass lawns as much as possible. Native and wildlife -friendly landscaping is encouraged aswell. Page 4 of 8 3. A drainage report, erosion control report, and construction plans are required and they must be prepared by a Professional Engineer registered in Colorado. The drainage report must address the four -step process for selecting structural BMPs. There is a final site inspection required when the project is complete and the maintenance is handed over to an HOA or another maintenance organization. The erosion control report requirements are in the Fort Collins Stormwater Manual, Section 1.3.3, Volume 3, Chapter 7 of the Fort Collins Amendments. If you need clarification concerning this section, please contact the Erosion Control Inspector, Jesse Schlam at 224-6015 orjschlam@fcgov.com. RESPONSE: A preliminary drainage report is included with this PDP submittal. A final drainage report will be provided with the FCP submittal. 4. This site is located within the NECCO stormwater master plan area. Specifically, the site is located within sub basin 103 of the NECCO master plan. Detention and water quality are provided for this sub basin in the Evergreen West Pond. As part of the engineering evaluation for this project, the developer will be required to show and/or provide adequate conveyance for developed runoff from the site to the Evergreen West Pond. An alternative to this would be to contribute to the downstream NECCO system. The development would then be required to restrict runoff to the existing condition 100-year release and water quality would be provided in a downstream regional pond. Fees associated with this scenario are $31,846/acre. RESPONSE: Interim onsite detention is proposed, consistent with the previous Country Club Comers filings, until the originally proposed outfall within Bristlecone is constructed. We are not anticipating the alternative of contributing to the NECCO system. 5. As currently shown on the submitted site plan, the development appears to be proposing improvements, including a building, over the top of existing stormwater infrastructure intended to convey runoff from the business park to the north of the site into the detention pond located south of the site. This development will be required to preserve the existing drainage infrastructure or provide new adequate conveyance for the runoff currently being conveyed through the site. RESPONSE: The existing storm drain is proposed to be reconfigured to accommodate the carwash site. 6. Low Impact Development (LID) requirements are required on all new or redeveloping property which includes sites required to be brought into compliance with the Land Use Code. These require a higher degree of water quality treatment with one of the two following options: A. 50% of the newly added or modified impervious area must be treated by LID techniques and 25% of new paved areas must be pervious. B. 75% of all newly added or modified impervious area must be treated by LID techniques. Standard operating procedures (SOPs) for all onsite drainage facilities will be included as part of the Development Agreement. More information and links can be found at: http://www.fcgov.com/utilities/what-we-do/stormwater/stormwater- quality/low-impact-development RESPONSE: LID requirements are proposed to be satisfied by bio-retention treatment through the use of a rain garden 7. Per Colorado Revised Statute §37-92-602 (8) effective August 5, 2015, criteria regarding detention drain time will apply to this project. As part of the drainage design, the engineer will be required to show compliance with this statute using a standard spreadsheet (available on request) that will need to be included in the drainage report. Upon completion of the project, the engineer will also be required to upload the approved spreadsheet onto the Statewide Compliance Portal. This will Page 3 of 8 Department: Water -Wastewater Engineering Contact: Shane Boyle, 970-221-6339, sboyle fcgoy.com 1. Existing water and sewer mains in the vicinity include an 8-inch water main in the drive aisle to the east, a 6-inch water main in the drive aisle to the west, and an 8-inch sewer main in the drive aisle to the west. It does not appear water or sewer services were stubbed into this site with the Country Club Corners development. RESPONSE: It is proposed to utilize the 6" water main and 8" sewer main west of the site to service this project. 2. The water conservation standards for landscape and irrigation will apply. Information on these requirements can be found at: http://www.fcgov.com/standards RESPONSE: Acknowledged. 3. Development fees and water rights will be due at building permit. RESPONSE: Acknowledged Department: Traffic Operations Contact: Martina Wilkinson, 970-221-6887, mwilkinson(cDfcaoy.com 1. The expected traffic from this parcel was anticipated with the original overall development, and as such the Traffic Impact Study requirement can be waived. We may need to work with you on various traffic details. RESPONSE: Acknowledged 2. Sidewalks will be needed along the frontages RESPONSE: Sidewalks are proposed to be provided along the west and north frontages of the carwash site. A sidewalk is not proposed along the east side of the site due to no connectivity to properties to the south (a sidewalk was not constructed to be extended north along the existing health services building along Bristlecone.) Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, ischlam fcgoy.com 1. The site disturbs more than 10,000 sq-ft, therefore Erosion and Sediment Control Materials need to be submitted at the latest by final material submittal. The erosion control requirements are in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. www.fcgov.com/erosion Please submit; Erosion Control Plan, Erosion Control Report, and an Escrow / Security Calculation. If you need clarification concerning the erosion control section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com RESPONSE: An erosion control report is anticipated to be submitted with the Final Compliance Submittal 2. The design of this site must conform to the drainage basin design of the Dry Creek Master Drainage Plan as well the Fort Collins Stormwater Criteria Manual. RESPONSE: Acknowledged Page 2 of 8 City of Fort Collins March 01, 2016 Jim Houck C-Three LLC 3500 S Timberline Rd Fort Collins, CO 80524 Community Developmentand Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 -fax fcgov com Re: Country Club Corners - Car Wash Description of project: This is a request to build a drive-thru car wash at Country Club Corners (parcel #9701261008). The facility will feature a 120' tunnel car wash with 16 parking spaces with vacuums. The site is located in the Service Commercial (CS) zone district. This proposal will be subject to Administrative (Type 1) review. Please see the following summary of comments regarding the project request referenced above. The comments offered informally by staff during the Conceptual Review will assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you have any questions regarding these comments or the next steps in the review process, you may contact the individual commenter or direct your questions through the Project Planner, Clark Mapes, at 970-221-6225 orcmapes@fcgov.com. Comment Summary: Department: Zoning Contact: Noah Beals, 970-416-2313, nbealsafcgov.com 1. Does the building straddel the property line? This may need to be replatted. RESPONSE: The property is proposed to be replatted. 2. Trash and recycling enclosure required. This shall be designed with walk-in access separate from the main service gate. RESPONSE: An enclosure has been provided on the SE corner of the site with walk in access. 3. Need to include a bike rack. RESPONSE: Two bike racks with the code requirement of 4 bike capacity has been added to the plans. 4. Sidewalk system needs to be provided, that connects to the rest of the shopping center. RESPONSE: Sidewalks are proposed to be provided along the west and north frontages of the carwash site. A sidewalk is not proposed along the east side of the site due to no connectivity to properties to the south (a sidewalk was not constructed to be extended north along the existing health services building along Bristlecone.) Page 1 of 8