Loading...
HomeMy WebLinkAboutMARTINEZ PUD - PRELIMINARY - 4-97 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTAPPENDIX H Erosion Control Calculations Erosion Control Sequencing schedule Erosion Control security deposit estimate January 16, 1997 Project No: 1558-01-97 Basil Hamdan City of Ft. Collins Stormwater Utility P.O. Box 580 Ft. Collins, Colorado 80524 Re: Martinez P.U.D.; Ft. Collins, Colorado Dear Basil, Enclosed, please find the Preliminary Drainage and Erosion Control Report for Martinez P.U.D. The hydrology data and the hydraulic analysis presented in this report complies with the requirements of the City of Fort Collins Storm Drainage Criteria Manual dated March, 1984, the City of Fort Collins Erosion Control Reference Manual and the Old Town Master Drainage Basin Plan for the City of Fort Collins. If you have questions, or require further information on any item, please call me or Mark Oberschmidt at (970) 226-5334. Shear Engineering Corporation BWS / meo cc: James W. Leach; Wonderland Hill Development Company Mikal Stephen Torgerson; M Torgerson Architects 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-031 l jov Figure 4: FLOODED AREAS for I 100 YEAR STORM OLD TOWN MASTER DRAINAGE BASIN PLAN for the CITY of FORT COLLINS F RCE if Legend: FLOODED AREAS MAPPED WITH DETAILED MAPPING APPROXIMATE LIMITS o1 POTENTIAL SHALLOW �u FLOODING LESS THAN 1.5- IN DEPTH f i w:. t _ I i= mamma t s ;; Figure 2: J11 -_ - MAJOR STORM SEWERS ---,�--CIA= OLD TOWN MASTER DRAINAGE - BASIN PLAN for the Ex �-; � F _,_I`;_,_(� J �'� !_, � ! � •- ;�. CITY of FORT COLLINS i.�.�J ��:.J • L..J % ht CWIm CaaWe - _ Legend: .t (/ I` D4Mtt ! •- D AE OMMTER OR GREATER ict • - \\ `' ..t:no .rli �• �r �i Dktt e p �- �\ i <e — _:. 100 • N 111 _��.�L- _PVCNUE .-. :Li—, R _._ a-.• 2x vrot �r { J — ;o Z Scale �:• .... �.. r DutEkt e� i— - --- Cam' Imo— J 77 FF T J Obtrkt , 2 iTp i jA==FC r from flooding in the Old Town Basin indicated that the average annual damage of flooding in the basin is $585,000 per year. The first level of improvements are the minor capital improvements which solve the localized problem. The localized improvements include replacement of inlets and lateral pipes where routine problems exist. A program of asphalt removal should occur for street overlays to reestablish curb and gutter sections and to lower street crowns that inhibit the overland flow of water when storm sewer capacity is exceeded or inlets clogged. This increase in pavement height results in increased ponding depths above these paving areas. Improvements to curb extensions ("pedestrian bulbs") should be made to assure that drainage waters are not ponded or diverted toward the buildings where inlet capacity is exceeded or inlets become clogged. A five phase program of major improvements has been recommended. The first phase is the construction of a new storm sewer system along Mountain Avenue. The second phase is the construction of an outfall channel and improved overland flow system near Laurel Street and Riverside Avenue.. The third phase of the improvements is the construction of a new outfall channel near Mason Street and Cherry Street..Thd fourth phase is the improvement of street grades along Plum Street, Whedbee Street, and Locust Street, to provide for street capacity to carry overland flows during major storm events. The final phase of improvements would be to regrade Canyon Avenue and Howes Street thus diverting overland flow to the new outfall channel at Mason Street and Cherry Street. The overall cost benefit ratio of these improvements is 1.12 with the improvements being paid for by either a combination of stormwater utilities and other revenues. The average annual benefits resulting from the project would be $405,30O per year. Other specific improvements recommended include intersection improvements at five intersections in the upper reaches of the basin, installation of a new storm sewer system along Linden Street, and water quality enhancement facilities at three major storm sewer outfalls. 15 location of sites available for treatment are located in an area which may be enhanced by the creation of wetlands. This study investigated the cost of establishing water quality enhancement facilities at the Locust outfall, the Mountain Avenue system east of Lincoln Avenue, and the Laporte Avenue system north of Cherry Street in addition to replacement of the storm sewers along Mountain Avenue in Old Town. Recent redevelopment plans in the downtown area have include the removal of some of the railroad tracks northeast of Jefferson will allow redevelopment of this area at Linden and Jefferson Streets. The existing storm sewer system in this area is undersized and in need of repair. It is anticipated that new storm sewers will be installed as part of new development. As part of the overall project planning, the timing and phasing of construction was considered. Table 3 presents refined cost estimates for the recommended project phasing. Phasing of the construction would be as follows: Phase I - Downtown Storm Sewer The downtown area is in immediate need of these improvements. Damages occur almost every summer because of the inadequate storm sewer system. Phase II - Locust Outfall The east end of the Locust storm sewer system is in need of improvement due to poor drainage conditions at the east end of Laurel Street. In addition, these improvements should occur prior to new development in the area. Phase III - Howes -Mason Outfall The north end of .the Laporte Avenue system experiences surcharging almost every year. This area would benefit from improvements prior to new development occurring in this area. Phase IV - Elizabeth -Plum Street Regrading The area near Whedbee and Plum frequently causes basement flooding. This area would be of next importance for improvements. These improvements e cannot be installed until Phase II improvements are in place. Phase V - Canyon Avenue Street Regrading The improvements along Canyon and Howes would be the final phase of improvements to be completed. These improvements cannot be installed before the Reach 6 improvements are complete. In addition to the improvements discussed above, cost estimates were included for the other improvements identified. These include the street intersection improvements and the water quality improvements. Cost estimates were also prepared for the Linden Street storm sewer improvements. The timing of the improvements was discussed with the staff and reviewing agencies and public. As a result, it is -envisioned that the improvements will be constructed as fees are collected. 13 APPENDIX IV Portions of the Old Town Master Drainage Basin Plan No Text DRAINAGE CRITERIA MANUAL RUNOFF 6Y�7 30 I— 20 z w U Ir w a 10 z ; w a f; O 5 w ¢ 3 O U 2 CC) w E-- a 1 5 .1 ,�■ I I rI■ ���� ONE �■�_� �■■■N MEN NONNI •I • Il ,' ��.....►..►.■ :.�C....■�C■■■■EMNO. A.►�.�.I..■►.... .�■�.�.■■..�� ■INVAN1■eii■ i�0 missi 2 .3 .5 1 2 3 5 10 20 VELOCITY IN FEET PER SECOND FIGURE 3-2. ESTIMATE OF AVERAGE FLOW VELOCITY FOR USE WITH THE RATIONAL FORMULA. *MOST FREQUENTLY OCCURRING "UNDEVELOPED" LAND SURFACES IN THE DENVER REGION. REFERENCE: "Urban Hydrology For Small Watersheds" Technical Release No. 55, USDA, SCS Jan. 1975. 5 -1-84 URBAN DRAINAGE & FLOOD CONTROL DISTRICT 3.1.7 Time of Concentration In order to use the Rainfall Intensity Duration Curve, the time of concentration must be known. This can be determined either by the following equation or the "Overland Time of Flow Curves" from the Urban Storm Drainage Criteria Manual, included in this report (See Figure 3-2). Tc=1.87 1.1—CC D"Z S' Where Tc = Time of Concentration, minutes S = Slope of Basin, % C = Rational Method Runoff Coefficient D = Length of Basin, feet Cf = Frequency Adjustment Factor Time of concentration calculations should reflect channel and storm sewer velocities as well as overland flow times. 3.1.8 Adjustment for Infrequent Storms The preceding variables are based on the initial storm, that is, the two to ten year storms. For storms with higher intensities an adjustment of the runoff coefficient is required because of the lessening amount of infiltration, depression retention, and other losses that have a proportionally smaller effect on storm runoff. These frequency adjustment factors are found in Table 3-4. Table 3-4 RATIONAL.METHOD FREQUENCY ADJUSTMENT FACTORS Storm Return Period Frequency Factor Nears) C, 2 to 10 1.00 11 to25 1.10 26 to 50 1.20 51 to 100 1.25 Note: The product of C times C, shall not exceed 1.00 3.2 Analysis Methodology The methods presented in this section will be instituted for use in the determination and/or verification of runoff at specific design points in the drainage system. These methods are (1), the Rational Method and (2) the Colorado Urban Hydrograph Procedure (CUHP). Other computer methods, such as SWMM, STORM, and HEC-1 are allowable if results are not radically different than these two. Where applicable, drainage systems proposed for construction should provide the minimum protection as determined by the methodology so mentioned above. 3.2.1 Rational Method For drainage basins of 200 acres or less, the runoff may be calculated by the Rational Method, which is essentially the following equation: Q = C,CIA Where Q = Flow Quantity, cfs A =Total Area of Basin, acres Cf = Storm Frequency Adjustment Factor (See Section 3.1.8) C = Runoff Coefficient (See Section 3.1.6) 1 = Rainfall Intensity, inches per hour (See Section 3.1.4) 3.2.2 Colorado Urban Hydrograph Procedure For basins larger than 200 acres, the design storm runoff should be analyzed by deriving synthetic unit hydrographs. It is recommended that the Colorado Urban Hydrograph Procedure be used for such ana!ysis. This procedure is detailed in the Urban Storm Drainage Criteria Manual, Volume 1, Section 4. MAY 1984 3-5 DESIGN CRITERIA R-M-P Medium Density Planned Residential District — designation for medium density areas planned as a unit (PUD) to provide a variation in use and building placements with a minimum lot area of 6,000 square feet. R-L-M Low Density Multiple Family District — areas containing low density multiple family units or any other use in the R-L District with a minimum lot area of 6,000 square feet for one -family or two-family dwellings and•9,000 square feet for multiple -family dwellings. M-L Low Density Mobile Home District — designation for areas for mobile home parks containing independent mobile homes not exceeding 6 units per acre. M-M Medium Density Mobile Home District — designation for areas of mobile home parks containing independent mobile homes not exceeding 12 units per acre. B-G General Business District — district designation for downtown business areas, including a variety of permitted uses, with minimum lot areas equal to 1 /2 of the total floor area of the building. B-P Planned Business District — designates areas planned as unit developments to provide business services while protecting the surrounding residential areas with minumum lot areas the same as R-M. H-B Highway Business District — designates an area of automobile -orientated busi- nesses with a minimum lot area equal to 1/2 of the total floor area of the building. B-L Limited Business District — designates areas for neighborhood convenience centers, including a variety of community uses with minimum lot areas equal to two times the total floor area of the building. C Commercial District —designates areas of commercial, service and storage areas. I-L Limited Industrial District —designates areas of light industrial uses with a minimum area of lot equal to two times the total floor area of the building not to be less than 20,000 square feet. I-P Industrial Park District —designates light industrial park areas containing controlled industrial uses with minimum lot areas equal to two times the total floor area of the building not to be less than 20,000 square feet. 1-G General Industrial District— designates areas of major industrial development. T Transition District — designates areas which are in a transitional stage with regard to ultimate development. For current and more explicit definitions of land uses and zoning classifications, refer to the Code of the City of Fort Collins, Chapters 99 and 118. Table 3-3 RATIONAL METHOD RUNOFF COEFFICIENTS FOR COMPOSITE ANALYSIS Character of Surface Runoff Coefficient Streets, Parking Lots, Drives: 0.95 Asphalt................................................................................................ 0.95 Concrete 0.50 Gravel................................................................................................ 0.95 Roofs .............................. .................................................. Lawns, Sandy Soil: 0.1 Flat <2% .............................................................. ............................... 0. 5 Average2 to 7%.................................................................................. 0.20 Steep>7%.......................................................................................... Lawns, Heavy Soil: 0.2 Flat<2%............................................................................................. 0.25 Average2 to 7%..............................:................................................... 0.35 Steep>7%......... :.................................................. ............. ................. MAY 1984 3-4 DESIGN CRITERIA APPENDIX III Backup Diagrams and Exhibits Table 3-3; Rational Method Runoff Coefficients for Composite Analysis Table 3-4; Rational Method Frequency Adjustment Factors Figure 3-2; Estimate of Average Flow Velocity for Use with the Rational Formula Figure 3-1; City of Ft. Collins Rainfall Intensity Duration Curve CONSTRUCTION SEQUENCE PROJECT: Martinez P.U.D. STANDARD FORM C SEQUENCE FOR 1997-1998 ONLY COMPLETED BY: MEO / Shear Engineering Corp. Indicate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new schedule for approval by the City Engineer. Year 197 98 Month J J A S O N D J F M A M I OVERLOT GRADING *** WIND EROSION CONTROL * Soil Roughening *** Perimeter Barrier Additional Barriers Vegetative Methods Soil Sealant Other RAINFALL EROSION CONTROL STRUCTURAL: Sediment Trap/Basin Inlet Filters Straw Barriers *** Silt Fence Barriers *** Sand Bags Bare Soil Preparation Contour Furrows Terracing Asphalt/Concrete Paving Other VEGETATIVE: Permanent Seed Planting Mulching/Sealant Temporary Seed Planting Sod Installation Nettings/Mats/Blankets Other *** *** *** *** *** *** STRUCTURES: INSTALLED BY: OWNER MAINTAINED BY: OWNER VEGETATION/MULCHING CONTRACTOR: OWNER DATE PREPARED: 01 15 97 DATE SUBMITTED: 01116197 APPROVED BY'THE CITY OF FORT COLLINS ON: RAINFALL PERFORMANCE STANDARD EVALUATION PROJECT: MARTINEZ PUD PROJ. NO. 1558-01-97 STANDARD FORM A COMPLETED BY: MARK OBERSCHMIDT DATE: 01/16/97 f tffr##f+f4+*#f*f##tfi txxxxx+xxx++Yf rfifi#rxxxxxxx+##f#k*rfi**k**t*fi *fi rfi rx+xxx+f xf+x+Yf #*t*** DEVELOPED BRODIBILITY Aob Lob Sob Lb Sb PS SUBBASIN ZONE (ac) (ft) (1) (feet) M (t) *#xfirtxxxxrtrtxrtxxrt*x+fr#rr+x*r+xxrtx+#r+r#frrxxxxxrtx+rrrf rrrrrr:f#*+rr#r#x#xr#xtfirtrt*rtr+rrfifirt* la MODERATE 7.28 1300.00 1.00 9464 7.28 lb MODERATE 4.10 200.00 1.10 820 4.51 0 0.00 0 0.00 0 0.00 +++rrxx#+rr*rtrtrtrtrtrrfx#rrrrfixrfi xrtxrt#+++frrrrr#rr#r+++++++xrtr+#f rff #txtx*+fir+++++++ 11.38 903.69 1.04 LINEAR INTERPOLATION SLOPE LENGTH 1.00 1.04 1.50 900 78.2 78.32 79.8 904 78.32 1000 78.3 78.42 79.9 CONCLUDE: PERFORMANCE STANDARD = 78.32% EROSION CONTROL PLAN OVERALL EFFECTIVENESS MUST EXCEED THIS EFFECTIVENESS CALCULATIONS PRELIMINARY STANDARD FORM B PROJECT: MARTINEZ PUD PROD. NO.1558-01-97 BY: MARK OBBRSCHMIDT DATE O1/16/97 ------------------------------------------------------------------------------------------ EROSION CONTROL C-PACTOR P-FACTOR COMMENT METHOD VALUE VALUE ------------------------------------------------------------------------------------------ ROUGHENED GROUND 1.00 0.90 ROOF AREAS ASPHALT 0.01 1.00 SUB BASIN 1 SOD 0.01 1.00 SUB BASIN 1 SILT FENCE 1.00 0.60 SUB BASIN 1 HAYBALE BARRIERS 1.00 0.80 SUB BASIN 1 ------------------------------------------------------------------------------------------ MAJOR PS SUB AREA CALCULATIONS BASIN % BASIN acre AREA C P ------------------------------------------------------------------------------------------ 1 78.32% la 7.28 ROOF 4.14 ACRES 1.00 0.90 SOD 2.18 ACRES 0.01 1.00 ASPHALT 0.96 ACRES 0.01 1.00 SILT FENCE 1.00 0.50 EQUATIONS HAYBALB 1.00 0.80 C = WEIGHTED AVG OF C X AREA P= (WEIGHTED AVG OF P X AREA) X P C= 0.5730 BFP = (1 - P X C) X 100 P = 0.3773 EPF 78.38% ------------------------------------------------------------------------------------------ lb 4.10 ROOF 2.33 ACRES 1.00 0.90 SOD 1.23 ACRES 0.01 1.00 ASPHALT 0.54 ACRES 0.01 1.00 SILT PENCE 1.00 0.50 HAY BALE 1.00 0.80 C = 0.5726 P = 0.3773 EFF 78.40% ------------------------------------------------------------------------------------------ r++xrrrr+++tr+r++rrtrr++rtt+r+rttt+++rtrttr+r+rtt+rrrtttrrttrr++r+rttrtr+++rrrtrxrr+++rrxx TOTAL AREA = 11.38 ACRES OVERALL EFFECTIVENESS = 78.39% > 78.32% CONCLUDE: EROSION CONTROL PLAN IS EFFECTIVE January 16, 1997 Project No: 1558-01-97 -Re: EROSION CONTROL SECURITY DEPOSIT REQUIREMENTS: Erosion Control Cost Estimate for Martinez P.U.D.; Fort Collins, Colorado A. An erosion control security deposit is required in accordance with City of Fort Collins policy (Chapter 7, Section C: SECURITY; page 7.23 of the City of Fort Collins Development Manual). In no instance shall the amount of the security be less than $ 1000.00. a. The cost to install the proposed erosion control measures is approximately $ 5,025.00 Refer to the cost estimate attached in Appendix I. 1.5 times the cost to install the erosion control measures is $ 7,537.50. b. Based on current data provided by the City of Fort Collins Stormwater Utility, and based on an actual anticipated net affected area which will be disturbed by construction activity (approximately 8.5 acres), we estimate that the cost to re - vegetate the disturbed area will be $ 4,250.00 ($ 500.00 per acre x 8.5 acres). 1.5 times the cost to re -vegetate the disturbed area is $ 6,375.00. The $ 500.00 per acre for re -seeding sites greater than 10 acres was quoted to us by the City of Fort Collins Stormwater Utility personnel. CONCLUSION: The erosion control security deposit amount required for Martinez P.U.D. will be $ 7,537.50. 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-031 1 January 16, 1997 Project No: 1558-01-97 Basil Hamdan City of Fort Collins Stormwater Utility P.O. Box 580 Ft. Collins, Colorado 80522 Re: Erosion Control Cost Estimate for Martinez P.U.D. Fort Collins, Colorado Dear Basil, Attached is the erosion control security deposit estimate for Martinez P.U.D. ESTIMATE 1: 1600 LF of Silt Fence Q $ 3.00 per LF 3 Haybale barriers O $75.00 each TOTAL ESTIMATED COST: ESTIMATE 2: re -vegetate the disturbed area of 8.5 acres at $500.00 per acre TOTAL ESTIMATED COST: $ 4, 800.00 $ 225.00 $ 5,025.00 x 1.50 $ 77537.50 $ 4,250.00 $ 4,250.00 x 1.50 $ 6,375.00 In no instance shall the amount of the security be less than $ 1,000.00. Therefore, the total required erosion control security deposit for Martinez P.U.D. will be $ 7,537.50. If you have any questions, please call at 226-5334. Sincerely, Mark Oberschmidt Shear Engineering Corporation MEO/meo cc: James W. Leach; Wonderland Hill Development Company Dave Stringer; City of Fort Collins 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-031 1 SHEAR ENGINEERING CORPORATION PRELIMINARY DEVELOPED PAGE FLOW TO MARTINEZ PARK FROM MINOR BASIN 1b PROJECT: MARTINEZ PUD DATE 01/16/97 LOCATION:FORT COLLINS PROJ. NO.1558-01-97 PILE: MARTRUN BY MHO AREA (A)= 4.100 ACRES RUNOFF CORP. (C) 2 YEAR 10 YEAR 100 YEAR C = 0.73 0.73 0.91 SEE SPREAD SHEET ATTACHED ON PAGE 2 TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME (Ti) LENGTH = 240 FEET SLOPE = 2.00 % 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 Ti (min)= 20.74 20.74 19.59 TRAVEL TIME (Tt)=L/(60*V) FLOW TYPE L (ft) =? S (%) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) =? S (%) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) =? S (%) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) =? S (%) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) =? S (%) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) =? S (%) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) =? S (%) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) = 0.00 TOTAL LENGTH = 240 L/180+10= 11.33 < 19.59 CHOOSE LESSER Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR �100 YEAR Tc (min)= 11.33 11.33 11.33 USE Tc = 11.0 11.0 11.0 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 2.46 4.31 6.92 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (cfs) 2 YEAR 10 YEAR 100 YEAR Q = 7.32 12.82 25.74 CONCLUDE:SHBET FLOW INTO MARTINEZ PARK 8 SHEAR ENGINEERING CORPORATION . PRELIMINARY DEVELOPED PAGE FLOW TO MARTINEZ PARK FROM MINOR BASIN Is PROJECT: MARTINEZ PUD DATE O1/16/97 LOCATION:FORT COLLINS PROJ. NO.1558-01-97 FILE: MARTRUN BY MHO AREA (A)= 7.280 ACRES RUNOFF CORP. (C) 2 YEAR 10 YEAR 100 YEAR C = 0.73 0.73 0.91 SEE SPREAD SHEET ATTACHED ON PAGE 2 TIME OF CONCENTRATION (TO OVERLAND TRAVEL TIME (Ti) LENGTH = 60 FEET SLOPE = 2.00 $ 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 Ti (min)= 10.37 10.37 9.79 TRAVEL TIME (TO=L/(60;V) FLOW TYPE L (ft) = 1600 S (%) = 1.00 GUTTER V (fps) = 2.00 Tt(min)= 13.33 L (ft) _? S (%) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) _? S (t) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) _? S (%) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) _? S M = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) _? S (6) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) _? S (%) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) = 13.33 TOTAL LENGTH = 1660 L/100+10= 19.22 < 23.13 CHOOSE LESSER Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 19.22 19.22 19.22 USE Tc = 19.0 19.0 19.0 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR 1 1.91 3.35 5.38 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (cfe) 2 YEAR 10 YEAR 100 YEAR Q = 10.07 17.69 35.51 CONCLUDE: FLOW TO PROPOSED PARK ACCESS ROAD 7 SHEAR ENGINEERING CORPORATION PRELIMINARY DEVELOPED PAGE FLOW TO MARTINEZ PARK FROM OVERALL AREA PROTECT: MARTINEZ PUD DATE 01/16/97 LOCATION:FORT COLLINS PROS. NO.1558-01-97 FILE: MARTRUN BY MEO AREA (A)= 21.76 ACRES RUNOFF COEF. (C) 2 YEAR 10 YEAR 100 YEAR C = 0.70 0.70 0.86 SEE SPREAD SHEET ATTACHED ON PAGE 2 TIME OF CONCENTRATION (TO OVERLAND TRAVEL TIME (Ti) LENGTH = FEET SLOPE = k 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 Ti (min)= 0.00 0.00 0.00 TRAVEL TIME (It) =L/(60*V) FLOW TYPE L (ft) = 1140 S (k) = 0.70 SWALE V (fps) = 1.33 Tt(min)= 14.29 L (ft) = 520 S (k) = 1.00 GUTTER V (fps) = 2.00 Tt(min)= 4.33 L (ft) =? S (k) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) =? S (%) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) =? S (%) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) =? S (k) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) =? S (k) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) = 18.62 ADD Tt USING L/180+10 TO HISTORIC Tc WITH L = 600 L/180+10= 13.33 MIN Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 31.95 31.95 31.95 USE Tc = 32.0 32.0 32.0 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR 1 = 1.41 2.51 4.04 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (cfs) 2 YEAR 10 YEAR 100 YEAR Q = 21.48 38.27 77.02 VERSUS HISTORIC FLOWS Qhist = 12.15 21.95 44.14 CONCLUDE:LET IT FLY 6 SHEAR ENGINEERING CORPORATION PRELIMINARY HISTORIC PAGE FLOW TO MARTINEZ PARK FROM OVERALL AREA PROJECT: MARTINEZ PUD DATE 01/16/97 LOCATION:PORT COLLINS PROJ. NO.1558-01-97 FILE: MARTRUN BY MHO AREA (A)= 21.76 ACRES RUNOFF CORP. (C) 2 YEAR 10 YEAR 100 YEAR C = 0.43 0.43 0.54 SHE SPREAD SHEET ATTACHED ON PAGE 2 TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME (Ti) NOT APPLICABLE LENGTH = FEET SLOPE = 6 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 Ti (min)= 0.00 0.00 0.00 TRAVEL TIME (TO=L/(60-V) PLOW TYPE L (ft) = 1140 S W = 0.70 SWALE V (fps) = 1.33 Tt(min)= 14.29 L (ft) = 520 S (6) = 2.00 LAWN V (fps) = 1.00 Tt(min)= 8.67 L (ft) =? S (8) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) =? S M = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) =? S (%) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) =? S (k) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) =? S M = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) = 22.95 ADD Tt USING L/180+10 TO HISTORIC Tc WITH L = 600 L/180+10= 13.33 MIN Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 36.29 36.29 36.29 USE Tc = 36.0 36.0 36.0 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 1.30 2.34 3.77 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (cfs) 2 YEAR 10 YEAR 100 YEAR Q 12.15 21.95 44.14 CONCLUDE:COMPARE WITH DEVELOPED FLOWS 5 SHEAR ENGINEERING CORPORATION PRELIMINARY DEVELOPED PAGE FLOW TO MARTINEZ PARK FROM SITE PROJECT: MARTINEZ PUD DATE 01/16/97 LOCATION:FORT COLLINS PROJ. NO.1558-01-97 FILE: MARTRUN BY HBO AREA (A)= 11.380 ACRES RUNOFF COEF. (C) .2 YEAR 10 YEAR 100 YEAR C = 0.73 0.73 0.91 SHE SPREAD SHEET ATTACHED ON PAGE 2 TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME (Ti) LENGTH = 60 FEET SLOPE = 2.00 % 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 Ti (min)= 10.37 10.37 9.79 TRAVEL TIME (TO=L/(60*V) FLOW TYPE L (ft) = 1600 S (%) = 1.00 GUTTER V (fps) = 2.00 Tt(min)= 13.33 L (ft) _? S (%) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) _? S (%) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) _? S (%) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) _? S (%) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) _? S (%) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) _? S (%) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) = 13.33 TOTAL LENGTH = 1660 L/180+10= 19.22 < 23.13 CHOOSE LESSER Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 19.22 19.22 19.22 USE Tc = 19.0 19.0 19.0 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR 1 = 1.91 3.35 5.38 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (cfs) 2 YEAR 10 YEAR 100 YEAR Q = 15.75 27.65 55.50 VERSUS HISTORIC FLOWS Qhist = 4.11 7.22 14.53 CONCLUDE:LBT IT FLY 4 SHEAR ENGINEERING CORPORATION PRELIMINARY HISTORIC PLOW TO MARTINEZ PARK FROM SITE PROJECT: MARTINEZ PUD LOCATION:PORT COLLINS FILE: MARTRUN AREA (A)= 11.380 ACRES DATE O1/16/97 PROD. NO.1558-01-97 BY MEO PAGE 3 RUNOFF CORP. (C) 2 YEAR 10 YEAR 100 YEAR C = 0.21 0.21 0.26 SEE SPREAD SHEET ATTACHED ON PAGE 2 TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME (Ti) LENGTH = 0 FEET SLOPE = 0.00 $ 2 YEAR 10 YEAR 100 YEAR C = 0.20- 0.20 0.25 Ti (min)= 0.00 0.00 0.00 TRAVEL TIME (TO=L/(60*V) PLOW TYPE L (ft) = 1140 S ($) = 0.70 SWALE V (fps) = 1.33 Tt(min)= 14.29 L (ft) = 520 S ($) = 2.00 LAWN V (fps) = 1.00 Tt(min)= 8.67 L (ft) _? S ($) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) _? S ($) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) _? S ($) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) _? S ($) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) _? S ($) = 1.00 NONE V (fps) = 0.00 Tt(min)= 0.00 ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) = 22.95 Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 22.95 22.95 22.95 USE Tc = 23.0 23.0 23.0 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 1.72 3.02 4.86 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (cfs) 2 YEAR 10 YEAR 100 YEAR Q 4.11 7.22 14.53 CONCLUDE:COMPARB WITH DEVELOPED FLOWS SHEAR ENGINEERING CORPORATION PRELIMINARY SUBBASIN BREAKDOWN PAGE 2 PROJECT: MARTINEZ PUD DATE 01/16/97 LOCATION:FORT COLLINS BY MBO PROD. NO.MARTRUN TOTAL SITE AREA = 11.38 TOTAL BASIN AREA = 21.76 ASSUMPTIONS: SITE IS 70% IMPERVIOUS AND 30% LAWNS, HEAVY SOIL TOTAL AREA INCLUDES RESIDENTIAL AREA NORTH OF CHERRY AND EAST OF SHERWOOD OFFSITE AREA = 452250 SF = 10.38 ACRES OFFSITE AREA IS ASSUMED TO BE SPLIT 55/37/7/1 ROOF/GRASS/ASPHALT/CONRETE SITE HISTORIC DEVELOPED HISTORIC DEVELOPED OFFSITE OVERALL OVERALL la lb ASPHALT 0.00 6.47 0.73 0.73 7.20 4.14 2.33 CONCRETE 0.00 0.00 0.10 0.10 0.10 0.00 0.00 GRAVEL 0.38 0.00 0.00 0.38 0.00 0.00 0.00 ROOFS 0.00 1.50 5.71 5.71 7.21 0.96 0.54 LAWNS,SANDY SOIL FLAT < 2% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 AVERAGE 2 TO 7% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 STEEP > 7% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 LAWNS, HEAVY SOIL: FLAT < 2% 11.00 3.41 3.84 14.84 7.25 2.18 1.23 AVERAGE 2 TO 7% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 STEEP > 7% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TOTAL 11.38 11.38 10.38 21.76 21.76 7.28 4.10 RUNOFF COEFFICIENT SUB BASINS AND / OR BASINS HISTORIC DEVELOPEDOFFSITE OVERALL OVERALL la lb C2-C10 0.21 0.73 0.67 0.43 0.70 0.73 0.73 C100 = 1.25*C2 0.26 0.91 0.84 0.54 0.88 0.91 0.91 C100 IS NEVER GREATER THAN 1.0 PRELIMINARY FLOW SUMMARY FOR MARTINEZ PUD PAGE 1 DESIGN CONTRIBUTING AREA C2 CIO C100 Tc Tc I2 I10 I100 Q2 Q10 Q100 PAGE POINT SUB 2,10 100 BASINS) ac. min. min iph iph iph cfa cfo cfo *rrrrr+rrr+rrrr+rrrrrrr*rrrr r:+r+rrrr *errrrrr****rrrrrrrrrrr**r****+rrrr+:+rrrr*rrrrrrr+r******rrr**** HISTORIC CONDITIONS PARK SITE 11.38 0.21 0.21 0.26 23.00 23.00 1.72 3.02 4.86 4.11 7.22 14.53 3 PARK OVERALL 21.76 0.43 0.43 0.54 36.00 36.00 1.30 2.34 3.77 12.15 21.95 44.14 5 DEVELOPED CONDITIONS PARK SITE 11.38 0.73 0.73 0.91 19.00 19.00 1.91 3.35 5.38 15.75 27.65 55.50 4 PARK OVERALL 21.76 0.70 0.70 0.88 32.00 32.00 1.41 2.51 4.04 21.48 38.27 77.02 6 MINOR BASINS DEVELOPED CONDITIONS A 1a 7.28 0.73 0.73 0.91 19.00 19.00 1.91 3.35 5.38 10.07 17.69 35.51 7 PARK ib 4.10 0.73 0.73 0.91 11.00 11.00 2.46 4.31 6.92 7.32 12.82 25.74 8 u APPENDIX I Storm Drainage Calculations PAGE 6 Project No. 1558-01-97 Preliminary Drainage and Erosion Control Report VI. VARIANCE REQUEST: A. Variance from City of Fort Collins Requirements 1. There will be no requests for any variances from the City of Fort Collins Storm Drainage Criteria for the Martinez P.U.D. VIE. CONCLUSIONS: A. Compliance with Standards 1. All drainage analysis has been performed according to the requirements of the City of Fort Collins Storm Drainage Criteria Manual, City of Fort Collins policy, and the Old Town Master Drainage Basin Plan. 2. All Erosion Control design complies with the City of Fort Collins Erosion Control Reference Manual and generally accepted practices. B. Drainage Concept 1. The drainage design for the Martinez P.U.D. is in accordance with the City of Fort Collins requirements and the recommendations of the Master Drainage Basin Plan for Old Town Basin. 2. There will be no adverse downstream effects due to the development of the site. VIM REFERENCES: 1. Fort Collins Storm Drainage Criteria Manual 2. Urban Drainage and Flood Control District Drainage Criteria Manual 3. Fort Collins Storm Erosion Control Reference Manual 4. Old Town Master Drainage Basin Plan; Resource Consultants & Engineers, Inc.; Dated January 7, 1993 PAGE 5 Project No. 1558-01-97 Preliminary Drainage and Erosion Control Report IV. DRAINAGE FACILITY DESIGN: B. Specific Details 1. Historic and developed peak flows from the site and the overall contributing area to Martinez Park are summarized in the table below. Area Q2 Q100 Description acres C2 C100 cfs cfs Historic Site 11.38 0.21 0.26 4.1 15.5 Developed Site 11.38 0.73 0.91 15.7 55.5 Historic Overall 21.76 0.43 0.54 12.1 44.1 Developed Overall 21.76 0.70 0.88 21.5 77.0 2. Specific details will be submitted with the Final Plans. V. EROSION CONTROL: A. General Concept 1. Erosion control measures will be as identified on the Preliminary Drainage and Erosion Control Plan. 2. An erosion control security deposit is required in accordance with City of Fort Collins policy (Chapter 7, Section C: SECURITY; page 7.23 of the City of Fort Collins Development Manual). In no instance shall the amount of the security be less than $1,000.00. 3. According to current City of Fort Collins policy, the erosion control security deposit is figured based on the larger amount of 1.5 times the estimated cost of installing the approved erosion control measures or 1.5 times the cost to re -vegetate the anticipated area to be disturbed by construction activity. a. The cost to install the proposed erosion control measures is approximately $ 5,025.00. Refer to the cost estimate attached in Appendix H. 1.5 times the cost to install the erosion control measures is $ 7,537.50. b. Based on current data provided by the City of Fort Collins Stormwater Utility, and based on an actual anticipated net affected area which will be disturbed by construction activity (approximately 8.5 acres), we estimate that the cost. to re - vegetate the disturbed area will be $ 4,250.00 ($ 500.00 per acre x 8.5 acres). 1.5 times the cost to re -vegetate the disturbed area is $ 6,375.00. The $ 500.00 per acre for re -seeding sites greater than 10 acres was quoted to us by the City of Fort Collins Stormwater Utility personnel. c. The erosion control deposit for the Martinez P.U.D. will be $ 7,537.50. This deposit is refundable. PAGE 4 Project No. 1558-01-97 Preliminary Drainage and Erosion Control Report M. DRAINAGE AND EROSION CONTROL DESIGN CRITERIA: C. Hydrological Criteria The Rational Method (Q=CIA) was used to determine the pre -developed and/or post development peak flows for the 2, 10 and 100-year storm events at critical points. D. Hydraulic Criteria 1. Storm sewer and drainage channel capacities were based on the Mannings Equation. The Mannings coefficients are as suggested by the City of Fort Collins Storm Drainage Criteria Manual. 1V. DRAINAGE FACILITY DESIGN: A. General Concept 1. Onsite stormwater will have 2 different travel paths. A portion of the site (Minor Basin la) will contribute stormwater to proposed low point located at the proposed access to the park from the entry drive. The remainder of the site (Minor Basin lb) will contribute stormwater directly to Lee Martinez Park. 2. Offsite flows will be conveyed east along the north side of the railroad tracks via an existing swale. Some grading will occur on the south side of the proposed commercial building to better define the swale and convey flows around the building into the parking lot. a. Any grading which occurs within the railroad ROW or easement will require the approval of the railroad and the Public Utility Commission W.U.C.). 3. No detention will be provided for this site because of its proximity to the river and the fact that all stormwater flows into Lee Martinez Park, much of which is within the limits of the 100-year floodplain. 4. The portion of the property east of the entry drive off of Cherry Street will not be affected by this development. It is our understanding that this area may be purchased by the City of Fort Collins Parks and Recreation Department in order to provide additional parking facilities for Lee Martinez Park. a. A concept plan of the proposed improvements are available at the City of Fort Collins Parks and Recreation Department. PAGE 3 Project No. 1558-01-97 Preliminary Drainage and Erosion Control Report III. DRAINAGE AND EROSION CONTROL DESIGN CRITERIA: A. Regulations 1. All storm drainage design criteria from the City of Fort Collins Drainage Criteria Manual was considered. 2. Recommendations made in the Old Town Master Drainage Basin Plan prepared by Resource Consultants & Engineers, Inc. were also considered. 3. All erosion control design criteria from the City of Fort Collins Erosion Control Reference Manual was considered. B. Development Criteria Reference and Constraints 1. All grading design must match the existing elevations at all property lines. 2. Stormwater improvements are proposed with the Old Town Master Drainage Basin Plan for this area. These improvements include a 3'x30' Reinforced Box Culvert to be installed at the intersection Cherry and Mason Streets. a. Stormwater runoff will be conveyed in the box culvert to an open channel through the eastern portion of this site, then to a proposed settling basin north of the site, then to the Cache La Poudre River. b. Refer to figure 8.6 of the Old Town Master Drainage Basin plan attached in Appendix IV. Adequate land area at the eastern portion of the site will have to be provided to facilitate this proposed improvement. c. The proposed entry drive into the site at Cherry Street does not conflict with the. proposed location of the box culvert as shown figure 8.6. 3. There is an existing 48" storm sewer which crosses the property just east of the proposed commercial building. a. The easement is situated in an existing 50' ROW that is recorded in the Latimer County records at Book 446 and Page 338. b. Stormwater improvements proposed with the Old Town Master Drainage Basin Plan indicate that this storm sewer will be daylighted at the proposed settling pond located downstream of the site. c. Refer to figure 8.6 of the Old Town Master Drainage Basin plan attached in Appendix IV. 4. The 100-year flood plain is delineated on the Preliminary Drainage and Erosion Control Plan. The floodplain was taken from Flood Insurance Rate Map (FIRM) Panel 2 of 7; Coinmunity Panel Number 080102 0002 B; map revised February 15, 1984. PAGE 2 Project No. 1558-01-97 Preliminary Drainage and Erosion Control Report H. DRAINAGE BASINS AND SUB -BASINS: A. Major Basin Description 1. The site is situated within the Old Town Drainage Basin as designated on the City of Fort Collins Stormwater Basin Map. a. The drainage fees associated with the Old Town Basin are $4,150.00 per acre. 2. The eastern portion of the site is subject to shallow flooding of less than .1.5 feet in depth according to figure 4 of the Old Town Master Drainage Basin Plan. This area will not be subject to development with this project. 3. No portion of the site is located in the 100-year floodplain. Reference the Flood Insurance Rate Map (FIRM) Panel 2 of 7; Community Panel Number 080102 0002 B; map revised February 15, 1984. Floodplain elevations across the site range from approximately 4966 to 4971 feet from east to west. The lowest elevation across the northern property line of the site range from approximately 4970 to 4987 from east to west. A. Some offsite contribution is expected from the properties to the south. The offsite contributing area is bounded by Sherwood Street on the west and Cherry Street on the south. The offsite contributing area consists of portions of subcatchments 136 and 108 as designated on Figure 4.1 of the Old Town Master Drainage Basin Plan. a. The majority of the offsite stormwater will be conveyed to the east in the existing swale along the north side of the railroad tracks. The stormwater will be conveyed around the proposed commercial building and then north to Martinez Park. 5. The offsite contributing area is approximately 10.38 acres. B. Sub -Basin Description 1. The site slopes to the east and north. Historically stormwater flows overland east to a low point. The low point exists north of the intersection of Cherry and Mason Streets. From the low point, storm water runoff is conveyed into Lee Martinez Park via a natural swale eventually reaching the Cache La Poudre River. a. A 3' x 30' concrete box culvert is proposed with the Old Town Master Drainage Basin Plan to convey stormwater from the southwest corner of Mason and Cherry streets under Cherry Street to the existing swale. The outfall of the box culvert will be located east of the proposed entry drive off Cherry Street. 2. There is an existing Swale along the north side of railroad tracks to the south which conveys offsite water to the east. The water is conveyed north overland into Lee Martinez Park when the defined Swale terminates near the location of the proposed commercial building. PAGE 1 Project No. 1558-01-97 Preliminary Drainage and Erosion Control Report L GENERAL LOCATION AND DESCRIPTION: A. Location 1. Martinez P.U.D. is located in the Northeast One Quarter (1/4) of Section 11, 17N, R69W of the 6th P.M., City of Ft. Collins, County of Larimer, State of Colorado. 2. More specifically, Martinez P.U.D. is located directly south of Lee Martinez Park and north of the railroad tracks located north of Cherry Street near the vicinity of the intersection of Cherry Street and Mason Street. The western end of the site borders on Sherwood Street. The eastern end of the site borders on North College Avenue. (See Vicinity Map). 3. The site is bounded entirely on the north by Lee Martinez Park. It is bounded on the east by College Avenue, on the west by Sherwood Street and on the south by the Burlington Northern railroad property and Cherry Street. 4. The Cache La Poudre River is approximately 600 feet north of the site at its closest point near the eastern end of the site. B. Description of Property 1. The site is directly adjacent to Burlington Northern railroad property and was previously utilized as a railroad switching yard. Historic use of the property can be visualized on the City of Fort Collins aerial photo dated May 8, 1984. 2. The site area is approximately 11.38 acres. 3. Development of the site will consist of a co -housing portion to the west, 10 single family lots, a commercial tract currently planned for a 12,200 SF commercial building, a tract to. the east of the commercial area which may ultimately be purchased by the City of Fort Collins Parks and Recreation Department. The co - housing area will provide 8-4-plex units and a duplex unit. Adequate parking for the co -housing units and the commercial building will be provided. 4. The site is encumbered by several existing utilities. Additional utilities will be installed as needed to service the site. There are two (2) existing City of Fort Collins sanitary sewer lines. There is also an existing North Weld County water transmission line and a 12" City of Fort Collins water line running through the site. 5. Development of the site with this project will be limited to the portion of the property west of the intersection of Cherry and Mason Streets. It is our understanding that the area east of Mason Street (extended) may be purchased by the City of Fort Collins Parks and Recreation Department to allow expanded parking for Lee Martinez Park. 6. There is an existing 48" storm sewer running in a northeasterly direction across the site immediately east of the proposed commercial building. The storm sewer is situated in an existing 50' ROW. No Text Preliminary Drainage and Erosion Control Report for MARTINEZ P.U.D. Fort Collins, Colorado Prepared for: Wonderland Hill Development Company 745 Poplar Avenue Boulder, Colorado 80304 INITIAL, $UBMIWAL dated 2 zA - Prepared by: SHEAR ENGINEERING CORPORATION Project No: 1558-01-97 DATE: January, 1997 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-0311 APPENDIX V Stuffer Envelope Preliminary Drainage and Erosion Control Plan KEY TO MAP SOONear Flood Boundary ZONE B 100-Year Flood Boundary Zone Designations* With Date of Identification e.g., 12/2/74 IOONear Flood Boundary fi.'�j.. ZONEB 500-Year Flood Boundary Base Flood Elevation Line 513 With Elevation In Feet** Base Flood Elevation in Feet (EL 987) Where Uniform Within Zone** Elevation Reference Mark RM7x Zone D Boundary River Mile • M 1.5 **Referenced to the National Geodetic Vertical Datum of 1929 *EXPLANATION OF ZONE DESIGNATIONS ZONE EXPLANATION A Areas of 100-year flood; base flood elevations and flood hazard factors not determined. AO Areas of 100-year shallow flooding where depths are between one (1) and three (3) feet; average depths of inundation are shown, but no flood hazard factors are determined. AH Areas of 100-year shallow flooding where depths are between one (1) and three (3) feet; base flood elevations arc shown, but no flood hazard factors are determined, Al-A30 Areas of 100-year flood; base flood elevations and flood hazard factors determined. A99 Areas of 100-year flood to be protected by flood protection system under construction; base flood elevations and flood hazard factors not determined. B Areas between limits of the 100-year flood and 500- year flood; or certain areas subject to 100-year flood- ing with average depths less than one (1 ) foot or where the contributing drainage area is less than one square mile; or areas protected by levees from the base flood. (Medium shading) C Areas of minimal flooding. (No shading) D Areas of undetermined, but possible, flood hazards. V Areas of 100-year coastal flood with velocity (wave action); base flood elevations and flood hazard factors not determined. V1-V30 Areas of 100-year coastal flood with velocity (wave action); base flood elevations and flood hazard factor; determined. NOTES TO USER Cervin areas not in the special flood hazard areas (zones A and V) may be protected by flood control structures. This map is for flood insurance purposes only; it does not neces- sarily show all areas subject to flooding in the community or all planimetric features outside special flood hazard areas. For adjoining map panels, see separately printed Index To Map Panels. INITIAL IDENTIFICATION: JUNE 28, 1974 FLOOD HAZARD BOUNDARY MAP REVISIONS: LI I NATIONAL FLOOD INSURANCE PROGRAM FIRM FLOOD INSURANCE RATE MAP CITY OF FORT COLLINS, COLORADO LARIMER COUNTY PANEL 2 OF 1 (SEE MAP INDEX FOR PANELS NOT PRINTED) COMMUNITY -PANEL NUMBER 080102 0002 B MAP REVISED, tµ,Y MAN FEBRUARY 15, 1984 Federal Emergency Management Agency 4980 4970 4960 • + m / .1 a Tby ay .L •y�\.fir'' '�i=l tom' ' .t` f "•...: 'Gii �$a NOTE: Replace Anlata With Standard Cure Inlet At New Street Grace Ad Required ----- _--- -- - - :Construct Wetland Areox3.5ac.s, Conat t'Seitlin - Pond"Irea .75ae -Construct 490 L.F. of Graaa Lined Channel Wish DropStructures Sae Construct 3 % 30 Construct 410 ELF of 6rasi Lined. Channel of 0.5° See � Construct 4 X20 j 600 L.F. otCan _ '. See Detail - Detail 5, Figure 41 and Bo* 'Culvert Detail6, Flqure 4J„__.��—' CLlrert u -----pi73 Detail 9L. Ft9vre 42 ,. _-_.. pproa 100r�.� t 9 •— . s ' 100rr. WS E PaudrR. 41 Cb,' `• i� V Appros. W.S.E Old Torn e Drop Structure n y E a See Detail I, _ Figure 9 Drop Structure See Detail I, V g 8 S. sheer !o i Kl r a W 0.00 2.00 4.00 6.00 8-00 10.00 12.00 14.00 16-00 1111•00 z0.0u LW 1f� t c c f' L J � n o e V c m = ` e m G m As .a t r „ \ i \ PENN : � r ; e ♦ 1 i t m C G LLE {- HmYw 9 zo wwm NnTM wV ZZ�y y� ei 2 yg mNOr.'12 rats -channel a' 0.5% i ura 41 Reconstruct LePurte'Arenue ;See Detail 2 Figure 4 y6 ZW W tg..O f 2 m u, `. O O O 2 z2z f� 0 v.-�w z in W 0 - �_.. .... ._ _.._ W o S 0toL) CO Mx 0 a c7 0 e Q U- W W cc O ti U) ." W ° U cc o_ 22.00 24-00 26.00 28-00 Figure 51: REACH DESIGNATION for FLOODED AREA MAPPING OLD TOWN MASTER DRAINAGE BASIN PLAN for the A CITY of FORT COLLINS =`- Legend: FLOODED AREAS MAPPED WITH DETAILED MAPPING APPROXIMATE LIMITS of POTENTIAL SHALLOW FLOODING LESS THAN 1.5' IN DEPTH 2�� 500 71.77 111111 '\JZV 0 Scale i201F.t "M;;1 !e 55113;li LIE w