Loading...
HomeMy WebLinkAboutMARTINEZ PUD - PRELIMINARY - 4-97 - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTS'Vj Qt) w-n U l -kW--2 trteQ� C1 Li in k 111 �.,,.,. y V NEIGHBORHOOD INFORMATION MEETING Written n No ification of this meeting? ARecelVe ddress' Name Address Zip Yes No Yes No 1 �0 591 DL '90 1 � L �k{nih bvt �� VA' naafi P� NMI NEIGHBORHOOD INFORMATION MEETING Written noNotificatio❑ eceive of this meeting? Correct dds ss? Name -- Address --- — ZIP Yes No Yes No �Amly-nweer osa i Chios Majuonado </la N. G Artc&m 6 St 90;3 76 ✓ L,r1 kh(.PeA. Y701 c4rrele4a) L'j S054016 N M Ic S i E Z E K v,,b N. uN17C0r.g SOS21 U i IA -1 lZ caV.orL S•, • 40S a.,l ✓ ✓ �poyt Flick800 woodlAvid wav go-s-Q6N A 3t'11 NFL Af 6R.s 1� all� ba ba Hellll-W6 rc St Hfl1ZLflN k� GALAS 601-1 Sycw'ORE S-r 13tu, Re% 404 0. SHEPwoCD 5T• BP5z.( ✓ ✓ �-- A�r� �- 5Zo S 805Z A. �aty- 14014 W. RRw R.b• uVES o„ Sbs u A b Z vh�er,r .3st Al k&& iJ Ave rrl ZS OSL ✓ r 14. Question: How will the co -housing residents deal with the softball lights? Answer: There is a concern; however, there is new lighting technology that could help mitigate the lighting. Noise from the ballfields is also a concern. These issues have influenced the layout and design of the project. 15. Question: How do you recruit residents for your co -housing community? Answer: We do not want to emphasize a single race or ethnic community. We would like a diverse group. The homes will range from $100,000 to $200,000 so the economics will play a role in the diversity. 5. Comment: The biggest concern is where we're going to put the tree limb chipper (during our annual Spring cleanup) when this project is built (this comment drew a big laugh from the "crowd"). 6. Question: What is going to happen during the construction phase of this development, in terms of keeping construction traffic out of our neighborhood? Answer: We will do whatever we can to ensure that the construction traffic will be minimized in your neighborhood. 7. Question: Could the City, as a partner in the development, facilitate better sidewalk connections along the west side of North Sherwood Street for improved pedestrian access to the park? Answer: That is something that can be discussed. 8. Question: The City is doing a Phase I (contamination) study for the entire site, and not only for what they are acquiring? Answer: Yes, that is correct. 9. Comment: The co -housing group has been very concerned about how much traffic is going to occur in this area and they do want to maximize the bicycle/pedestrian emphasis in this project. 10. Comment: It may be beneficial to have the existing Greyrock Community co - housing representatives (in Fort Collins) talk to this group about their process, conflicts, and compromises. 11. Comment: We have concerns about noise generated during construction, such as loud radios, etc. 12. Question: What construction company, builder will you be using? Answer: Probably Dennis Sovick, who is a local builder in Fort Collins. 13. Question: Is this project in a flood -prone zone? Answer: No, it is not. Commu.aty Planning and Environmental _.-rvices Current Planning City of Fort Collins PROJECT: DATE: APPLICANT: CONSULTANT: STAFF: NEIGHBORHOOD MEETING MINUTES Martinez PUD April 21,1997 Wonderland Hill Development Mikal Torgerson, Architect Steve Olt City Planner The proposed development plan is for 10 single family residential lots, each with a loft apartment above a detached garage, 34 co -housing residential units, and a mixed commercial/residential building on approximately 11 acres located south of and adjacent to Lee Martinez Park. 1. Comment: There is a contamination area possible on this site that may require some sort of cleanup action. 2. Comment: There is a foundation for an old railroad roundhouse that may require some form of preservation action. 3. Question: What was the notification area used for this meeting? I'm not sure that it has been extensive enough. Answer: The notification area, by City Code, had to be a minimum of 500 feet in all directions from the proposed project. The applicant provided the City with the list of affected property owners. Also, there was an article in the neighborhood newsletter notifying all the residents of this meeting. 4. Question: When do you anticipate breaking ground for this project? Answer: Optimistically, sometime this year. We would like to potentially occupy some of the units early next year. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020 Criterion i -Ifit an be demonstrated that the project will reduce non-renewable energy usage either through the application of alfanative energy. aystrnned n or through commi'eaergy aoasrrvation beyond those beyothose normally required by City Code, a 5-K bonus may be earned for every 5 h reduction in energy use. IIl Calculate a 1% bonus for every 50 acres included in the project Il Cakvlate the PCV ntage of the total acres in the project that are &voted to recreational use. Finer !S of that percerdsge as a bonus ' O If the applicant oommits to preserving permannent off-aite open space that meets the City's minimum requirements, calculate the peroectage of this open space acreage to the total development acreage and enter thus percentage as a barns Ifpart of the total development budget is to be spent on neighborhood public transit facilities which are not required by City Code, P enter a 2% bonus for every S 100 per dwelling unit invested Ifpart ofthe taunt dcselopmat budgd is to be spent on neighborhood facilities and services which are not otherwise required by City. q _ Code, eater a I h bonus for every S 100 per dwelling unit invested. Ifthe project oodaias dwelling units set aside for individuals earning g0°h or less of the median income of City residents, as adjusted i, for family size, and paying less than 30°h of their gross income for housin& including utilities (Affordable Dwelling Units h calculate the percentage of Affordable Dwelling Units to the total number of dwelling units in the project and enter that percentage as a borers, up to a maxiaium of 15% (Ifthe project is proposed to be constructed in multiple phases the Affordable Dwelling Units: must be constructed as a part of the phase for which approval is soughL) In order to insure that the Affordable Dwelling Units remain affordable for a period ofnot less than 25 years, the developer shall record such protective covenants as may be required by the City under Sec. 29-526(Jx4} Ifs eo®itment is being made to develop a specified percentage of the total number of dwelling units for Type "A" and Type "B" handicspped lousing as defined by the City of Fort Collirq calculate the bonus as follows: S Type "A" .5 x Type "A" Units Total Units In no case shall the combined bonus be greater than 30°h Type "B" . 1.0 x Type "B" Units Total Units If the site or adjacent property containsa historic building or place, a bonus may be carved for the following t 3% For preventing or mitigating outside influences adverse to its prnavation (e.g.. environmental, land use, aesthetiq economic and social factors} 3% For assaing that new Stawtrros will be in keeping with the character of the building or place, while avoiding total traits' 3% For proposing adaptive use of the building or place that will lead to its continuance, preservation and improvement in an appropriate manner Ifs portion or all ofthe roguced parking in the multiple family project is provided underground, within the building or in an elevated u parking structure as an Acc ssory use to the primary strtucftue, a bonus may be earned as follows: 94/, For providing 75% or more of the parking in a Structure;6% For providing 50 - 74%of the parking in a strudnro; 3% For providing 25 - 49%ofthe parking in a structure. VIfs commit era is being made to provide approved automatic fire extinguishing systems for the dwelling units, eater a bonus of 10°h If the applicant commits to providing adequate, safe AM convenient pedestrian and bicycle connections between the project and any W of the destination points described below, calculate the bonus as follows: S°h For erecting to the ncassst adding City sidewalk and bicycle pa lvlaw,, °h For wmcding to any existing public stool, park and transit stop within the distance as defined in this Density Chart;. r 5% For correcting to an existing City bicycle trail which is adiace t to or traverses the rrniect ` D TOTAL I I I 0 • . � .......... ....... ..:.. : ..„„...: R'..: :;.:::: i.: :::`£FSiYrr''.i:[.i^: :::°'::: `: r �::i`G``r:i2 iY"•.C.i`v ..: :. ..:.:.v.::::.:'co: i:;. YY:.i.:.:. i♦ ::ice:.:.:. Y:.:�i::;(:::' :- :;. i G:Y V:..3:,: .: :Y::. .. .: ...... ......... ........ n. ........... .YYY'. is ice... ......... .. ........ ..... .. .: .. , i::h+yYi:: {.vyC•.i%' Maximum Cnlenm Credit . Credit 2000 fed ofan chastuhg neighborhood service center, or a neighborhood service out" to be constructed as a part d ofdwpmjocL (If the project is proposed to be constructed in multiple phases, such neighborhood semi Deafer must be constructed as a part of the phsse for which approval is sought) - 650 fed of an shorting tramh stop (applicable only to projects having a density of at least six [6) dwelling units ' 2004LP . per acre on a gross acreage basis) 4000 feet of an ehoriing commmityhegional shopping neater, cc a comahamityegioml shopping center to be Joe/s > > C constructed as a part of the project (If the project is proposed to be constructed in multiple phase; such ` D communityhegional'shopping center mud be coosmLoted as a part of the phase for which approval is sought) 3500 fed ofan aosuhg neig hborbood croormuurty park. or a ooamwaity facility (EXCEPT GOLF COURSES? or 20^. . �. d 3500 fed of a publicly owned, but net developed, aeighborbcod. or communitypark, or community facility 10°.ti (EXCEPT GOLF COURSES) or -------------------------------------------------------- 3500 fed of a publicly owned golf course; whether developed or not IOOA ' e 2300 fed of an existing school, meeting all requirements of the State of Colorado con'Pul. education laws I OSG " f 3000 fed of an coming major employment center, or a major employment center to be constructed as, a part of 20% ' the project. (Ifthe project is proposed to be constructed in multiple phase; such major employment aver mud be constructed as a part of the phase for which approval is sought) No building, oboe or business perk,. or n n &hopping center which has served as the basis for the cbtiming'of credit- any other "base" criteria, of this Density Chad can also be used as the basis for claiming credit under this criterion. g 1000 feet of an existing child care center, or a child care center to be constructed as a pad of the prcjecL (If the 5% project is prnpcwd to be constructed in multiple phases; such child taro caner mum be constructed as a pad of the --•,I phase for which approvals sought)' 1 tl "North Fort Collins" 20"ti I The Central Btuineas District . 20eA A project whose boundary is contiguous to e)dsting urban development Credit may be earned as follows: 30% . . .. 0aA For projects whose property boundary has 0 - 10% contiguity, . 10 - I S% For projects whose property boundary has 10 - 20s/• contiguity, 1 S - 20% For projects whose property boundary has 20 - 30s/. contiguity; 20 - 25% For projects whose property boundary has 30 - 400A oariiguity,. . 23 - 30 A For projects whose property boundary has 40 - 50-A contiguity.. . Ifthe project contains dwelling units ad aside for individuals earning 80s/o or less of the median income of City 15% residents, as adjusted for family size, sod paying leas than 30°/. of their gross income for housing, including k utHitie ("A adabic Dwdling Unbz"I mlarlme the pacrntage of Affoordable Dwelling units to the tetra! number ofdwelling units in the project and rater that percentage, up to a maximum of 150A (If the project is proposed to be constructed in multiple phases, the Affordable Dwelling Units must be constructed as a pail of the phase for which approval. is sought) In order to inswe that the Affordable Dwelling Units remain affordable for a period trot less than 25 ytw-3, the desrlopershall record such protective covenants as maybe required by the City under ?r2»» Seo. 29 526(JX4} r EFMTION: All residential uses: Uses would include single family attached dwellings, townhomesjnon-profit mobile homes, and multiple family dwellings; group. homes; boarding and roomi fraternity and sorority houses;. nursing homes; public and private schools; public andquasi-public, recreational uses as a principal use; uses providing meeting places and public assembly with incidental office space; and child care centers. CRITERIA: The following applicable criteria must be answered "yes" and implemented within the development plan. Yes No N/A 1. DOES THE PROJECT EARN THE MINIMUM PERCENTAGE POINTS AS CALCULATED ON THE FOLLOWING "DENSITY CHART H" FOR -THE PROPOSED DENSITY OF THE RESIDENTIAL PROJECT? The required earned credit for a residential project shall be based on the following: 60 percentage points = 6 or fewer dwelling units per acre 60 - 70 Rercentage points = 6-7 dwelling units per acre 70 - 80 percentage points = 7-8 dwelling units per. 80 = 90 percentage points = 8-9 dwelling units per acre 6 90 -100 percentage points = 9-10 dwelling units per acre 10.0 or more percentage points = 10 or more dwelling units per acre 2. DOES THE PROJECT EARN AT LEAST 40 Yes No N/A PERCENTAGE POINTS AS CALCULATED ON THE FOLLOWING "DENSITY CHART H" FROM BASE POINTS? . Land Development GuidanceSystem for Planned Unit Developments.. The City of Fort Collins, Colorado. .Revised as per Ordinance No. 2, 1996. BUSINESS SERVICE USES POINT CHAflE For All Criteria Applicable Criteri the I II IIICriterion Applicae circle Mumplier Poithe EarnYes No Correct score Ix a. Transit Route X 2 0 2 — b. South College Corridor X X 2 0 4 8 c. Part of Center X X 2 0 3 O 6 d. Two Acres or More X X 2 0 3 (0 6 e. Mixed -Use X X 2 0 3 6 f. Joint Parking 1 2 0 3 g. Energy Conservation X 1 2131410 2 g h. Contiguity X X 2 0 5 l 10 i. Historic Preservation 1 2 0 2 j' 1 2 0 k. 1 2 0 I. 1 2 101 Totals C7 D v A Percentage Earned of Maximum Applicable Points V/VI = VII 12, % vu Land Development Guidance System for Planned Unit Developments The City of Fort Collins, Colorado, Revised March 1994 -73- Business Service Uses (continued) h. Is the project located with at least one -sixth (1/6) of its property boundary contiguous to existing urban development? i. If the site contains a building or place in which a historic event occurred, has special public value because of notable architecture, or is of cultural significance, does the project of lfM the following criteria? 1. Prevent creation of influences adverse to its preservation; 2. Assure that new structures and rues will be in keeping with the character of the building or place. Imitation of period styles should be avoided; and 3. Propose adaptive use of the building or place that will lead to its continuance, conservation, and improvement in an appropriate manner while respecting the integrity of the neighborhood. Land Development Guidance System for Planned Unit Developments The City of Fort Collins, Colorado, Revised March 1994 -72- ACTIVITY: Business Service Uses E DEFINITION: Those activities which are predominantly retail, office, and services uses which would not qualify as a neighborhood service, neighborhood convenience, or community/regional shopping center. Uses include retail shops; offices; personal service shops; financial institutions; hotels/motels; medical clinics; health clubs; membership clubs; standard and fast-food restaurants; hospi�=s', mortuaries; indoor theaters; recreation uses; small animal veterinary clinics; printing and newspaper offices; and, other uses which are of the same general character. CRITERIA: Each of the following applicable criteria must be answered "yes" and implemented within the development plan. Yes No N/A 1. Does the project gain its primary vehicular access from a stree[ other than South College avenue? 2. DOES THE PROJECT EARN AT LEAST FIFTY (50%) PERCENT OF THE MAXIMUM POINTS AS CALCULATED ON POL NT CHART "B" FOR THE FOLLOWING CRITERIA? a. Is the activity contiguous to an existing transit route (not applicable for uses of less than twenty-five thousand (25,000] square feet GLA or with less than twenty-five (25] employees, or located in the Central Business District)? b. Is the project located outside of the "South College Avenue Corridor"? c. Is the project contiguous to and functionally apart of a neighborhood or community/regional shopping center, an office or industrial park, located in the Central Business District, or in the case of a single user, employ or will employ a total of more than one hundred (100) full-time employees during a single eight (8) hour shift? d. Is the project on at least two (2) acres of land, or located in the Central Business District? e. Does the project contain two (2) or more significant uses (for instance retail, office, residential, hotel/motel, or recreation)? f. Is there direct vehicular and pedestrian access between on -site parking areas and adjacent existing or future off -site parking areas which contain more than ten (10) spaces? g. Does the activity reduce non-renewable energy usage through the application of alternative energy systems or through energy conservation measures beyond those normally. required by the Model Energy Code as adopted by the City? Refer to Appendix "E" for energy conservation methods to use for calculating energy conservation points. Land uevelopment Guidance System for Planned Unit Developments The City of Fort Collins, Colorado, Revised March 1994 -71- Activity A: ALL DEVELOPMENT CRITERIA Al I rRITPRIA I A.1. COMMUNITY-l•VIDE CRITERIA -- - • _...,siVNLY s :he c:renonHssatisrje,07 acplicacle7CRITcR10N aIf nc, please explain 1.1 Solar Onentation I D< I I I ➢< . I 1.2 Comprehensive Plan 1.3 Wildlife Habitat I I I 1.id Mineral Deposit I I ICI 1.z. 1.6 E-coiccic2lly Ser.sitive Areas L_nds cr Acricultural Inoorance I ?served I I 1.7 Enercv Conservation ID< I I DC I I 1.8 . Air Quality I XI I I DC I 1.S Wcrar Q'uallt`/ x I I 10 a=-w2ce anc Wastes I ! I I X I I. 1 11 kN=te!-QonservP4tin V I I x 1.12 Residential Density I I I I I I A. 2. NE!GHEORHOOD CCMP.�TIE ILF, Y CRITIER 1IA I 2. i V_hic::iar. Ped=_stnan. Bike Transccration 19 I I I I I - 2 ?uiidine P!ac=mant and Orient=tics x I I X I I 2 Natural Features I p<I I I ➢C I = vantcular Circuiaticn anc Parking IX I I x I I' 2.d E.nerge^cy Accass IVG i r 2. r-edestrian Circulation I DCI I I p( I I 2. ; lrnitec.ura _ I I I I 'J< I I ..doing !ne!cnt and Views I I IPCI I I IS . Shading IpCI I I'� I 2.10 Solar Accass I DC I l I)< 2.1 i Historic RescurCes I I ( I I 2.12 Set"acks I 2.13 L =_ndscace i xl I I><I I 2.1 ; Sicns V<I I I I i 2.1� Siia Lighting I I 2.16 Noise and Vibration 2.17 '!are or Heat I DCI I I 2.18 Hazardous Materials A 3. ENGINEERING CRITERIA 3.1 Utility Capacity DPI 3.2 Design Standards I I I I I 3.3 Water Hazards 3.4 Geologic Hai=_rds I i Land Development Guidance System for Planned Unit Developments The City of Fort Collins, Colorado. Revised . 5 1994 � U4� -61- WONDERLAND PROPOSED VISION STATEMENT FOR MARTINEZ PARK COHOUSING COMMUNITY Our vision for the Martinez Park CoHousing community includes the following elements: 1..An affordable community that offers an efficient and rewarding lifestyle to an economically diverse group of households. 2. A community that demonstrates a high level of environmental responsibility and sustainability in practical and efficient ways. 3. A community that provides a safe and nurturing environment for children growing up and for seniors to practicing eldering and that includes a diverse mix of household types ranging from traditional young families and singles to seniors. 4. A community that will provide a positive influence in the stewardship of the Lee Martinez Park and the Martinez Park neighborhood to help improve the quality of the neighborhood. 5. A community that is planned to take advantage of practical and affordable technological innovation to provide for progressive communication networking that will foster educational and work -live opportunities. (This preliminary vision statement has been prepared by Wonderland based on the specific site and location characteristics and Wonderland's experience with other CoHousing communities. We anticipate that once a communityfor the Martinez Park CoHousing site has formed, the community will ratify and/or modify this vision through their group process) Wonderland Hill Development Company 745 Poplar Avenue, Boulder, Colorado 80304 r3n31 a49-3939 FnY. r3n31 4a9.397.9; D. Rationale for Choices made by Applicant The plan for the Martinez PUD has been based on significant neighborhood input in an effort to provide a development that is economically viable but also contributes the least negative impact to the surrounding Martinez Park residential neighborhood and has the greatest potential to positively influence the neighborhood and the City. E. Point Charts See enclosed Point Chart. F. Potential Conflicts between Land Uses Conflicts between residential and commercial land uses have been significantly mitigated by placing the commercial portion of the development to the east where it has easy access to the downtown area without driving through the residential portion of the site or the adjacent residential Martinez Park neighborhood. G. Energy Conservation Wonderland Hill Development Company has a long-standing reputation for building exemplary energy conservation developments. See materials enclosed. Also see completed Energy Conservation Worksheet enclosed. Buildings in the project will be built to standards that will generate 3 points under Method Two of the City's Energy Point System, 5. DEVELOPMENT PHASING SCHEDULE The PUD is being submitted as a one phase development. It is anticipated that construction will begin on the residential portions of this site soon after approvals are obtained by late 1997. The construction on the commercial portion will begin within 2 years of approval. All construction will be completed on the site within 3 years of approval of the PUD. nm✓cona„smg/k.doc 01/15/97 a The work -live opportunity will be enhanced through the use of state -of the art wiring for electronic communication technology, including the potential for shared networking of computers as well as the sharing of other office equipment. 5. Landscaping for a Pedestrian Friendly Environment. Street trees will be provided along the private drive as well as in the private open spaces. Arbors and other entry features will be used at entry points into the CoHousing community. An attractive entry feature and plaza will be provided at the east entry point to the site where it connects to the downtown commercial area. 6. More Sustainable Lifestyle The Martinez PUD will offer and encourage a lifestyle that is much less auto -dependent due to the development's convenient location near both downtown shopping and service opportunities as well as near the recreation facilities offered by the adjacent park. The need for automobile use by residents will be significantly reduced, enabling some residents to live auto -free if they so desire. In addition, the CoHousing community will likely take a proactive position encouraging a more sustainable lifestyle for both its residents and others in the neighborhood. B. Ownership of Public and Private Open Space Areas The eastern portion of the PUD will be sold to the City of Fort Collins as an addition to Lee Martinez Park. Other open space areas as well as drives and parking will be owned and maintained by owners' associations. The drive through the PUD will be owned and maintained by a master association consisting of all properties within the PUD. It is anticipated that the open space and parking areas for the CoHousing community will be owned and maintained by that community's homeowners association. The open space areas on the single family lots will be maintained by private owners of those homes. The parking and plaza area surrounding the commercial building will be owned and maintained by the owners of that building with an agreement to share parking and maintenance of the parking with the City Parks Department. C. Employees At this time we would estimate that the commercial portion of the site will provide employment for between 10 and 20 employees who live off -site. In addition, there will be significant employment opportunities for many individuals living within the PUD. vm✓cohousn%tmuVwk.doc _ 01/15/97 3 MARTINEZ PARK PLANNED UNIT DEVELOPMENT 4. Statement of Planning Objectives A. Appropriate City Land Use Policies Achieved by the Proposed Plan The Martinez PUD will provide the following elements which are consistent with the City of Fort Collins Land Use Policies: 1. Diverse housing The project will include a diversity of both housing types and prices. Homes will range from small I or 2 bedroom attached units priced under $100,000 to single family detached homes with prices which will likely range to over $200,000, as well as work -live loft condominiums over commercial space. 2. Energy conserving and solar access. The site plan allows for nearly all the units to have good solar access. In addition, Wonderland will commit that all housing units will be built to comply with the State of Colorado E-Star Program as well as the Metropolitan Denver Home Builders Association Green Builder Program 3. Pedestrian -friendly environment. The Martinez PUD has been designed to emphasize a pedestrian environment. The interior of the CoHousing portion of the site will be entirely auto -free, providing a safe area for small children. Pedestrian access is provided through the site from east to west. Parking for the commercial development on the east portion of the site has been concentrated in a large lot at the east entrance of the site, allowing easy auto access to the commercial area and additional parking for Lee Martinez Park without have the traffic go through the existing Martinez Park neighborhood or the residential portion of the proposed PUD. In addition, the private street that provides auto access through the residential portion of the site is purposely made as narrow as possible to calm traffic. Appropriate signage will also be added to encourage traffic speeds below 20 miles per hour within the residential portion of the site. 4. Mixed Use The PUD will provide for a mixture of residential and neighborhood oriented commercial as well as work -live facilities. A variety of attractive work -live opportunities will be offered within the PUD, ranging from loft condominiums above the commercial space at the east end of the site, potential home offices over garages for carriage homes in the single family area, and home offices and shared office space in the common house of the CoHousing. mm/cohousing/vwtp=k.doc 01/15/97 2 SCHOOL PROJECTIONS Proposal: #4-97 Martinez P.U.D.: Preliminary Description: Mixed -use development to include 10 single family residential lots with 9 apartments above the garages, 33 multi -family units, and 11 residential units on the second floor of the commercial use on 9.046 acres.. Density: 6.96 du/ac General Population: 10 (single family units) x 3.35*(persons/unit) = 34 9 (single family units) x 2.00#(persons/unit) = 18 33 (multi -family units) x 2.71^(persons/unit) = .89 11(multi-family units) x 3.35%(persons/unit) = 37 TOTAL =178 School Age Population: Elementary: 19 (units) x .396 (pupils/unit) = 8 44 (units) x .104 (pupils/unit)= 5 Junior High: 19 (units) x .185 (pupils/unit)= 4 44 (units) x .050 (pupils/unit)= 3 Senior High: 19 (units) x .166 (pupils/unit)= 3 44 (units) x .046 (pupils/unit)= 2 TOTAL = 25 *Figures are calculated on 3 bedroom single family residential units. #Figures are calculated on 1 bedroom single family residential units. "Figures are calculated on 1,2 and 3 bedroom multi -family residential units. %Figures are calculated on 3 bedroom multi -family residential units. 0717M lmmmwm� _7F Ll Ail ; - 4111161111 -A Ull" _; 7-lt� SYi Vf •'P SYCAMORE STREET 0 \ LANDSCAPE DESCRIPTION_ PLANT NOTES PLANT KEY f _ M •nrpCYV <O�R.w n.Yr[C Y r'k� w•W .t.Yr n.1lw. sww. Y [[ .[[/ ar.Z [M uu 'i MYNrN YieMY.r.9 �r.YR. Onm 'fY W nYY MK•Y1'W VWYY �.OY4l .y1WYM YM1l r MYy r[[ VY.0 b.Y x —` 4 ry: - J. ry.Yl.NeMs.wO - •• AM r.ru.C. t04r.YlM NJt.J'MG[.4 1 M YIY RF r11Y.9Y N•iYYr y �—'�Y.r. ].0 •/Y eKY Fw•R'YOM6•Ytirauo[.•L 4.•V .K..W ..l+lw YM.e.'•[n.YY.4RtrND i4 Y'r".PiO M M Wr. M..r. P-Crw. V.e�VpS'eSi snraYY. '-i O �• - i � _ . 4Y YM YfP •Krt.Yrmw�...Y ro.s.s.ros s sw. . a°wrmer.e[w.r.w • \ s. v. YY.. b Y..,.r.r.c s..+oe.uro i �. Y-w./4L T_ Te'A M Ef Ar...p [Yer M CT y� _ wf =rti: w P.Vel.r� eM. _+YYY Y nrw W rW ��. LIYp 14m w TOrd w M 1LC fYVrp. TYu.�l ^ YC YLL�••. a � .\�_ ' :ANrF•YU MTVUS nC 1w LEE MARTINEZ PARK�..o Wr. �.oarra a Y�.aM.a.Y...re w r.r � � �` \�0 I..IEY'MiY>M YL i. �Qq1� 9M.6I4rT+••wilMM!! .ors•.o.c..r.rou[.Yr.../,.-rr...... LpI.rL� '+V / .. n'D/�� irrl.l � � W f0 � Yam•.. YP w�WWrywC r-Y• ti w•K YITJ F CHERRY STHttI YY..r✓ -- -- - - — W O Q 2 0 ���� j �p o0 3 a Wcc m of O rn W Martinez P.U.D. Preliminary Landscape Plan Ft. Collins* Colorado o AN u.i &IIE■11■4YA O mom YIL■IYAIIP man oww o ❑❑❑❑ 0 �❑ o o I �u� G 1 sari i s VnEedPEll Y ICI '. C611<Y�YG SliiF 11BW11gS � 9WaF FBPll'U lfl1S WIfdC �BWff�ii''; E@��C Pkie[IN3,` 6nNnF�`. LOMN�W MO®ItlE AIE TINII1gE rr • I� �/ i f/µ / r <ts ■Er eN�u�r o/ . w a rYr/.Ywrr rar/IMP is � era// r � . r Yr YN .�� - __ rSn 1 . r � srr.;.r'r�Y - _ -r —•- r��a—-(�NTu/�• r � � a _.Y - er - /r.r .N wAr . • wsr 'I..r'waee _ • o __ w e er Y/p 0 � / _ YI pr __ eNY/ YN �N�Y r Y_r_50. / _• =r YM Niw YYrw M� ^ww Irs =Y irr. Nr �� .�rar rlr • Y • 0. r r W pW Nrr �W WW S•W Y= r rw M _ Y-I Y Y Y WYWYw IrY Y YYrY •\ .YY /•N. lot 1. 1YYrY •YYwYtl � �� Y. P� •� rrr r rr� rN rr/ ..N Nw rN I W-N /v-YN � /r.Yr /Nr.uN � W r s rrr a rr YYN arr �•. rYw -_rY•N. a s Y .ur•Y w YN W rWYlw IYP a rwrW nvrn• ^� �Y ^••^•• Y0 Mw nY rR rR r! YYg orW ^rW /rY YIP Arr. �rY RwrW nrnrr ary �� rY mWrr m BOUligil TO MBWiWIEi PBec "B" PdKFI'd" YrY .4.R11O m �rY R Y T •N Y � • • Y. _ _YN ._ MwrW ^I1 •jr/CY YrI TY IO rY NW WYr IYM YN i/ WYs N�1 ^r .ry�ryyY 4YN��YII �Y YwlllLl li\ l r u r rf rrr /tl WYl rIN rIW �rY o•Y r u � rf rr q�[Q[ �r.o • • Y WIYr .IIrR W IINrrr YIIYY /'Y • • i .YrIYY .ifN -. Y I• • Y Y • /N.ww - /NrAN 1YW➢r YYrr.1N rw rw r� NY rw rN �rr•aw iNrao f rr rrr� • rY N� . E IM Ff.0 .�E= Ci1■1■�=_ �11 Jmr�� 0 511, 0 N"A I °�_IIII■=_■ n=_=_ _■ illy.! 21 1-`111 N i r,I lMEIIIIIIII r ILI!4'J111111'_ €!■ Gi 1 r ...i........■ _: Martinez PUD, Preliminary, #4-97 April 28, 1997 P & Z Meeting Page 5 FINDINGS OF FACT/CONCLUSIONS: In evaluating the request for the Martinez PUD, Preliminary, staff makes the following Findings of Fact: It scores 72% on the Business Service Uses Point Chart (exceeding the minimum 50% required) of the Land Development Guidance System LD S . It scores 110% on the Residential Uses Density Chart (exceeding the minimum 80% required to support the proposed density of 7.39 dwelling units /acre) of the LDGS. It meets the applicable all Development Criteria of the LDGS. It is located on a site that is excluded from the Residential Neighborhood Sign District. All signage will be regulated by the Fort Collins Sign Code that is administered by the Zoning Department. RECOMMENDATION: Staff recommends approval of the Martinez PUD, Preliminary - #4-97. Martinez PUD, Preliminary, #4-97 April 28, 1997 P & Z Meeting Page 4 Parking: The commercial/residential building at the east end of the project will provide for 70 parking spaces in one parking lot between the building and the entry into the development from Cherry Street. Each single family residence will have a detached two -car garage on the lot and there will be additional parallel parking spaces on the south side of the private drive adjacent to the lots. The co -housing area is providing two separate parking lots, one at each end of the co - housing area, with a total of 55 spaces in these two lots. There will be additional parallel parking spaces on the south side of the private drive adjacent to this area. Signage: The property is located on a site that is excluded from the Residential Neighborhood Sign District. All signage will be regulated by the Fort Collins Sign Code that is administered by the Zoning Department. 4. Neighborhood Compatibility: A neighborhood information meeting was held on April 21, 1997 at the Farm at Lee Martinez Park, with approximately 26 affected property owners and neighbors present. The neighborhood, being the impetus and designers of this development proposal, is generally supportive of the project. The primary concern expressed dealt with how the construction traffic will be handled during that phase of the project. A copy of the minutes from the neighborhood meeting is attached to this staff report. 5. Transportation: This development will be accessed by a public street from Cherry Street that ends at a roundabout just north of the commercial/residential building and parking lot. The roadway will turn into a private drive west of the roundabout. This drive will continue along the south side of the single family lots and the co -housing area, eventually connecting into North Sherwood Street just south of the entrance into Lee Martinez Park. 6. Height Analysis: The single family and co -housing residential units will be 1- and 2-story structures and, generally, will not exceed 30' in height. The commercial/residential building will be 3 stories but will not exceed 40' in height. Martinez PUD, Preliminary, #4-97 April 28, 1997 P & Z Meeting Page 3 The request scores 110% on the Residential Uses Density Chart (exceeding the minimum 80% required to support the proposed density of 7.39 dwelling units /acre), earning points for: Base Points (minimum of 40% required) a) being within 4,000 feet of an existing community/regional shopping center (downtown Fort Collins) .......................................... 10 points b) being within 3,500 feet of an existing community park (Lee Martinez Park)................................................................................... 20 points c) being within 3,000 feet of an existing major employment center (City of Fort Collins - City Hall, 281 North College Avenue, Wood Street Service Center).................................................................. 20 points d) being in "North Fort Collins" ............................................... 20 points e) its outside boundary having at least 50% contiguity to existing urban development...................................................................... 30 points 100 points Bonus Points f) provisions for adequate, safe and convenient pedestrian and bicycle connections to the nearest existing City sidewalk and bicycle lane, and connections to an existing City bicycle/pedestrian trail adjacent to the project..................................................................... 10 points Total % Points Earned .......... 110 points 3. Design: Architecture: The architectural styles to be used for the single family residential, co -housing residential, and commercial/residential buildings will reflect the older character of the surrounding residential and commercial neighborhoods. They will present a more front porch -based, pedestrian oriented concept that is typically seen in "neo-traditional' neighborhoods. Landscaping: The landscaping will consist of deciduous, ornamental, and evergreen trees, a mix of deciduous and evergreen shrubs, and a variety of ground covers and flowers (both annuals and perennials). There will be an emphasis on the landscape buffers between this residential community and the park to the north, and to the railroad tracks to the south. Earthen berming will be provided between the private drive along the south property line and the railroad tracks. Martinez PUD, Preliminary, #4-97 April 28, 1997 P & Z Meeting Page 2 COMMENTS: 1. Background: The surrounding zoning and land uses are as follows: N: POL; existing community park (Lee Martinez Park) S: NCM, NCB, D; existing single family residential and commercial E: POL, CCR; existing commercial (North College Avenue business district) W: LMN, NCM, NCB; existing single family residential The property is part of the Original City of Fort Collins; therefore, annexation has never been necessary. The property is part of the Original Town Site that was platted in January, 1873. This area of the town site was platted as several large blocks. 2. Land Use: This is a request for preliminary planned unit development (PUD) approval for a mixed use development consisting of 10 single family residential lots (each with a second dwelling unit above a detached garage), 34 co -housing (multi -family) dwelling units, a 36,000 square foot retail/office/retail building (with 11 residential dwelling units on the second and third floors), and two parcels of land (totaling 2.46 acres) that will become part of the existing Lee Martinez Park. The property is 11.34 acres in size and is located on the south side of Lee Martinez Park, west of North College Avenue, north of Cherry Street, east of North Sherwood Street. The property is zoned LMN - Low Density Mixed Use Neighborhood in the "new" Land Use Code that became effective on March 28, 1997; however, this proposal was submitted prior to March 28th and is subject to the rules, regulations, and requirements of the "old" LDGS. It has been evaluated against the All Development Criteria, the Business Service Uses Point Chart, and the Residential Uses Density chart in the LDGS. The request scores 72% on the Business Service Uses Point Chart (exceeding the minimum 50% required), earning points for: a) being located outside of the "South College Avenue Corridor", b) being two acres or more in size; c) being a mixed -use development containing residential and commercial (potentially office/retail) uses; d) providing joint parking with Lee Martinez Park; and e) contiguity to existing urban development. ITEM NO. R MEETING DATE 4/ 2 R/ 9 7 6iA STAFF Steve Olt Citv of Fort Collins PLANNING AND ZONING BOARD STAFF REPORT PROJECT: Martinez PUD, Preliminary - #4-97 APPLICANT: Wonderland Hill Development Company 745 Poplar Avenue Boulder, CO. 80304 OWNER: Trillium Corporation 4350 Cordata Parkway Bellingham, WA. 98225 PROJECT DESCRIPTION: This is a request for preliminary planned unit development (PUD) approval for a mixed use development consisting of 10 single family residential lots (each with a second dwelling unit above a detached garage), 34 co -housing (multi -family) dwelling units, a 36,000 square foot commercial building (with 11 residential dwelling units on the second and third floors), and two parcels of land (totaling 2.46 acres) that will become part of the existing Lee Martinez Park. The property is 11.34 acres in size and is located on the south side of Lee Martinez Park, west of North College Avenue, north of Cherry Street, east of North Sherwood Street, and is zoned LMN - Low Density Mixed Use Neighborhood. RECOMMENDATION: Approval with conditions EXECUTIVE SUMMARY: This request for preliminary PUD approval: scores 72% on the Business Service Uses Point Chart (exceeding the minimum 50% required) of the Land Development Guidance System L( DGS); scores 110% on the Residential Uses Density Chart (exceeding the minimum 80% required to support the proposed density of 7.39 dwelling units /acre) of the LDGS; meets the applicable all Development Criteria of the LDGS; is located on a site that is excluded from the Residential Neighborhood Sign District. All signage will be regulated by the Fort Collins Sign Code that is administered by the Zoning Department. COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES Z81 N. College Ave. P.O. Box580 Fort Collins, CO80522-0580 (970)221-6750 PLANNING DEPARTMENT