Loading...
HomeMy WebLinkAboutMARTINEZ PUD - PRELIMINARY - 4-97 - SUBMITTAL DOCUMENTS - ROUND 1 - STREET RELATED DOCUMENT23' z w 7' PARKING a w O w (9 w w 16' TRAVEL PRIVATE DRIVE SECTION A -A LOOKING WEST 3 w 0 23' E7 � 7' 16' PARKING TRAVEL o0 OW OJ > • J O •�. 2% PRIVATE DRIVE SECTION- B-B LOOKING WEST Martinez P.U.D., Ft. Collins, Colorado Pavement File: L-CLIENT \ LEACH \ MARTINEZ \ PAVEMENT Project No: 1558-01-96 Date: 01/ 12/97 PAVEMENT SECTION FOR PRIVATE DRIVE: PAVEMENT SECTION: Hot Bituminous Pavement (HBP) Aggregate Base Course (ABC) TOTAL: 3" R" 11" * All hot bituminous pavement shall be Grading "C" conforming to most current Colorado Department of Transportation (CDOT) specifications. * All aggregate base course shall be class 5 or 6 conforming to most current Colorado Department of Transportation specifications. * Subgrade shall be stripped, scarified to a depth of six inches (6"), and recompacted to at least 95% of maximum density at +/- 2% standard proctor optimum moisture. * Soil sterilization recommended under all new paving. NOTE: All pavement sections noted with these plans are preliminary and are for bidding purposes only. They do not reflect the results of a Final Pavement Design Report submittal and shall not be utilized for construction. No pavement, curb, gutter or sidewalk shall be placed until a signed approved copy of the Final Pavement Design Report has been distributed. All final pavement sections shall be in accordance with the approved Final Pavement Design Report. Paving shall not commence until subgrade compaction tests are taken and approved in accordance with the City's standards adopted in April, 1996.