HomeMy WebLinkAboutMARTINEZ PUD - FINAL - 4-97A - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject. I1�o,��' 1����
Planner: Tralic Operations:
Engineer: S`,a�,-����
Date:
Site Land
Items Requested
Plat Utility I Drainage Rpt Other Items Required
Redlined Items Being Returned
Site land Plat Utility Drainage Rpt Other Items Being Returned
Engineering
i
i
i
Z
Stormwater
I
I
1
I
2
X
X
Water/Wastewater
I
I
1
X
X
Traft Operations
1
x
Trans. Planning
X
Transtrt
Natural Resources
Park Planning
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.
Project:
Planner:
Engineer:
Date:
Traffic Operations:
Items Requested
Site land Plat I Utility Drainage pt I Other Items Required
Redlined Items Being Returned
Site land Plat Utility Drainage Rpt Other Items Being Returned
Engineering
✓
v
Stormwater
,�
✓
,/
Water/Wastewate
✓
j
Traffic Operations
Trans. Planning
v/
Transfort
Natural Resources
Park Planning
✓
Totals
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.
Revisions Routing Sheet
PROJECT
■■■
MINN
®■o®■■■i■■i■■■■■�■■
BUILDING INSPECTION■■■■■MAPPING
■■■■■■■■
/ DRAFTING
IN
■
■■
■■■�
■�■■�
FCLWD[ELCO[BOXELDER
■■■■
■■■■
■..■■i
ADVANCE PLANNING..®e..........
'
......■.....�.
'�
......■.....■.
..............
...■■.....■..�
SCHOOLS: .....■..■CABLE
..
■.�.
TV
STATE HIGHWAY DEPARTMENT
■■■�■■■®�■■■
■DITCH
■■■
COMPANY
RAILROAD: UP or BN/CS
REA DOE PRPA
IN
■..■........
::.....
.......:::::�
..■......■■�.
•••....■�.■■■
::::::::::�:'■