Loading...
HomeMy WebLinkAboutDOERR PUD & SUBDIVISION - 6-97 - CORRESPONDENCE - (3)a) There are existing 8" sewer lines off of Myrtle and Tyler. b) You can take services off either Myrtle or Tyler but we would prefer off of Myrtle. c) Plant Investment Fees and Water Rights are due at time of building permit. (Please contact Mary Young for water rights at 221-7984. Please contact Jeff Hill at 221-6674 if you have questions about these comments. required and it must be prepared by an engineer registered in Colorado. c) Grading along the existing lot lines is sometimes difficult. We normally require contours 50' outside the lot line. We need enough information to tell if surrounding properties' drainage and grading are not being affected. If they are, offsite easements would be required. Please contact Glen Schlueter at 221-6589 if you have questions about these comments. 3. The Engineering Department offered the following comments: a) There is a street oversizing fee of $895 for the new structure. b) Any easements that you dedicate must be reflected on the plat. c) We prefer the driveway to take access from Myrtle rather than Tyler because of less traffic. d) All services need to be shown on the utility plans. Please contact Mike Herzig at 221-6750 if you have questions about these comments. 4. The Light and Power offered the following comments: a) Is power to the existing house via overhead service? If it is underground service from the rear of Lot 19, there is a fee to move the service to the side. b) A close estimate of fees due at time of building permit are as follows: for development charges-$1,200 and for underground service fee- $414. Please contact Monica Moore at 221-6150 if you have questions about these comments. 5. The Parks and Recreation Department offered the following comments: a) Neighborhood and community park fees are due at time of building permit. Both are based on the square footage pf the lot. Approximately, those fees will be $934 for the community park and $848 for the neighborhood park. Please contact Randy Balok at 221-6364. if you have. questions_ about these comments. 6. The Water and Wastewater Departments offered the following comments: YyK CONCEPTUAL REVIEW STAFF COMMENTS City of Fort Collins MEETING DATE: February 10, 1997 ITEM: Doerr PUD and Subdivision Preliminary and Final APPLICANT: Thomas J. and Kari Rae Doerr 6895 West County.Road 38E Fort Collins, Colorado 80526 LAND USE DATA: Request for the minor subdivision of Lot 19 of the Valley Hi Subdivision and for construction of a single-family residence on Lot 19B. COMMENTS: 1. The Zoning Department offered the following comments: a) The property is in the RL-Residential Low Density Zoning District. b) You may be required to deed a couple of feed to the property owner on the west side of the property. This is required because you need to make sure that this minor subdivision is resulting in a legal lot line, and as the garage to the west does not meet current setback requirements, by deeding them the feet necessary to reach the legal setback, it will become a legal lot line. Please contact Gary Lopez at 221-6760 if you have questions about these comments. 2. The Stormwater Utility offered the following comments: a) This site is located within the Canal Importation basin where the fees are $6,181/acre and it is subject to the runoff coefficient reduction. b) Since this site contributes on a small increase, a variance to detention could be requested. Justification is required in the drainage and erosion control reports. A drainage and erosion control report is COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750 PLANNING DEPARTMENT CommL Ay Planning and Environmenta. _ ervices pFtayEcr FI r.E Current Planning City of Fort Collins February 12, 1997 Thomas J. and Kari Rae Doerr 6895 West County Road 38E Fort Collins, Colorado 80526 RE: Doerr PUD and Subdivision Preliminary and Final Dear Mr. and Mrs. Doerr: For your information, attached is a copy of the Staffs comments concerning the request for the proposed Doerr PUD and Subdivision, Preliminary and Final, which was presented before the Conceptual Review Team on February 10, 1997. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Sincerely,. n Leanne Lawrie Project Planner xc: Stormwater Utility/Glen Schlueter Kerrie Ashbeck File/Project Planner 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 FAX (970) 221-6378 • TDD (970) 224-6002