Loading...
HomeMy WebLinkAboutDOERR PUD & SUBDIVISION - 6-97 - CORRESPONDENCE - REVISIONS2. Please provide more detail of the off -site flows draining through this site. These off - site flows should be determined and included on a drainage summary table on the plans. Drainage basins for this area should also be shown on the plans to show all of the contributing area to this site. RESPONSE: (✓E HDOCD OFGs/TE $Af/� AND D2AIM46e JUAMAIey ri4BLD To fNBeT3. 3. Please provide a cover sheet with the required general notes and include a copy of the plat with the next submittal. RESPONSE: WE ADDED A C0w62 SHEET AJ INBE'r J, IvS. PL.4i AJIAt,6E7- Z A ND U-M,/Ty, 6e,4P/,v6 f PRAiv1G6PL.4 N AX .ff/Ee, 3. Please refer to the redlined plans and report for additional review comments. PROJECT COMMENT SHEET City of Fort Collins Current PlanninLy DATE: January 21, 1997 DEPT: Engineering PROJECT: #6-97 Doerr P.U.D. & Subdivision Preliminary & Final PLANNER: Ted d -S __ -r d ttp•A--%#- l.&A#1 rt Q All comments must be received by: Monday, February 10, 1997 Plat: • Dedicate 9 foot utility easements along the street rights -of -way to meet the current requirements for utility easement width. Site/Landscape Plan: • The driveway to the new house must be a minimum of 20 feet from the property comer (see redline plans). • Show the driveway access to the existing house • Add a note to state that the property owner will repair and/or replace any existing damaged curb, gutter, and sidewalk, and/or any damage caused by the construction on this site, prior to the issuance of a certificate of occupancy. Utility Plan: • Add the City's standard General Notes • Staff will verify whether or not the streets adjacent to this project are scheduled for the City's Street Rehabilitation/Overlay program. If they are, the City will want to coordinate the work so that the street cuts for the utility services are done prior to any overlay work. Date: ZA /97 Signature iK. CHECK IF YOU WISH TO RECEIVE ,® PLAT COPIES OF REVISIONS C SITE - LANDSCAPE UTILITY PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: January 21, 1997 DEPT: Stormwater Utility PROJECT: #6-97 Doerr P.U.D. & Subdivision Preliminary & Final PLANNER: 73 Z E, w4f L4rd,1i� All comments must be received by: Monday, February 10, 1997 A written response for each of the following comments must be submitted, with the redlined plans and report, at time .ofproject resubmittal. The responses must note any revisions or clarifications completed in result of these comments. If responses are not submitted with the resubmittal, the project will be returned to the applicant without further review. This procedure will help the review process become more efficient and effective. Thank you. 1. Please provide erosion control protection for this site. A silt fence and protection for the concrete pan are necessary to control sediment and keep it off of City streets. The minimum amount of $1000 for the erosion control escrow will be required, and the construction schedule & notes should be included on the drainage plan. w 6 A Doe o A s.c.7 FBNce ALA06 THE S o✓'rH i ENT S ID of OF Lo-r jai-B A .vo RESPONSE: Srr.AW 13AG61 -4T TOYS BgSr a vD of rHE r0Ar rC ?aN. QP �;Ef?, 1t1Isr- Date: a- 6 —7 Signature // CHECK IF YOU WISH TO RECEIVE ❑ PLAT ='' xrr-,e �/ih6Cu` COPIES OF REVISIONS ❑ SITE Zeawi/e 44irie ❑ LANDSCAPE ,Stea/arts flwd. ❑ UTILITY 7/oS Activity A: ALL DEVELOPMEJv CRITERIA ALL CRITERIA L1C.,8L_ I c E AP. CRITERIA ONLY s the azenon WTI me era ' _ acp�inelei besatisfieo� 3 CRITcRION• s s Yes INo If no, please ex -lain _ A _ �1. COMMUNITY-IVIDE CRITcRI.% I 1.1 Solar Orientation I X Inc I I x 1.2 Comorehensive Plan I X I X I I 1.3 Wildlife Habitat I I IX I 1.4 Mineral Deposit I I IXI 1.S ===lccic=lly Sensitive Areas I reserved I 8 Lands cf Acricultural Imoor_rice I rey:r-ea I 1.7 Enercv Conservation I X I x l l X 1.8 Air Oualitv Ix IX I I X 1 W=ine r% 1• j-- - ic , j-- - _- "= i IX I x1 I X I I 10 c_�.vace erc Wastes I ? IXI 1 1. 1 14 W= rC on eN-•• ( Ix I 1.12 ResidentialDensity Ix 1XI I X I I tt. ?. NE!GHEORH000 COMP.�TIEILITY CRIT�=cIAI =.1 Vehic:.•iar. P=_asman. Bike T ransocnation I xl Al I I I 2 2 Euiicirc_P!acement and Oriental: ics lxl>ej I X I I 2 Natural r-e=tures I I 1)CI I I 2.4 Venicular Circulation anc Parking_ I I IXI I j 2. - Emergency Acc=SS 2-:, Pecestrian Circulation Ix xl I x I 2.; .�4r;.:,Itec:ure I xl)CI IXI I 2 = wilding Heicnt and Views I I IXI I 2. S Shading I x l xl I x 2. 10 aclar. Access Ix Ix I I X I I• 2.11 I-!is:oric Rescur::2s I xi x l .I X I 2.12 Setcacks I xl xI Ix 2.13 L andscaoe x I x I f ^I I 2.14 Sicns I IXI I I 2.:5 Site Lighting 2.16 Ncise and Vibration I I x I I I 2.17 Glare or Heat 2.18 Hazardous Materials I k A 3. ENGINEERING CRITERIA 3.1 Utility Capacity Ixi )C1 I I I 3.2 Design Standards X JK I I X I I 3.3 Water Hazards 3.4 Geologic Hazards I I Land Development Guidance System for Planned Unit Developments . The City of Fort Collins. Colorado, Revised , ft 1994 -61-US� 11 Criterion i Itit can be de ,nest the project will rednee non-rzoewable energy usage eitb...crough the application of alternative energy' x systems or through comminul-coergy conservation mawrea beyond those normally roquirtd.by City Code, a 5% bonus may be Y earned for every 5% reduction ja mcrgy use. Calculate a 1% bonus for every So acres included in the project / Y II Cahilase the peroeatage of the total sae: in the project that are devoted to r=twonal use. Freer h of that percentage as a bonus O If the applicant commits to preserving permanent offtile open space that meets the City's minimuat roggirsments, calculate the / percetage of this open space garage to the total development acreage and ems this percentage as a beaus. P, I IfpsA of the total development budget isto be spent on neighborhood public transit facilities which are not required by City Cade, ester a 2%bonus for every $100 per dwelling unit invested Ifpsrt oftbe total &NCIOprtrrt WdO is to be spent on neighborhood facilities and services witch are not otherwise required q'b City.. Cod-, enter a I % bonus for every S I00 per dwelling unit invested Y Ifthe project contains dwelling urdis ad aside for individuals earning 800A or lea oftbe median income of City resident% as adjusted I, for family size, and paying less Um 30 A of their gross insane for housing, including utilities ("Affordable Dwelling Units"), calculld the percentage of ASordable Dwelling Units to the total number of dwelling units in the projed and enter that percentage as a bonus, up to a aweirrm of 15% (Ifthe project is proposed to be constructed in multiple phases, the Affordable Dwelling Units' must be constructed as a pert oftbe pbm fwvhkh approval is scu811t) In order to insure that the Affordable Dwelling Units remain affordable for a period ofnot less than 25 years, the developer shall road nub proteetivecovenantz as maybe required by the City under Sac.29-526(Jx4} Ifa tment is being made to develop a specified percentage of the total number of dwelling units for Type "A" and Type "B" handicapped housing as defined by the City of Fort Collirm Calculate the bonus as follows: S Type "A" .5 x Tyve "A" Units Total Units / In no case shall the combined bonus be greater than 3056 Type "B" 1.0 x TN -De "B" Units Total Units If the site or adjacent property cocrains.a historic building or place'.a bonus maybe earned for the following t % For preventing or mitigating outside infiuco= adverse to its preservation (e.g. envircemrcNal, land use, aesthetie, economic and social factors}, 3° Forassrmg that new stnxLues will be in keeping with the character of the building or place, while avoiding total units, d /o Forptoposing adaptive use of the building a play that will lead to its corniouanoe, pr=wmaon and improvement in an appropriate marrow u ►] W Ifs portion or all oftbe required perking in the multiple family project is provided uodegrwnnd within the building, or in an elevated parking structure as an "ocssony usetothe primary structure. a boron may be earned as follows: 9°h For providing 75% or more of the paring in a dnsctrue; 601e For providing 50.74% of the parking in a structure 3% For providing 25.49°/a of the parking in a sftuc4un Ira commitment is being made to provide spRwod automatic fire extinguishing systems for the dwelling "" k enter a bonus of 10% Ifthe applicut commits to providing adequate, safe and convenient pedestrian and bicycle connections between the project and any oftbe destination points described below, rxlculale the bonus as follows: 556 For rxnmM14 to the nearest erdsting City sidewalk and bicycle path/law, 5% For connecting to any existing public school, park and transit stop within the distances as defined in this Density Chart; S% For comnectin to an existin C' bicycle trail which is ad'aeert to or traverses the 'ect. TOTAL & /0 AMk :TS.�n�:.: ... .HTiT.. riR 'i. :i%:M1..;.F:C.N..:�:::•;•v FR:':;$�'Sr'i : ii'�:.i-; ::::......... .. S.n .. Y...........n ':v,53:S�T:: .. T:: .::;{: n: .3�: .. •\.. .: ni:. nw_ :pS:;i:: ii;.TSi: ':. 4: :!.. n .i :..S:in:'v.•...::::n ...:: i:ii:::':i �:": .�. TY.,CHART�H..' .. ...... ........ .:.:.......... .... .... ;3:u;1::35::...... ... MAW ......... ................. ....... ...:........... r�:: n:vn......... r.'.'......' .................... ... :�....:..n:•>iii%^>r1';Ev,.3 iTly.•:1n3::}n_i...J....;. FC..v,.yn\Y 'i3Qin �Y :<U.3}',�;}'�?��;i=S:::M Criterion Credit Credit *` 2000 fed of=cdAi ug neighborhood service center, or a neighberbood service center to be constructed as a part 20%a oftbepr*a (If the Projed la proposed to be ooeslruded in multiple phase; such neighborlhood service venter must be constructed as a part of the phase for which approval is sought) 650 fed ofan eriAing tramit cop (applicable only to projects having a density ofst least six (6j dwelling units 2044 . per acre on a gram acreage basis) ... . Si "' C 4000 feet of an existing oom rnmity/regional shopping eeahter• or a oom®mity/regional slopping dealer to be 10% - constructed as a pad of the project (If the Pcojed is proposed to be constructed in multiple phases, such eommunhyh4mal'shopping cader mud be constructed as a part of the phase for which approval is sought) ofan existing reigh6orbood croorhmm$y per. or a community acility (ExcEPT GOLF COURsax 204 20% ------ ---------------------- -- ------------------------------------ 3500 fat of a owned, but not developed, neighberihood or community park, or eomnnuaity farility lost (EXCEPT GOLF COURSES) or .::z.. —publicly ------------------------------------------------------------- — — — — — -- ------- 3300 fed of a publicly owned golf course; whether developed a rid --- Io°h / a2500 fat of an existing school, mating all requirements of the State of Colorado compulsory education laws 10°h 3000 fat of an e ' max to xustiog j employment neater, or a major employment center to be constructed as a part of 20•h the project.' (Iftbe project is proposed to be constructed in multiple phases, such major employment center mud be constructed as a part of the phase for which approval is sought) No building, offsos or business parir,. or shopping cadet which has served as the basis for the claiming of credit under any other -bane^ criteria of this Density Chart can also be used as the basis for claiming audit under this criterion. g 1000 fed ofan existing child ere center, or a child are center to be constructed as a part of the project. (If the 5% project is proposed to be constructed in multiple phases, such child are center mud be constructed as a part oftbe phase for which approval is sought.)' �� North Fort Collins" 20% / IThe Colral Business District 20% A project whose boundary is contiguous to existing urban developmrn2 Credit may be earned as follows: 30% 0°h Forprojects whose property boundary his 0 -10% contiguity; 10 - IS°h For projects whose property boundary has 10 - 20°h contiguity, 1 S - 20°h For Projectspropertywhose property boundary has 20 - 30-A contiguity; 20 - 25% For projects wbae boundary his 30 - 40•h contiguity, . S protects PropMY boundary nu 40 - 50°h coa ugu . If the project contains dwelling units ad aside for individuals earning 80°h or less of the median incase of City 15% residents, as adjusted for family size, and paying less than 30% of their gross inane for housing, including . k atilhies ("Affordable Dwelling Uam'I --mild- the permtage of Affatable Dwelling Units to the total number ofdwelling under in the project and eater that percentage, up to a maudmum of 150/. (If the project is proposed to be amtruded in multiple phased the Affordable Dwelling Units mud be constructed as a part of the phase for which approvalis sought) In order to insure that the Affordable Dwelling Units remain affordable for a period dad less than 25 yeas, the developershall recent such protective covenants as maybe required by the City under Sec 29-526(Jx4} ACTIVITY: Residential Uses EFINITION: . All residential uses. Uses would include single family attached dwellings, townhomes, duplexes, mobile homes, and multiple family dwellings; group. homes; boarding and rooming houses; fraternity sorority houses; nursing homes; public and private schools; public and non-profit quasi -public, recreational uses as a principal use; uses providing meeting places and places for public assembly with incidental office space; and child care centers: CRITERIA, The following applicable criteria must be answered "yes" and implemented within the development plan. Yes No N/A 1. DOES THE PROJECT EARN THE M 41MUM PERCENTAGE POINTS AS CALCULATED ON THE FOLLOWING "DENSITY . CHART IT'FOR THE PROPOSED DENSITY OF THE RESIDENTIAL PROJECT? The required earned credit for a residential project shall be based op the following: %, ti. 60 - 70 percentage points = 6-7 dwelling units per acre 70 - 80 percentage points = 7-8 dwelling units per acre 80 - 90 percentage points = 8-9 dwelling units per acre 90 -100 percentage points = 9-10 dwelling units per acre 10.0 or more percentage points = 10 or more dwelling units per acre 2. DOES THE PROJECT EARN AT LEAST 40 Yes No N/A PERCENTAGE POINTS AS CALCULATED E2 El ON THE FOLLOWING "DENSITY CHART H" FROM BASE POINTS? Land Development Guidance System for Planned Unit Developments. The City of Fort Collins, Colorado. Revised as per Ordinance No. 2, 1996. PROJECT COMMENT SHEET City of Fort Collins Current Plannine DATE: January 21, 1997 DEPT: Engineering PROJECT: #6-97 Doerr P.U.D. & Subdivision Preliminary & Final PLANNER: All comments must be received by: Monday, February 10, 1997 Plat: • Dedicate 9 foot utility easements along the street rights -of -way to meet the current requirements for utility easement width. Site/Landscape Plan: • The driveway to the new house must be a minimum of 20 feet from the property corner (see redline plans). • Show the driveway access to the existing house • Add a note to state that the property owner will repair and/or replace any existing damaged curb, gutter, and sidewalk, and/or any damage caused by the construction on this site, prior to the issuance of a certificate of occupancy. Utility Plan: • Add the City's standard General Notes • Staff will verify whether or not the streets adjacent to this project are scheduled for the City's Street Rehabilitation/Overlay program. If they are, the City will want to coordinate the work so that the street cuts for the utility services are done prior to any overlay work. Date: ZA /97 Signature CHECK IF YOU WISH TO RECEIVE PLAT COPIES OF REVISIONS SITE LANDSCAPE UTILITY PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: January 21, 1997 DEPT: Stormwater Utility PROJECT: #6-97 Doerr P.U.D. & Subdivision Preliminary & Final All comments must be received by: Monday, February 10, 1997 A written response for each of the following comments must be submitted, with the redlined plans and report, at time of project resubmittal. The responses must note any revisions or clarifications completed in result of these comments. If responses are not submitted with the resubmittal, the project will be returned to the applicant without further review. This procedure will help the review process become more efficient and effective. Thank you. 1. Please provide erosion control protection for this site. A silt fence and protection for the concrete pan are necessary to control sediment and keep it off of City streets. The minimum amount of $1000 for the erosion control escrow will be required, and the construction schedule & notes should be included on the drainage plan. RESPONSE: OG•;ER, ��r�dsE Date: ;L Signature CHECK IF YOU WISH TO RECEIVE ❑ PLAT COPIES OF REVISIONS ❑ SITE �e��ri/Pui/ie ❑ LANDSCAPE 5 e.ZrA 0 UTILITY j,,/ eel, Doerr PUD, Preliminary and Final Page 4 February 12, 1997 Plan revisions are due by 12:00 noon on March 5, 1997. Please contact me for the number of folded revisions required for each document. No revisions will be reviewed after the above deadline. If revisions are not received by this date, the item will either go to the Planning and Zoning Board with a staff recommendation based on the originally submitted documents or the applicant will have the option to continue the item to the next month's P8Z agenda. PMT's, renderings, and eight (8) folded copies of final revisions are due by 12:00 noon on March 17, 1997. AAA##**f!f*R#f#Rf#*f****!###*!*!R*#****AlfRfA##*f*ffAAi##lff11R##f!flRRi*##!!flflflfRR###f*iff Please provide a written response to each of the above stated comments with the submittal of plan revisions. Please contact me at 221-6641 if you have any questions or concerns that are related to the comments. If you would like to schedule a meeting, please call me as soon as possible. Best -•_ • t�� Leanne A. Lawrie Project Planner xc: Kerrie Ashbeck Stormwater Utility file/Project Planner Doerr PUD, Preliminary and Final Page 3 February 12, 1997 -Densities of residential uses. -Existing trees and major features of landscape. -Topographic contours at two (2') intervals. -Traffic circulation system. h. On the vicinity map (of the area surrounding the site within a distance of at least one (1) mile), show the zoning districts including, and surrounding the site; location of existing municipal boundaries; traffic circulation system; and major public facilities. I. The site plan should include the existing and proposed utility systems including sanitary sewers, electric, gas and telephone lines, fire hydrants, and trash collection areas. j. On the site plan, please include the date of preparation. k. You will need to submit a statement of planning objectives, including: -Statement of appropriate City land use policies achieved by the proposed plan. -Statement of proposed ownership of public and private open space areas; applicant's intentions with regard to future ownership of all or portions of the planned unit development. -Description of rationale behind the assumptions and choices bade by the applicant. -Detailed description of how conflicts between land uses are being avoided or mitigated. -Completed Energy Conservation Worksheet using Energy Conservation Method One (attached). -You will need to submit an "AII Development Criteria" sheet and a calculation of residential density. (Both are included.) This completes the review comments at this time. Additional comments may be forthcoming as the various departments and reviewing agencies continue to review this request. Please be aware of the following dates and deadlines to assure your ability to stay on schedule for the March 24, 1997, Planning and Zoning Board hearing: Doerr PUD, Preliminary and Final Page 2 February 12, 1997 3. TO of Fort Collins states "TCI of Fort Collins would like to have a rear utility easement on Lot 19A." 4. The Light and Power Department notes that electric development charges will be due on this site. 5. The Park Planning Department notes that parks fees are due on the new unit at the time of building permit. 6. Comments from Stormwater Utility are attached. 7. Comments from Engineering are attached. 8. The Mapping Department states "Describe all outerboundary monuments." 9. The Water and Wastewater comments have been forwarded to Stewart and Associates with comments. a. Prefer you take services off Myrtle rather than Tyler. b. Plant Investment Fees and Water Rights due at time of building permit. 9. The Current Planning Department offers the following comments: a. Label the existing zoning on the site plan. b. The number and percentage of solar -oriented lots must be indicated on the site plat. (A copy of the ordinance is included.) C. With revisions, you will need to submit a landscape plan that shows existing and new landscaping. d. What are the number of bedrooms per each dwelling unit? e. Please show the public street right-of-way . f. What is the maximum building height? g. Area shown on the site plan need to be extended beyond the property lines of the proposal to include a survey of the area and sues within one hundred fifty (150') feet of the proposal, exclusive of public right- of-way, at the same scale as the proposal and including the following: -Land uses and location of principal structures. Commun" Planning and Environmental c -vices Current Planning City of Fort Collins February 12, 1997 Thomas J. and Kari Rae Doerr 6895 West County Road 38E Fort Collins, Colorado 80526 RE: Doerr PUD and Subdivision Preliminary and Final Dear Mr. and Mrs. Doerr: Staff has reviewed your plans for the Doerr PUD and Subdivision Preliminary and Final that were submitted on January 16, 1997, and would like to offer the following comments. The Natural Resources Department offers the following comments: a. Please provide a landscaping plan that shows existing and proposed landscaping. 2. The Zoning Department offers the following comments' a. Scale needs to be at 1 "=50' or 2"=100' b. Concerning the existing garage from the lot to the west —"What was its prior side set back to property.line. I don't believe we can allow an illegal non -conforming setback to occur via this PUD. Garage side setback is less than 5'. 1 think they will have to assure garage is 5' from side property line by giving more of the "jog" to lot 20 for use to approve this building envelope (may have to more east 2'4.)" C. Site plan also needs to show driveway on new house —to assure off street parking for a two car wide drive. This is required due to the compact lot as we do not want to affect the present on -street parking of the neighborhood. According to the building code, only one off- street parking is required. d. Show building dimensions of existing structure and the distance to property lines. e. The shed will need to be at least T from the rear property line (if of combustible materials.) 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 FAX (970) 221-6378 • TDD (970) 224-6002 choices made by the applicant. Statement of proposed ownership - NA as per current planning. Detailed description of conflicts mitigated - None. Completed Energy Conservation Worksheet Method One - attached. All Development Criteria and calculation of residential density attached. This completes all the requirements and requests by City of Fort Collins to the Doerr Subdivision and PUD. Please advise if there are other details needed. j Since , ari ae' oerr Doe UD psentative Xh as . 5. Light and Power charges will be.paid at time of building permit. 6. Comments from Storm Water Utility are addressed by Stewart and Associates as follows: 1. "We added a silt fence along the south and east sides of lot 19B and straw bales at the east end of the concrete pad." The escrow amount as required is accepted. 2. "We added off -site basin and drainage summary table to sheet 3." 3. "We added a cover sheet as sheet 1. sub. plat as sheet 2 and utility, grading & drainage plan as sheet 3." 7. Comments from Engineering are addressed by Stewart and Associates on the plat. A. Dedicated 9' utility easements along street rights of way to meet requirement B. The driveway to the new house will be more than 20 'from property line - see Stewarts red line. C. Driveway access to the existing house is shown on the site plan. D. The property owner will repair and/or replace any existing damaged curb or damage caused by construction on this site prior to issuance of certificate of occupancy. E. City's standard general notes added. F. City coordinating work so street cuts are done prior to overlay is accepted. 8. All outerboundary monuments are described. 9. Water and Waste water comments are coming from Stewart and Associates. a. Services need to come off of Tyler as addressed by Stewart and Associates. b. Investment fees and water rights due at time of building permit accepted. 10. Current planning comments are accepted and concurred with. a. The existing zoning on the site plan =RL and will be labeled on the site plan. b. Both lots are 100% solar oriented as indicated on the site plan. c. The landscape plan is included on the site plan as requested by current planning. d. House A (existing) is 2 bedroom 1 bath; house B (new) is 3 bedroom 2 baths and is indicated on the land use data table. e. NA as per Current Planning 2-27-97. f. The maximum building height is 20 feet. g. Area shown on site plan will show 100' as per current planning showing existing right-of-ways, land uses and location of principal structures. (Densities will be noted by current planning in staff report.). Existing trees, major features of landscape, topographic, contours at 2' intervals and traffic circulation are shown as requested. h. Vicinity map shows zoning districts, location of existing municipal boundaries, traffic circulation system and major public facilities. i. The site plan will include proposed utility systems, electric, gas, telephone lines, fire hydrants and trash collection sites. j. Date of preparation is included on site plan as requested. k. Statement of planning objectives is included on the Site and Landscape plan including appropriate City Land Use Policies, and description of rationale behind assumptions and L,,C,� N'e�7 Thomas J. and Kari Rae Doerr 6895 W. County Road 38E Fort Collins, CO 80526 March 3, 1997 City of Fort Collins Current Planning - Leane Lawrie 281 North College Avenue P.O. Box 580 Fort Collins, CO 80522-580 RE: Doerr PUD and Subdivision Preliminary and Final Reply Dear Ms. Lawrie, We have reviewed your letter regarding comments made by staff review dated February 12, 1997 and would like to reply to each numbered item. 1. a. The landscape plan is included in the existing site plan as requested by Current Planning. 2. a. The scale is 1" to 20' and is shown on the site plan as. requested. b. Stewart and Associates engineering measured -the distance from the garage on lot 20 to the property line at 2' 10". This leaves 2' 2" deficit to meet a total of 5' setback from the garage and the property line. The property owner of lot 20, Susan Burchi, agrees to accept the 2' 2" to be deeded to Ms. Burchi from the Doerrs to concur with the requirement of the City OR the Doerr's will move the building envelope 77' from the property line, which ever is desired by the city. This is reflected on the plat. c. The Site Plan shows the driveway of the new house as requested to assure off street parking for a two car wide garage. d. Building dimensions of the existing structure and the distance to property lines are shown as requested. e. The shed shown on the original site plan will be removed. It is approximately 20 years old and is in unsatisfactory condition not worth salvage. 3. TCI of Fort Collins will have a rear utility easement on Lot 19A as requested. 4. Light and Power charges due on the site will be paid at time of building permit.