Loading...
HomeMy WebLinkAboutHARMONY TECHNOLOGY PARK, 1ST, CELESTICA - FDP - 12-97B - CORRESPONDENCE - REVISIONS (3)November 25, 1997 Mr. Ted Shepard City of Fort Collins Planning 281 N. College Ave. P.O. Box 580 Fort Collins, CO. 80522-0580 RE: Final Compliance Plan for Celestica Colorado Dear Ted, Thank you for your letter of November 18, 1997 regarding the Final Compliance submittal for Celestica. Enclosed please find our revised submittal documents. In reference to the notes in your letter, we have responded as noted below. Our numbers correspond with the numbers in your letter: 1. Done 2. Acknowledged. In order to avoid disturbing existing trees, it is not possible to relocate the easement. A widened easement is being provided to accommodate PSCo.'s needs. These issues have been coordinated with PSCo. 3. We're still working on this one. 4. Done 5. Done 6. A. Done B. We have indicated "Possible Future Trees" along the south elevation of the building. We have also included the following statement on the Landscape Plans: Landscaping on the south side of the building is conceptual only and is intended to illustrate a landscape commitment on the part of Celestica in the event that the south building expansion is not started within the next 5 years. Celestica will post a bond or escrow in the amount of 125% of the estimated landscape cost with the City of Fort Collins that can be used to construct this landscaping in the event the expansion is not completed. Please let me know how we can be of any help. Sin rely, design Bruce A. H ndee, ASLA Principal design LANDSCAPE ARCHITECTURE URBAN DESIGN PLANNING BMA DESIGN. INC. IBUS INNOVATION DRIVE ET. COLLINS. CO 80525 TEL 970 222.7577 FAX 970 223-I327