HomeMy WebLinkAboutHARMONY TECHNOLOGY PARK, 1ST, CELESTICA - FDP - 12-97B - CORRESPONDENCE - (3)17. On sheet 3 of 5, note number 11, please add a reference that maintenance of
the median in Technology Parkway is the sole responsibility of the developer.
18. Since we will be recording the Lighting Plan, the plan set should consist of six
sheets and each sheet re -labeled accordingly.
19. On sheet one, please correct the typo in note number five and under the
ownership signature, please note that the correct spelling is "Notarial.'
This concludes our comments at this time. For revised plans, please re -submit number
of copies of the sheets one through five, including new sheet six for Lighting. As
always, please call if there are any questions or concerns regarding these comments.
Sincerely:
77e/ ��j
Ted Shepard
Senior Planner
t
9. The site shall be accessible to persons with disabilities in accordance with
Uniform Building Code Section 3103 and UBC Appendix Section 3106. Please
provide a designated and marked "accessible route of travel" among all
buildings on the site and building exits and entrances and the public way (public
sidewalk). Accessible routes shall comply with ANSI A117.1-1992 with running
slopes no greater than 1:20 and cross slopes no steeper than 1:50.
Where routes cross lanes for vehicle traffic, they shall be designated and marked as a
cross -walk. Provide parking and signs per U.B.C. Appendix Section 3107. Parking and
access aisles shall comply with ANSI A117.1-1992 with slopes no greater than 1:50 in
any direction. For further information, please contact Sharon Getz, Plans Examiner,
Building Inspection Division.
10. The building must also comply with the City of Fort Collins Non-residential
Energy Code (ASHRAE 90.1 with locally adopted amendments).
11. The building is only about 30 feet in height yet the land use data table states
that the maximum building height is six stories. While six stories is the maximum
allowed in the Code for the H-C District, a more realistic portrayal of the project
would be to state the accurate figure.
12. It is recommended that the 15 parking spaces directly east of the east entrance
be designated as visitor parking only not to be shared with employees. Fourteen
regularly sized spaces for visitors for a building of this size is not unreasonable.
13. Be sure that all handicap parking spaces feature ramps in the proper locations.
14. Please add a note on both the Site Plan and Landscape Plan regarding the
Planning and Zoning Board's condition of approval that in the event that the
driveway access to Harmony House from Harmony Road is closed, the land area
devoted to such access shall be regraded and modified for a landscape berm
along Harmony Road.
15. Please indicate on the Site Plan the location of the bus pullouts on C.R. #9. On
the west side (southbound), the pullout should be 200 feet north of the centerline
of Timberwood Drive. (Please label Timberwood Drive on the Site and
Landscape plans.) On the east side (northbound), the pullout should be directly
in line with the walk that leads to the primary entrance. Both pullouts should be
designed in accordance with the City's "Transit Design Standards and
Guidelines."
16. On sheet 3 of 5, note number 18, please clarify that this standard also applies to
the existing trees located on the Harmony House parcel. For purposes of tree
pruning, the Harmony Houses is not an "outparcel."
1
Commi- _ry Planning and Environmental _rvices
Current Planning
City of Fort Collins
Mr. Bruce Hendee and Angie Milewski
B.H.A. Design
4803 Innovation Drive
Fort Collins, CO 80525
Dear Bruce and Angie:
January 12, 1998 f
The following comments are offered on Harmony Technology Park, First Filing,
Celestica, Phase One:
1. Please provide installation specifications for the nitrogen tank to the Ron
Gonzales, Poudre Fire Authority, Fire Prevention Bureau.
2. If high -pile storage is to be used, then Article 81 of the Uniform Fire Code must
be followed.
3. A list of hazardous materials expected to be used and stored on a site must be
submitted to Poudre Fire Authority. Storage must comply with the Uniform Fire
Code and Chapter 9 of the 1991 Uniform Building Code. Please contact Ron
Gonzales, Poudre Fire Authority, for further information.
4. On the plat, be sure that all areas within the 80 foot setback area that are
needed for utilities, access, and drainage is contained within a dedicated
easement wide enough to accommodate all facilities with adequate separation.
5. It is suggested that Light and Power prepare an estimate of where the
streetlights will be installed on C.R. #9 and Harmony Tech Parkway. (CDOT
provides lighting on Harmony Road.) Keep in mind that deciduous shade trees
must be kept 40 feet (horizontal distance along a public street frontage) and
ornamentals 15 feet away from streetlights.
6. Off -site grading easements are needed for the proposed grading of Technology
Parkway that is outside the public right-of-way.
7. Please be sure to clarify on the Utility Plans that Phase Two is shown as a
Preliminary Design only and will not be constructed with these plans.
8. Be sure that the trash storage areas are large enough to accommodate
recyclable materials.