HomeMy WebLinkAboutHARMONY TECHNOLOGY PARK, 1ST, CELESTICA - FDP - 12-97B - CORRESPONDENCE - REVISIONSJAN-26-99 12.09 FROM.YOUNC•NRICHT 969-3522 ID. PACE 2/25
Young+Wright
Memorandum Archhocu Inc.
,f
To City of Fort Collins Community Planning and Environmental
Services
From Robert 0. Macpherson, Associate
Re Celestica Colorado
Date January 26, 1998
172 SL George Sweet
lob No. 9704fi Toronto, Ontario
M5R 2M7
TEL: 41 &%8-3522
FAX: 416r96o.o172
We have prepared a point by point response to the City of Fort Collins Community Planning and
Environmental Services Staff memo, dated January 13, 1998. Each number below corresponds
to the Staff memo comment numbers; items not responded to below will be addressed by BHA
Design under separate cover.
1. At present, Celestica is studying options for nitrogen supply, with the preferred solution
being a nitrogen production plant and an adjacent storage tank. We are advised that
installation specifications will be submitted to the City of Fort Collins with the building
permit application.
2. High Pile storage is anticipated. The building design for the area containing high pile
storage will conform with Article 81 of the Uniform Fire Code.
3. Celestica Colorado has prepared a list of hazardous materials expected to be used and
stored at the site, identified in a memo dated November 11, 1997, with an addendum
memo "Chemical Usage for New Building", dated January 21 1998; both documents are
attached.
8. All garbage and recycling processes will be located in the building interior. There will be
sufficient space allocated to recycling requirements in the final design.
10. The building will be designed in accordance with the City of Fort Collins Non-residential
Energy Code (ASHRAE 90.1 with locally adopted amendments).
Please advise if we can provide any further information or clarification of the above.
copy Vidya Welling, Celestica Inc. 1448 5663
Angie Milewski, BHA Design Inc. / 970 223 1827
design
height. The maximum building height has been defined as 39'-6" to allow
for parapet walls as necessary to screen any rooftop mechanical equipment.
12. Done.
13. Done.
14. A note has been added to both the Site and Landscape Plans.
15. The transit stops have been indicated on the Site Plan.
16. Done.
17. Done.
18. Done.
19. Done.
Please feel free to call if you have any questions or need additional information.
Sincerely,
bh ign inc. by
Bruce A.
January 26, 1998
Mr. Ted Shepard
City of Fort Collins Planning
281 N. College Avenue
Fort Collins, CO 80521
RE: Celestica Colorado Drawing Revisions
Dear Ted,
Thank you for your comments of January 12, 1998, and your additional comments
over the phone. We have addressed many of the comments through our revisions to
the Final Compliance Plans. Outlined below is a response to specific items
mentioned in your letter relating to planning comments. Attached is a separate
letter from the architects relating to your comments on the architecture. Our
response numbers correspond with your letter number.
1-3 These comments are addressed in a separate letter from Young+Wright
Architects.
4. All specified uses have been contained within dedicated easements shown
on the plat.
5. We have added a note to the landscape plan (Sheet 3 of 6) specifying the
required separations from streetlights as they are located.
6. All grading in this area is contained within the right-of-way or easements
illustrated on the plat.
7. Done.
8. This comment has been addressed in a separate letter from Young+Wright
Architects.
9. Accessible routes of travel have been illustrated on the site plans (Sheets 1
and 2). Slopes in these areas meet the specified requirements and
crosswalks are designated where necessary.
10. This comment has been addressed in a separate letter from Young+Wright
Architects.
11. We have adjusted the building height to specifically indicate the proposed
design