Loading...
HomeMy WebLinkAboutHARMONY TECHNOLOGY PARK, 1ST, CELESTICA - FDP - 12-97B - CORRESPONDENCE - TRANSPORTATION ISSUE (8)THE SEAR -BROWN GROUP p FULL -SERVICE DESIGN PROFESSIONALS pUG 1 FORMERLY RBD, INC. 209 SOUTH MELDRUM FORT-COLLINS, COLORADO 80521-2603 970-482-5922 FAX: 970-482-6368 August 6, 1998 Mr. Ted Shepard City of Fort Collins Planning 281 N. College Ave Fort Collins, CO 80521 Re: Harmony Road Design for Harmony Technology Park First Filing Dear Ted, To date we have met with the City of Fort Collins engineering staff and the Colorado State Department of Transportation a number of times and received very good guidance and cooperation. There is only one issue that we feel concerned about, and that is the configuration of the right turn lane and bicycle path crossing prior to Technology Parkway. This has been under discussion many times and presently we are showing the design as requested by City of Fort Collins staff. I recently showed the design to Hewlett Packard and Celestica and at this time everyone felt that we should voice our concern about this crossing. We all feel that there are inadvertent difficulties for both the cyclist and the car driver with this configuration and at this point in time we are only bringing this up as a concern for the bicyclists safety If there any questions, please contact me immediately. Yours Sincerely The Sear -Brown Group JirrI6 Allen -Morley, P.E. Project Manager Cc: John Hankey Hewlett Packard Vidya Welling Celestica Robert MacPherson Young and Wright Tom Peterson Blackfox Realty Kevin Oliver Celestica NEW YORK • PEN NSYLVANIA. COLORADO•UTAH STANDARDS IN EXCELLENCE EQUAL OPPORTUNITY EMPLOYER