HomeMy WebLinkAboutHARMONY TECHNOLOGY PARK, 1ST, CELESTICA - FDP - 12-97B - CORRESPONDENCE - TRANSPORTATION ISSUE (8)THE SEAR -BROWN GROUP p
FULL -SERVICE DESIGN PROFESSIONALS pUG 1
FORMERLY RBD, INC.
209 SOUTH MELDRUM
FORT-COLLINS, COLORADO 80521-2603
970-482-5922 FAX: 970-482-6368 August 6, 1998
Mr. Ted Shepard
City of Fort Collins Planning
281 N. College Ave
Fort Collins, CO 80521
Re: Harmony Road Design for Harmony Technology Park First Filing
Dear Ted,
To date we have met with the City of Fort Collins engineering staff and the Colorado State
Department of Transportation a number of times and received very good guidance and
cooperation. There is only one issue that we feel concerned about, and that is the configuration
of the right turn lane and bicycle path crossing prior to Technology Parkway. This has been under
discussion many times and presently we are showing the design as requested by City of Fort
Collins staff.
I recently showed the design to Hewlett Packard and Celestica and at this time everyone felt that
we should voice our concern about this crossing. We all feel that there are inadvertent difficulties
for both the cyclist and the car driver with this configuration and at this point in time we are only
bringing this up as a concern for the bicyclists safety
If there any questions, please contact me immediately.
Yours Sincerely
The Sear -Brown Group
JirrI6 Allen -Morley, P.E.
Project Manager
Cc: John Hankey Hewlett Packard
Vidya Welling Celestica
Robert MacPherson Young and Wright
Tom Peterson Blackfox Realty
Kevin Oliver Celestica
NEW YORK • PEN NSYLVANIA.
COLORADO•UTAH
STANDARDS IN EXCELLENCE
EQUAL OPPORTUNITY EMPLOYER