HomeMy WebLinkAboutHARMONY TECHNOLOGY PARK, 1ST, CELESTICA - FDP - 12-97B - CORRESPONDENCE - BUILDING EXTERIOR0 Z A R L H I T E C T U R E
Aptii 12,1999
Mr. Ted Shepard
City of Fort Collins
Planning Department
P.O. Box 580
Fort Collins, Colorado 80522-0580
RE: Celestica Colorado Harmony Technology Park
Dear Ted:
APR 151999
During our conversation relative to planning issues effecting the TCO I indicated we should not paint the
stainless steel stack. However, we would paint the two conical exhaust fans visible above the parapet over the
CUP on the west side of the building.
Subsequently I learned the exhaust housings are aluminum and should not be painted. Celestica is willing to
paint any galvanized metals which are visible above the building parapets.
Sincerely,
OZ Architecture
Bruce Dalton
cc: Robert MacPherson, Y + W
Vidya Welling, Celestica
Kevin Oliver, Celestica
Gerry Albanese, DPR
1820 E+olsom Street
Boulder, Colorado 80302
Phone 303.449.8900 fax 303.449.3886
0 E N U E B • B 0 U L 0 E B • S U M M I T C O U N T Y . C 0 L 0 B A 0 0 S P R I N G S
0 Z A R C H I T E C T U R E
April 20, 1999
Mr. Ted Shepard
City of Fort Collins
Planning Department
P.O. Box 580
Fort Collins, Colorado 80522-0580
RE: Celestica Colorado, Harmony Technology Park
Dear Ted:
APR 21 1999
This is confirm our telephone conversation on Thursday, April 15, 1999 that it is acceptable to apply an
oxidizing chemical to the two conical exhaust fans visible above the parapet over the CUP on the west side of
the building.
We propose this process to accelerate the natural oxidation which will occur over time. This is preferred by
Celestica vs. painting which would be a continuous maintenance issue.
Sincerely,
OZ Architecture
Bruce Dalton
cc: Robert MacPherson, Y+W
Vidya Welling, Celestica
Kevin Oliver, Celestica
Gery Albanese, DPR
O E N V E 0 • B 0 U L U E B. S U M M I T C 0 U N T Y. 1 0 L 0 B A 0 0 S P R I N G S