HomeMy WebLinkAboutHARMONY TECH. PARK 3RD AMENDED ODP - 12-97F - SUBMITTAL DOCUMENTS - ROUND 1 - PROJECT NARRATIVEwqFOFw"p""
,j i
RA•W1.Y ne.a�erla(e fYl
' � nrvu ua.'rt,e..>tra
.ni.... tilu•r y
I WArr m
I�IJA fAKi 11/ fIB IO
I
lvu=
� {� J fI j f •rvu �y.J •�:�
Ayi..
,
11 i 4\Y j
Morningside Village
It kk^tRAt" MAN
0 South Harmony LLC
Morningside Village
Harmony Technology Park Third Amendment
21 June 2005
"K -C10"K
It I ern.
EXHIBIT A
RESTON
ENTER
. .-IlERSTypP •� ,
WILDWOO ��
SUBDIVISIO4
(3.0 G—Dx ,
4.0 NO Di -fly) ]jjj
c-1
ID
EXISTIN SIGNALIZED _
INTERBECT ION
PR�PGs��,
TF SKLT-LTrt
[R
1 Str 11F D PY USL ''
E xAHsa
TRI.L;L
SNELJER
,
l
,
LELESTICA COLORADO
.,.
I
32.0 ACRES
�,
�
E
HARVEST PARK (3
SUBDIVISION..
14AI Ow Denary
5.w NW Hyl
ODP PLAN
PARCEL C OARY, TYP.
•
D FULL TURN
MRRMCTON
•
E IC RDAD
ACC96W
,
•
1
•
C.
1
.
.•.
.
PRIMARY. USES
CONDARY
•
34.98 ACRES
0.35 FAR
Q
�y
USES
•
533,000 S.F.GFA)
Y
FIROPOSED FULL TURN/56NAL
INTERSECTION
1 —39 A
\ 1 •
R.I�eFORI°Anw
• �.» PONi
INYIi.M
IRON.M LLRRM
/ U • tines Ho4o MNLG'BG
i0 tl11W
FUTURE PUBLIC ROAD
E%iEN510N
• Rio �sri�cim lue�+
Is Is Is 0
�<YMWR AM I60RveLOR,
•
E '
f'o
E PRIMARY USES 75.6 ACRES •
0.35 FAR
1,150,000 S.F. GFA) •
?5 u
....E
• wig.
•
kftrlh • A • • L
FUTURE
FULL TE"'HI tJAL
I.11QCTGN
HA
SEcoNDARYD7' 825Ac.
PRIMARY USES 3.5S AC.
I IAACII 04 FAR
('L I53.0 a.0,N •
• • • • •
a NEIG BCfRHOOD
NON-USESENTIAL
o
BETWEEN
RETAIL
7.57 ACRES
J
tJ
0.35 FAR
•^
z
EMPLOYME
AND LMN
/-115,00E AF-GFN °:rn.
BIBB
�-- FDLPNPBOSBD
MTERBECTICN
ROCK CREEK DRIVE 101
(COLLECTOR S1REE1)
CDF_` EXISTING TREE, TYPICAL
FOSSIL RIDGE HIGH SCHOOL
• PRIMARY SES
11.9 A
0,3 FAR
Is
•
t;I--
tECONDARY U
11.7 ACR
• 1BDU/ C
• (+7- 2k Unih)
0 • •
. J
SECONDARY USES
• 13.5 ACRES
18 DU/AC
• (+/- 240.Unifs)
R liWT-INAFIC NT OUT
INTERSECTION
IY ROAD (STATE HI
1 \ •
PRIMARY US
19.7 ACRES
0.3 FAR•
260,009 S.F.
•
M '•
SECONDARY USES)
76A ACRES (1) •
(, /- 42 Unih) ( •
i
SECONDARY USES
(+/ 200 Units)
VILLOW BROOK
SUBDIVISION
0 a.Rw l R I FOP
4.9 Dw .
R1 W 0.I:IY,
DU7AC)
PART
� EaouNoaFZY
URA LLD InECES
BUFFER
fROM C.RfRI
L :9 ACRES
.�IRfI )/tif�
k '
Oz
SECONDARTs
USES I u
14. D ACRES.I
18 DU/AC
(+/- 250 Units'
DRAINAGE&
DETENTION
AREA
2 84 ACRE:
- J
"
s^uI 1°- z o of
PRIMARY USES
ACCESSORY USES
LEGEND
FR AARY USES INCLUDE THE FCU.0WING TYPES Of USES:
ACCESSORY USES SHNL BE NLOWED N'IIHIN THE PRIMPRT USE AREAS. ACCESSORY USES
D I W 200 400'
RESEARCH FO IUTIES, TESTING LABORATORIES, OFFICES AND OTHER FACILITIES FOR RESEARCH AND DEVELOPMENT, INDUSTRIAL USES,
USES THAT AR,UUE SSUPKMNTA O9EHL Y U FFE SFIOP'JR SIMILAR $PIRA-'EIRE'FNL
%NORTH
ODF BWNDORY
HCSRTNS, CLINKS, NURSING NNB PERSONA CJJR fACDTIES, PE010NAL Y MU A &ISINE55 OR PRIVATE SCHOOLS AND
• • •
• PEDESTRw+/ BKYCIf CIRCULATION
UNNERSTDE5,FINANCE,INSURANCE, NRD REAL ESTATE SERNCES, PROFESSIONA OFFICES, AD OTHER USES Cf SWILAR CHARACTER, A5
NOTES
DRERMNED BY THE RAaNMG AND ZONING BOND.
O0 0O
PROPOSED OFF.SDEET 1RAR
P8Rw col
f—CITY 4Fo CJIImd
SECONDARY USES
MINIMUM DENSITY FOR PESDENTEC USES SHAL BE 7 UNIR PRACK.
PH.' Rai' R )
MN3MUM BUILDING HfK,HR fCR ALL NON-Pf51DENTA USES SHELL BE SIRI61 STORES.
PROPOSED RIBLIC STREET
SECCMDAELY USES INCLUDE SINGLE FAWLY AND MULT FAMILY DWEIUI GS, LODGING ESTPBUSHMENTS, COMYNTION AND CONFERENCE
MAR IU, BUIIOING HEIGHT TOR RESIDEIITA USES VIAL BE THREE (3) STCRE5.
CENTER, COMMUNm SHCFII CENTERS, BED AND BREAKFAST ESTABILSf1MEN15, RACES OF WORSHIP AND ASSEMBLY, STANDARD
AF.STNXWITS,HEKRRORFIOOD CCNWNRNCE SHORING CBMERS, LCMGTERMCAR FA31,111ES, CHIED CENTERS, ATHLETIC CLUBS, AID
WATER WILL BE PRONUED BY THE CITY OF FORT CCWNS AND THE SNIiARY SEWER
INDICATES ARFAAEIDED WITH
1UBUC AND FPF7ATE SCHOOLS FOR ELEMENTARY, RINCR HIGH AD HIGH SCHM EEOCATFCN.
SERMCE WILL BE PRONDED BY THE FORT CMNS LOVEL,WD SANITATION EESTRCT.
SECCND AMENDMENT
fil
—MORNINGSIDE
VILLAGE
(BROOKFIELD
SUBDIVISION)
RP l rL�
ld@T'A PART - 1`I1" \ O 111
•
OVERALL DEVELOPMENT PLAN
HARMONY TECHNOLOGY PARK
r"1FR[--> AME"(-->N\EtVT
C>\/EF ^LL CDEVELOPNAE1VT PLAN
FORT COLLINS,COLORADO
8HA OESIGN. INC. • 4eW I.AI OL ®R. COWILti CG »515 8 TIs.M70)=3-757i
design
S H E E T 1 O F 1
JIJ"E 2005
BHA Design Incorporated
4803 Innovation Drive
Fort Collins, CO 80525
Since this is a simple amendment to an approved ODP rather than a full Overall Development
Plan request, we would like to request a waiver to application items that are not applicable to
' - our request:
1. Transportation Impact Analysis - The proposed request for a land use change would
not affect or impact the surrounding street patterns or classifications as defined at the
ODP level. As such, we would like to request a waiver of the requirement for a
Transportation Impact Analysis normally required with a full ODP application.
2. Neighborhood Meeting - Since the ODP has been previously approved with full public
comment, and the proposed request is minor in nature and would result in a de -
intensification of land use, we would like to request a waiver of the requirement for a
neighborhood meeting typically required with a full ODP application. The final
decision will be made during a public hearing which would allow for public input prior
to approval of the ODP amendment.
3. Utility and Drainage Plans, Drainage Report - As we have previously discussed with
you, we are not including copies of the utility or drainage plans or drainage report.
These documents have previously been approved and would not be changed with the
proposed amendment.
4. Conceptual Review Letter - The need for a Conceptual Review meeting was waived
previously.
We appreciate the assistance you have provided us through the preparation of this ODP
Amendment request. Please feel free to contact us if you have any questions or need additional
information.
Sincerely,
For BHA Design, Inc.
Angela K. Milewski
Attachments: Exhibit A
Application Form and Fee
APO list
Revised CDP Plan (Sheets 1 and 2)
Legal Description
Name and address of property owners
List of general and limited partners
Development phasing schedule
970
1.-i. 470 123 IE2'
landscape architecture I planning I urban design wwat bl UGeS:; n rcn'
BHA Design Incorporated
4803 Innovation Drive
Fort Collins. CO 80525
Governing Documents
Development within the Harmony Technology Park Overall Development Plan is governed by
' several documents which will ensure a high level of continued development oversight. These
include the Land Use Code, a separate subarea plan (Harmony Corridor Plan), and the
existing Overall Development Plan.
Compliance with Standards
Overall Development Plan Standards - The development application complies with the Overall
Development Plan standards of Section 2.3 of the Land Use Code with the exception of the
waivers noted below. The densities requested meet the minimum of 7 du/acre as required
within the HC zone district (2.3.2.H.2.f.). The ODP complies with the Master Street Plan
requirements and required transportation connections (2.3.2.H.3 & 4) as no change has been
made to the access or street configuration from the previously approved ODP. Previously
identified natural features within the boundaries including the drainage corridor along the east
edge of the property remain intact and are not affected by the proposed change in land use
(2.3.2.H.4). The ODP is consistent with the overall Drainage Basin Master Plan and has not
been changed from the previously approved ODP (2.3.2.H.6). The overall housing density for
the entire ODP area will continue to meet the Land Use Code requirements (2.3.2.H.7).
Parcel M will meet the requirements of Section 4.21 Harmony Corridor District of the Land Use
Code. More specifically, it will meet the requirements of 4.21.D.4 by providing a minimum
average density of seven dwelling units per net acre of land. In addition, 4.21.D.5 will be met
by providing a minimum of two housing types from the following allowed list: single family
detached dwellings, single-family attached dwellings, two-family dwellings, multi -family
dwellings, group homes or mixed -use dwellings. In addition, if single family detached housing
is proposed, at least an equivalent number of single-family attached housing, two-family
dwellings or multi -family dwelling units (or combination thereof) will also be provided. Finally,
the parcel will meet the requirements of 4.21.D.6 by ensuring that at least 90% of the
dwellings will be located within one -quarter mile of either a neighborhood park, a privately
owned park or a central feature or gathering place. These requirements will be met as the
parcel is developed under the site -specific Project Development Plan process.
In addition, the proposed amendment will achieve appropriate City Plan Principles and
Policies. By providing a cohesive neighborhood with a mixture of housing types, the plan helps
to provide a 'reasonable balance' ... 'between housing demand created by growth in lower
income jobs and residential development capacity' (Policy ECON-1.4). It also meets Housing
Policies including HSG-1 .1-Land Use Patterns by providing a 'variety of housing and densities,
including mixed -use developments that are well -served by public transportation and close to
employment centers, services and amenities'.
Property Owners' Consent
The applicant is in the process of contacting all property owners within the ODP. A copy of the
application proposal will also be circulated to the property owners and letters of consent will be
obtained prior to the public hearings.
Request for Waivers
voice: 970.223.7577
fax:970.223.1827
landscape architecture I planning I urban design www.bhadesign.com
4w-
BHA Design Incorporated
4803 Innovation Drive
Fort Collins, CO 80525
22 June 2005
Mr. Ted Shepard
Current Planning Department
City of Fort Collins
281 North College Avenue
Fort Collins, CO 80521
RE: Harmony Technology Park
Overall Development Plan — Third Amendment
Dear Ted,
We are pleased to submit the following amendment to the approved Harmony Technology
Park Overall Development Plan (ODP). The proposed amendment would change the use
classification of a 10-acre parcel of land identified as Parcel M from Primary to Secondary use.
This change is being requested on behalf of Chateau Development in the process of planning
for future phases of the Morningside Village residential community located within the ODP.
Parcel M is the fifth and last phase of the Morningside Village development.
Results of Change
The change in land use would result in a minor increase in the amount of secondary use
designated for the overall ODP in that Parcel M constitutes only 3.4 percent of the 270-acre
ODP area. Although the amount of secondary use would exceed the 25% maximum stipulated
on the ODP for secondary uses, we believe this change would result in a more cohesive
neighborhood framework that retains the largest, principal areas within the ODP for primary
employment centers.
We have included a diagram with our submittal that shows the locations of primary and
secondary uses within the ODP area as it relates to the proposed change. As currently
planned, Parcel M is a small, isolated, primary use parcel surrounded on three sides by
secondary uses. As a result, its size and location are simply not conducive for larger
employment uses.
Furthermore, by allowing secondary uses on Parcel M, a neighborhood of mixed use and/or
mixed density uses can more fully develop as a transitional neighborhood between the primary
employment and expected higher density uses along Harmony Road and the lower density
LMN residential uses of Observatory Village to the south.
Morningside Village is a custom home quality condominium and townhome community.
Chateau Development seeks to build on its previous success with this development and
continue to build high quality maintenance free housing opportunities for the professional
community employed within and around the Harmony Technology Park now and in the future.
The proposed land use change would forward this goal and would result in no change to the
overall character of or planning objectives for the Harmony Corridor area.
landscape architecture I planning I urban design
voice: 970.223.7577
fax 970.223.1827
www.bhadesign.com