I. INTRODUCTION
This transportation impact study addresses the capacity,
geometric, and control requirements at and near proposed developments
known as the Harmony Technology Park, Imago/Brookfield, and Willow
Brook. Collectively, they are referred to as the Harmony Technology
Park Amended ODP. They are located near the intersection of Harmony
Road and CR9 in Fort Collins, Colorado.
During the course of the analysis, numerous contacts were made
with the project planning consultants (BHA Design and Nuzar Kopatz),
project engineer (TST), the owners/developers, and the Fort Collins
Traffic and Engineering Staff. This study generally conforms to the
format set forth in ,the Fort Collins transportation impact study
guidelines. As was agreed to in various meetings, this transportation
impact study addresses issues related to the amended ODP as well as
PDP's for Willow Brook, Brookfield, and Imago. The study involved the
following steps:
- Collect physical, traffic, and development data;
- Perform trip generation, trip distribution, and trip assignment;
- Determine peak hour traffic volumes;
- Conduct capacity and operational level of service analyses on key
intersections;
- Analyze signal warrants;
- Conduct level of service evaluation of pedestrian, bicycle, and
transit modes of transportation.
1
LIST OF FIGURES
Figure
Page
1.
Site Location ........................................
3
2.
Recent Peak Hour Traffic .............................
4
3.
Recent Balanced Peak Hour Traffic ....................
5
4.
Site Plan ............................................
10
5.
Trip Distribution ....................................
12
6.
Short Range Background Peak Hour Traffic .............
13
7.
Long Range Background Peak Hour Traffic ..............
14
8.
Short Range Site Generated Peak Hour Traffic .........
15
9.
Long Range Site Generated Peak Hour Traffic ..........
16
10.
Short Range Total Peak Hour Traffic ..................
17
11.
Long Range Total Peak'Hour Traffic ...................
18
12.
Short Range Geometry .................................
26
13.
Long Range Geometry ..................................
29
APPENDIX
A Recent Peak Hour Traffic
B Current Peak Hour Operation
C Level of Service Descriptions
D Signal Warrants
E Short Range Background Traffic Operation
F Long Range Background Traffic Operation.
G Short Range Total Traffic Operation
H Long Range Total Traffic Operation
I Pedestrian Level of Service Worksheet
TABLE OF CONTENTS
Page
I.
Introduction .........................................
1
Ii.
Existing Conditions ..................................
2
Land.Use.............................................
2
Roads................................................
2
Existing Traffic .....................................
2
Existing Operation ...................................
6
Pedestrian Facilities ................................
6
Bicycle Facilities ...................................
6
Transit Facilities ...................................
6
III.
Proposed Development .................................
8
TripGeneration ......................................
8
Trip Distribution ....................................
11
Background Traffic Projections .......................
11
Trip Assignment ......................................
11
Signal Warrants ......................................
11
Operation Analysis ...................................
11
Pedestrian Level of Service ..........................
19
Bicycle Level of Service ..............................
30
Transit Level of Service .............................
30
IV.
Conclusions ..........................................
31
LIST OF TABLES
Table
Page
1.
Current Peak Hour Operation ..........................
7
2.
Trip Generation ......................................
8
3.
Short Range Background Traffic
Peak Hour Operation ...
20
4.
Long Range Background Traffic
Peak Hour Operation ....
21
5.
Short Range Total Traffic Peak
Hour Operation .........
23
6.
Long Range Total Traffic Peak
Hour Operation .........
27
HARMONY TECHNOLOGY PARK AMENDED CDP
(IMAGO, BROOKFIELD, AND WILLOW BROOK)
TRANSPORTATION IMPACT STUDY
FORT COLLINS, COLORADO
FEBRUARY 2000
Prepared for:
Chateau Development Company
8101 E. Prentice Avenue, Suite 815
Englewood, CO 80111
Prepared by:
MATTHEW J. DELICH, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061
FAX: 970-669-5034