Loading...
HomeMy WebLinkAboutHARMONY TECH. PARK AMENDED ODP - 12-97C - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYt FT. COLLINS J G - (3 1" = 3000 �Q t - I � TIMNATH O t I t r t d C0 SITE LOCATION Figure I 3 I. INTRODUCTION This transportation impact study addresses the capacity, geometric, and control requirements at and near proposed developments known as the Harmony Technology Park, Imago/Brookfield, and Willow Brook. Collectively, they are referred to as the Harmony Technology Park Amended ODP. They are located near the intersection of Harmony Road and CR9 in Fort Collins, Colorado. During the course of the analysis, numerous contacts were made with the project planning consultants (BHA Design and Nuzar Kopatz), project engineer (TST), the owners/developers, and the Fort Collins Traffic and Engineering Staff. This study generally conforms to the format set forth in ,the Fort Collins transportation impact study guidelines. As was agreed to in various meetings, this transportation impact study addresses issues related to the amended ODP as well as PDP's for Willow Brook, Brookfield, and Imago. The study involved the following steps: - Collect physical, traffic, and development data; - Perform trip generation, trip distribution, and trip assignment; - Determine peak hour traffic volumes; - Conduct capacity and operational level of service analyses on key intersections; - Analyze signal warrants; - Conduct level of service evaluation of pedestrian, bicycle, and transit modes of transportation. 1 LIST OF FIGURES Figure Page 1. Site Location ........................................ 3 2. Recent Peak Hour Traffic ............................. 4 3. Recent Balanced Peak Hour Traffic .................... 5 4. Site Plan ............................................ 10 5. Trip Distribution .................................... 12 6. Short Range Background Peak Hour Traffic ............. 13 7. Long Range Background Peak Hour Traffic .............. 14 8. Short Range Site Generated Peak Hour Traffic ......... 15 9. Long Range Site Generated Peak Hour Traffic .......... 16 10. Short Range Total Peak Hour Traffic .................. 17 11. Long Range Total Peak'Hour Traffic ................... 18 12. Short Range Geometry ................................. 26 13. Long Range Geometry .................................. 29 APPENDIX A Recent Peak Hour Traffic B Current Peak Hour Operation C Level of Service Descriptions D Signal Warrants E Short Range Background Traffic Operation F Long Range Background Traffic Operation. G Short Range Total Traffic Operation H Long Range Total Traffic Operation I Pedestrian Level of Service Worksheet TABLE OF CONTENTS Page I. Introduction ......................................... 1 Ii. Existing Conditions .................................. 2 Land.Use............................................. 2 Roads................................................ 2 Existing Traffic ..................................... 2 Existing Operation ................................... 6 Pedestrian Facilities ................................ 6 Bicycle Facilities ................................... 6 Transit Facilities ................................... 6 III. Proposed Development ................................. 8 TripGeneration ...................................... 8 Trip Distribution .................................... 11 Background Traffic Projections ....................... 11 Trip Assignment ...................................... 11 Signal Warrants ...................................... 11 Operation Analysis ................................... 11 Pedestrian Level of Service .......................... 19 Bicycle Level of Service .............................. 30 Transit Level of Service ............................. 30 IV. Conclusions .......................................... 31 LIST OF TABLES Table Page 1. Current Peak Hour Operation .......................... 7 2. Trip Generation ...................................... 8 3. Short Range Background Traffic Peak Hour Operation ... 20 4. Long Range Background Traffic Peak Hour Operation .... 21 5. Short Range Total Traffic Peak Hour Operation ......... 23 6. Long Range Total Traffic Peak Hour Operation ......... 27 HARMONY TECHNOLOGY PARK AMENDED CDP (IMAGO, BROOKFIELD, AND WILLOW BROOK) TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO FEBRUARY 2000 Prepared for: Chateau Development Company 8101 E. Prentice Avenue, Suite 815 Englewood, CO 80111 Prepared by: MATTHEW J. DELICH, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Phone: 970-669-2061 FAX: 970-669-5034 U°� .n c.c� �'1 �• �y4