intersection.
K.5. Our intention is that the entire right-of-way and 9' utility easement
are to be located outside of these adjacent properties. We have
revised this concept detail to read as such.
K.7. Since our last submittal, we have been informed that water service
will be provided by the City of Fort Collins, and the Fort
Collins/Loveland Water and Sanitation District will provide sewer
service. We have revised the drawings to reflect this.
All other comments were noted or addressed in full on the ODP plans. Please feel
free to call if you have any questions or need additional information.
Sincerely,
bha de gn inc. by
Angela . Milewski
design
August 8, 2000
Mr. Ron Fuchs
City of Fort Collins Current Planning
281 North College Avenue
Fort Collins, CO 80521
RE: Harmony Technology Park Amended ODP
design
LANDSCAPE ARCHITECTURE
URBAN DESIGN
PLANNING
BHA DESIGN. INC.
4803 INNOVATION DRIVE
Dear Ron, FT. COLLINS, CO $0525
TEl 970 273•7527
FAX 970 223•1127
Thank you for your comments on the Harmony Technology Park Amended ODP, as
well as your efforts to meet with us to discuss specific comments. We have revised
the drawings based on redlines and comments received. All redlines have been
addressed in full with the following exceptions or clarifications:
Response to 7/19/00 comment letter:
Comment # Response
J.La. We have revised the Alternative Compliance Plan and ODP Plan to
illustrate future street connections to the adjacent development
south of Rock Creek Drive. We have also revised the `private' drive
notations (adjacent to the Hewlett-Packard parcel) to instead read as
`transportation access points'. This reflects the design of this parcel
currently proceeding through the Pilot Process. These points of
access will provide connections through the development by way of
internal parking lot accesses, while still allowing for the `campus'
layout of the Harmony Corridor Plan.
K.3. We have revised the Alternative Compliance Plan arrows along
Rock Creek Drive east of Cambridge as discussed in the July 28,
2000 meeting. We have shown the connection to the north of Parcel
N as requested. We are no longer requesting alternative compliance
for Rock Creek Drive west of Cambridge since we are now showing
the future street connections to the adjacent developable parcel in
this area. We have added a request for alternative compliance at
Harmony Road as per your comments. We are also requesting
alternative compliance for the e/w road south of the county
properties in order to accommodate the existing developed homes in
this location. We have explained in the request that this situation is
different that the road location north of the county properties, since
that future road location is based on the requirement by Traffic
Operations for adequate safe separation from the Harmony Road