Loading...
HomeMy WebLinkAboutHARMONY TECH. PARK AMENDED ODP - 12-97C - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEW10. The Current Planning Department offers the following comments: a. This development request will be subject to the Development Review Fee Schedule that is available in the Current Planning Department office. The development review fees are due at the time of submittal of the required Project Development Plan and compliance phases of the development review by City staff and affected outside reviewing agencies. b. Prior to application, all areas within the site shall be annexed into the city and will be located in the HC, Harmony Corridor District. c. Division 2.3 Overall Development Plan shall be addressed. d. Tree location and protection will be required in accordance with Section 3.2.1(F) of the Land Use Code. e. Street Concerns: 1. LUC Section 3.6.3(A)-(F) requires that the local street system provide multiple direct connections at intervals not to exceed six hundred sixty (660) feet to provide a street grid pattern of through streets to facilitate traffic movements. Streets shall connect to other streets within a development and to existing and future streets outside the development to facilitate the satisfactory future division of adjoining land and to serve parks, schools or other public and private lands within a neighborhood. a) Additional streets need to be provided along the perimeter of the project to tie the overall development into the street system. b) The street system needs to provide for both intra- and inter -neighborhood connections to knit developments together (i.e. street connections to future streets and future developable lands). c) The collector street adjacent to the south property line shall align into Rock Creek Drive as it intersects Timberline Road (Harvest Park Project Development Plan). d) The burden is with the applicant to provide a written justification for alternative compliance. f. All street, pedestrian, bike corridors and mid -block connections shall be accommodated and connect to adjacent and proposed facilities, please contact Kathleen Reavis of Transportation Planning. g. Delineate all property lines and all rights -of -way, sidewalk widths and improvements on all plans. h. The application needs to address Division 3.7 Compact Urban Growth Standards of the Land Use Code. i. The burden of demonstrating compliance with all Land Use Code and Harmony Corridor Plan criteria is with the applicant. j. A neighborhood meeting needs to be held for the overall development plan proposal prior to formal submittal of the request (Section 2.2.2 of the LUC). Please contact Ron Fuchs of this office to assist you in the scheduling of this meeting. k. All modifications to code standards will be reviewed by the Planning and Zoning Board. 11. Janet Meisel -Burns from Parks and Recreation offers the following: a. Need to comply with all park dedication parameters as outlined in the Land Use Code. b. The standard Neighborhood Park and Community Park fees will apply to this project (Ordinance No 205, 1998). c. Possible Future Community Park note shall be removed. c. Coordinate all park concerns with Parks and Recreation. -t f. All street, pedestrian, bike corridors and mid -block connections shall be accommodated and connect to adjacent and proposed facilities. 5. The Natural Resources Department offers the following comments: a. Delineate all natural features, as defined in the Land Use Code. b. Show existing trees (including species and diameter) and designate whether they are to remain or be removed. Tree protection will be required in accordance with Section 3.2.1(F) of the Land Use Code. c. An ecological characterization study is required. Please call to set parameters of study. d. Accommodate potential trail access corridors through Parks and Recreation Planning. e. You will need to file a fugitive dust control permit and coordinate this through the Larimer County Environmental Health Department. Please contact them directly. f. Provide adequate dumpster and trash enclosure area to accommodate a recycling container(s) (see attachment). g. One trash hauler should be used to minimize traffic impact as well as impact on the roads. h. Native grasses and plant materials should be used wherever appropriate and bluegrass should be minimized. 6. Fire Department: a. Maximum hydrant spacing is 600' (300' maximum structure distance from hydrant) with a flow rate of 1,500 gallons per minute at 20 psi. b. Hazardous Materials study is required. c. All addresses shall be visible from a public way. d. Align street names to others. e. Please contact Ron Gonzales with Poudre Fire Authority to discuss these requirements. 7. Water/Wastewater: a. Existing Mains: 16 inch water and 30-inch sewer in Harmony: services shall be looped. b. All applicable water rights, conservation standards, et cetera apply to this development. c. Coordinate infrastructure needs through the Water and Wastewater Utility Department. 8. Light and Power offers the following comments: a. Three phase electric available in County Road 9. b. All electrical services are to be located within street not an alley/private drive. c. The applicant/developer shall acquire all necessary access corridors/easements. d. The normal electric development charges will apply upon development. e. Coordinate all utility locations with Light and Power. 9. Advance Planning offers the following: a. The application shall comply with the Land Use Code and Harmony Corridor Plan. b. The street system needs to comply with the 660' grid system connectivity standards including the needed intra- and inter -neighborhood connections. c. Plans need to reflect primary and secondary use(s). d. Need to explore shared access provisions. c. The development must comply with all applicable Administration Standards of Article 2 and the General Development Standards as set forth in Article 3 of the Land Use Code. d. All properties shall be annexed into the city. 2. Stormwater Utility offered the following comments: a. This site is located in the McClellands/Mail Creek drainage basin where the new development fee is $3,717/acre and they are based on the runoff coefficient reduction. The is site is in inventory grid #14Q. b. The outfall to Fossil Creek Reservoir Inlet Ditch should be provided with the next phase of development and provide a maintenance agreement between the property owners as development comes through. c. An agreement with the Fossil Creek Reservoir Inlet Ditch has been reached. d. The release rate is 0.5 cfs/acre. e. The city has completed a Master Plan Update for the McClellands/Mail Creek site in this area and is working on an agreement with the ditch company. All recommendations of this Master Plan update will need to be complied with. Please use the new rainfall criteria. f. The standard drainage and erosion control reports and plans are required with each development phase and the reports and plans must be prepared by a professional engineer registered in Colorado. Water Quality measures will need to be provided. 3. The Engineering Department offers the following comments: a. All streets shall comply with the most recent version of the Master Street Plan. b. The standard utility plan and development agreement requirements must be submitted to the City for review and approval. c. Street oversizing fees will apply to this development. Please contact Matt Baker for additional information regarding the actual fees related to your proposed development. d. A Transportation Impact Study (TIS) is required with your Development Plan submittal. To coordinate the parameters of this study, please contact Eric Bracke, the City Traffic Engineer, and Mark Jackson, City Transportation Planner. e. Roadway improvements to City standards along the property's frontage are required including all internal streets. f. Provide street connections per code requirements (approximately 660 feet). g. The alignment of Rock Creek Drive (collector) shall align with Harvest Park's entrance with County Road 9. h. County Road 9 is an arterial street until Rock Creek Drive where it becomes a minor arterial. Please provide a design for County Road 9. Should meet the major arterial street standards and comply with the Harmony Corridor. 4. Transportation Planning offers the following: a. A Transportation Impact Study (TIS) is required with your Development Plan submittal. To coordinate the parameters of this study, please contact Eric Bracke, the City Traffic Engineer, and Mark Jackson, the City Transportation Planner. b. Signalization of Harmony Road to be determined as part of the Harmony Road Access Control Plan Update (Spring 2000). c. Contact Kathleen Reavis, City Transportation Planner as this site falls within the Harmony Corridor Access Plan. d. Transfort planning issues shall be directed to GayLene Rossiter. e. The site shall meet ADA requirements. iiiiCONCEPTUAL REVIEW STAFF COMMENTS City of Fort Collins MEETING DATE: January 6, 2000 ITEM: Overall Development Plan — Harmony Technology Park ODP APPLICANT: Mr. Bruce Hendee BHA Design, Inc. 4803 Innovation Drive Fort Collins, CO 80525 LAND USE DATA: Request of an Overall Development Plan on a parcel consisting of 267 acres into primary and secondary use(s) located within the Harmony Corridor. The site is located east of the southeast intersection of County Road 9 and Harmony Road and will be reviewed as a major amendment to the existing approved Harmony Technology Park overall development plan. The comments listed below are conceptual comments based upon a preliminary plan provided by the applicant after the January 10, 2000 conceptual review meeting. The applicant is expected to apply all pertinent Land Use Code, Harmony Corridor Plan, Street Design Standards and Master Street Plan in their final design. The comments are to provide a reasonable amount of direction prior to the submittal of an overall development plan. The following comments shall not preclude staff from making additional comments in the future in regard to overall layout of the site. Current Planning Ron Fuchs 970.221-6750 Zoning Department Jenny Nuckols 970.221.6760 Engineering Department Mark McCallum 970.221.6605 Street Oversizing Coordinator Matt Baker 970.224.6108 City Traffic Engineer Eric Bracke 970.224.6062 Poudre Fire Authority Ron Gonzales 970.221.6570 Stormwater Utilities Basil Hamdan 970.221.6681 Water & Sewer Utilities Roger Buffington 970.221.6681 Natural Resources Kim Kreimeyer 970.221.6750 Light and Power Janet McTague 970.221.6700 Historic Preservation Karen MacWilliams 970.221.6376 Transportation Services Mark Jackson 970.416.2029 Transfort GayLene Rossiter 970.224.6195 Parks and Recreation Janet Meisel -Burns 970.221.6367 Advance Planning Pete Wray 970.221.6376 COMMENTS: 1. The Zoning Department offered the following comments: a. The site is located in the HC — Harmony Corridor District and the project will be regulated under the Land Use Code Section 4.21 and the Harmony Corridor Plan. b. The proposed land development will be subject to a Type 2 review. COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 241 N. College Ave. P.O. Box 580 Fort Collins, CO80522-0580 (970) 221-6750 CURRENT PLANNING DEPARTMENT deS19n as required. Streets will to be designed to meet City standards. Designs and construction plans will be submitted with each PDP as required. 10.h. We have prepared the Harmony Technology Park Amended ODP with the intent of meeting the general standards, contiguity requirements, and adequate public facilities standards in this section of the Land Use Code. We have outlined these objectives in our Statement of Planning Objectives. If you would like additional information on this matter, please let us know. 10.i. Noted. See above note. 10.j. The neighborhood meeting was held on February 23, 2000/. 10.k. Noted. All other comments were noted or addressed in full on the ODP plan. Please feel free to call if you have any questions or need additional information. Sincerely, bha desip mc. by I A - Angela . Milewski design site. The south boundary of the HTP site and proposed collector road in this location align with the proposed Rock Creek Drive alignment. 3.h. The road will be designed utilizing the City's criteria for arterials and minor arterials according to the Master Street Plan. Final design, utility and construction drawings will be submitted with the PDP submittal as required. 4.a. See note 3.d. 4.c. Noted. We will continue to remain in contact with Kathleen Reavis to understand the implications of the Access Control Plan Update when it is available. 4.d. We have spoked with GayLene Rossiter, and sent her a copy of the Conceptual Review plan. We have shown the locations of the planned transit shelters. We will locate additional shelters if they are in accordance with planned Transfort routes. 4.e. Noted. Specific design information will be submitted with the PDP as required. 4.f. Noted. Specific design information will be submitted with the PDP as required. 5.a-h We met with Kim Kreimeyer to discuss the natural resource requirements for the ODP. Based on this meeting, a Wildlife Habitat Assessment Report for the site has been prepared by Cedar Creek Associates. Existing tree, landform, and ditch locations have been shown on the ODP plan. Tree species and diameter, fugitive dust control permits, trash enclosure locations, and grass mixture information will be provided at the PDP submittals as required. 6.b. A Hazardous Materials Impact Study will be submitted as required with each PDP. 7.c. TST has met with the City regarding infrastructure requirements. The ODP utility plan reflects our understanding of the requirements. 9.a. Noted. We believe that the ODP meets these requirements. 9.b. See note 31 9.c. We have included a Land Use Table illustrating Primary and Secondary Land Uses per parcel. 10.a. Noted. Fee is included with application. 10.b. See note Ld. 10.c. Noted. 10.d. Noted. Provisions for tree protection and location, species and diameter will be provided with each PDP as required. 10.e. See notes 3.f. and 3.g. 101 See note 41. 10.g. We have shown property boundaries and proposed rights -of -way design February 29, 2000 LANDSCAPE ARCHITECTURE URBAN DESIGN Mr. Ron Fuchs PLANNING City of Fort Collins Current Planning 281 North College Avenue Fort Collins, CO 80521 RE: Harmony Technology Park Amended ODP BHA DESIGN, INC. 4803 INNOVATION DRIVE Dear Ron, FT. COLLINS, CO 80935 TEL 930 3334ST] FAX 970 333-1831 We are pleased to submit the following Amended ODP for the Harmony Technology Park project. Enclosed are the required submittal documents as well as additional items requested during Conceptual Review. I also would like to offer the following responses to items raised at or following the Conceptual Review Meeting. The responses refer to your comments by number as included in the January 6, 2000 comment letter: Comment # Response l.d. All properties within the ODP boundary were either previously annexed or are currently being annexed into the City. 2.b. Noted. Detailed information for the outfall will be provided with the Project Development Plan. 2.e. Noted. TST has met with the City regarding the Master Plan Update and has used the criteria to develop the ODP Drainage Plan. 21 Noted. Drainage and erosion control reports and plans will be submitted with each PDP as required. 3.b. Noted. Standard utility plans and development agreements will be submitted and finalize with each PDP and FCP as required. 3.d. A TIS has been submitted based on these requirements. 31 We have provided street connections based where possible on the 660' spacing criteria. The criteria have been varied where they conflict with properties under other ownership (along Cambridge Drive) or natural barriers (Fossil Creek Inlet Ditch). We have also shown varied street connections into the Hewlett-Packard property (Parcels A, B, C, and D,). These connections are similar to those approved under the original Harmony Technology Park ODP and allow flexibility for the large -footprint office/industrial uses that are anticipated for this portion of the site. 3.g. We received the master plan from Ron Fuchs of the Harvest Park