Loading...
HomeMy WebLinkAboutHARMONY TECH. PARK, HEWLETT-PACKARD - PDP - 12-97D - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYHCS: Unsignalized Intersections Release 3.2 0 a TWO-WAY STOP CONTROL SUMMARY Intersection: cambridge/imago Analyst: matt Project No.: 0045 Date: 1/4/01 AA s4eP-T East/West Street: imago North/South Street: cambridge Intersection Orientation: NS Study period (hrs) J24k) GCS Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement 1 2 3 1 4 5 6 L T R I L T R 0.25 Volume 305 75 110 95 Hourly Flow Rate, HFR 338 83 122 105 Percent Heavy Vehicles -- -- 0 -- -- Median Type TWLTL RT Channelized? Lanes 1 0 1 1 Configuration TR L T Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement 7 8 9 1 10 11 12 L T R I L T R volume 1.55 zbu Hourly Flow Rate, HFR 150 311 Percent Heavy Vehicles 0 0 Percent Grade M 0 0 Median Storage 1 Flared Approach: Exists? No Storage RT Channelized? Lanes 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach NB SB Westbound Movement 1 4 1 7 8 9 I 10 Lane Config L I LR I v (vph) 122 461 C(m) (vph) 1149 589 Vic 0.11 0.78 95% queue length 0.32 7.00 Control Delay 8.5 29.6 LOS A D Approach Delay 29.6 Approach LOS D Eastbound 11 12 HCS: Unsignalized Intersections Release 3.2 Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Phone: (970) 669-2061 E-Mail: mdelich@£rii.com Fax: (970) 669-5034 I�.2 G/V &oS TWO-WAY STOP CONTROL(TWSC) ANALYSIS HCS: Unsignalized Intersections Release 3.2 ' TWO-WAY STOP CONTROL SUMMARY Intersection: cambridge/imago Analyst: matt Project No.: 0045 Date: 1/4/01 East/West Street: imago North/South Street: cambridge Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement 1 2 3 1 4 5 6 L T R I L T R Volume 95 115 105 295 Hourly Flow Rate, HFR 105 127 116 327 Percent Heavy Vehicles -- -- 0 -- -- Median Type TWLTL RT Channelized? Lanes 1 0 1 1 Configuration TR L T Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement 7 8 9 1 10 11 12 L T R I L T R Volume 4b du Hourly Flow Rate, HFR 50 88 Percent Heavy Vehicles 0 0 Percent Grade M 0 0 Median Storage 1 Flared Approach: Exists? No Storage RT Channelized? Lanes 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement 1 4 1 7 8 9 1 10 11 12 Lane Config L I LR I v tvpn) i�u ��Q C(m) (vph) v/c 1348 0.09 650 0.21 n ¢ t �ZS!Z,G� 95% queue length 0.21 0.87 L1�P• Control Delay 7.9 12.0 Delay A 12.0 Z S3 s! Approach Approach LOS B V 71 3 HCS: Unsignalized Intersections Release 3.2 L U 5 A Matthew J. Delich, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Phone: (970) 669-2061 Fax: (970) 669-5034 E-Mail: mdelich@frii.com TWO-WAY STOP CONTROL(TWSC) ANALYSIS U22M"I F cc W J W z Celestica Colorado CK CREEK HP West HP East Access Access - N HRO ARIVIOAD Imago A B Roa A W 0 G LLI m Q Road B Road C [E] I I SHORT RANGE (2007) GEOMETRY F Legend: — - Denotes Lane Figure 12 N � N N 0 0 �- 320/595 1O f 1025 1775 1 � % 100/200 280/105 --� t I 1575/1650 -� o 0 0 120/235 ,4 C:) rn r, N o W) o '%-165 135 -15/80 ,r-- 20/75 95/55 -j 75/25 5/5 ----N Celeatica Colorado HP West HP East Access Access 65/15 \o '*A-120/20 —1380/2090 HARMONY N �' N f 1355/1475 L r-75/10 ROAD 130/4' 120/45 `� 1 f I 135/15 -1 } 1850/1940 0 0 0 1475/1905 — un o 0 350/50 265/150 to U-)� N Nk-80/280 L r-45/135 Ul) M n A B ` r Imago o LO C 25/165 CO M � NOM. ) + �, 10/5 Ro 15/105 f A NOM. } NOM. -A o =' � z\�n O } n Z�'� Ua W ' � N r � � n� CREEK 25/130-! } 20/100--,� o 0 o C-4 m W Fr w C mQ 15/0 D U t0/4ogo N N � %�Ro g In 50/90 ed o 1 —10/5 nRoad C�� 1 � - 35/65 70/65 SHORT RANGE (2007) TOTAL PEAK HOUR TRAFFIC E 15/95 ---7 -, t r 5/10 — Ln Ln o F 15/75 L o 1 Ln N O � M N \n n 0 20/10 —10/5 f- 25/10 10/15 --r 1 T r 35 150 -� o o u\i o� AM/PM Rounded to the Nearest 5 Vehicles. Figure 10 APPENDIX A CO C7 C) O 00 0 a 0 J 0 0 0 z a J W O� J W 0 w a z W lJn V N n N N W a U J W 0 W E d Cr) O LO o� CD CO O r• rn u_ CD O N rn co co O r rn W 0 x a z W W z 5 z W z 0 a a 0 a (A z Q Ix - oif LL 4 Q 2 TO: Michael Bello, HP Angie Milewski, BHA Dennis Armstrong, MBA John Tufte, JR Engineering City of Fort Collins FROM: Matt Delich ��t1 DATE: January 4, 2001 SUBJECT: HP HTP PDP - Traffic Impact Study revised pages (File: 0045ME04) Figures 10 and 12 of the HP Harmony Technology Park PDP Traffic Impact Study," November 2000, did not show the Cambridge/Imago intersection. Appendix A contains new versions of Figure 10 and Figure 12 that can be substituted in the cited traffic study. In the short range future, this intersection will be a full movement intersection with stop sign control on the Imago leg. As indicated in the cited traffic study, this intersection will be converted to a right-in/right-out intersection when alternative access is acquired to the Imago site by extending Road A to the east of Cambridge Avenue. With the interim stop sign control, this intersection will operate as indicated in Table 1. Calculation forms are provided in Appendix B. This intersection will operate acceptably. TABLE 1 Short Range Total Peak Hour Operation Intersection Movement Level of Service AM PM Cambridgetimago (stop sign) WB LT/RT B D SB LT A A OVERALL A B