Loading...
HomeMy WebLinkAboutHARMONY TECH. PARK, HEWLETT-PACKARD - PDP - 12-97D - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTS�cow.ww�i a•. NEIGHBORHOOD INFORMATION MEETING for Project: City of Fort Collins Meetina Location: Date: 1 Attendees: Please sign this sheet. The information vrZll be used to update the project mailing list and confirm attendance at neighborhood meetings. Contact the Planning Department (221-6.750) if you «ish to receive minutes of this meeting. Did ]'ou Receive Written Notification of this meeting? Correct address. Name Address Zip Yes No Yes No �l�$ tL i Ne N V ^� V r. Commis Planning and Environmental Wices Current Planning City of Fort Collins October 11, 2000 Dear Resident: On Wednesday, November 1, 2000, from 7:00 p.m. to approximately 9:00 p.m. at Preston Junior High School*, 4901 Corbett Drive, the City of Fort Collins Planning Department will conduct a neighborhood information meeting to discuss a development proposal in your neighborhood. The potential applicant, Hewlett-Packard, is proposing a master plan for about 1.5 million square feet of employment/office and some light industrial uses in a campus setting on approximately 107 acres. The initial Project Development Plan to be submitted to the City for review will be for about 750,000 square feet in six (6) buildings on approximately 50 acres. The property is part of the Harmony Technology Park Overall Development Plan. It is located on the south side of East Harmony Road and is south and east of the existing Celestica facility (see attached vicinity map). It is in the HC — Harmony Corridor Zoning District. Any development request, when made, must comply with the requirements and standards as set forth in the Cites LAND USE CODE. The purpose of this meeting on November 1st is to give all participants the opportunity to ask questions of the applicant and express their concerns in an informal setting.No formal development review request has been made by Hewlett-Packard to the City at this time and no decisions will result from this meeting. Representatives of various City Departments, as well as representatives for the applicant, will be present to respond to questions about the proposed development, City policies and regulations, and to take minutes of the meeting. The list of affected property owners for this public information meeting is derived from official records of the Larimer County Assessor. Because of the Lag time between home occupancy and record keeping, or because of rental situations, a few affected property owners may have been missed. Please feel free to notify Your neighbor of this pending meeting so all neighbors may have the opportunity to attend. If you are unable to attend this meeting, written comments are welcome. If you have any questions regarding this matter, please call our office at 221-6750. Sig erely, PAL S eph n Olt City Planner SO/gjd *The City of Fort Collins will make reasonable accommodations for access to City services, programs, and activities and will make special communication arrangements for persons with disabilities. Please call 221-6750 for assistance. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020 n u 12. Question: The construction of some of the streets will begin next spring, is that correct? Can a farmer farm that land then? Answer: That is not yet determined. 13. Question: Will there be transit stops in the area? Answer: Yes, but we do not know where yet. 14. Question: What type of parking lot and building lighting are you proposing? Answer: The lighting will provide for cut-offs and shielding to meet City Code, so that glare and spillage will not occur. 15. Question: Would HP build a building and not use it, maybe leasing it out to someone else? Answer: That may be considered. 16. Question: How many people will be in a 150,000 square foot building? Answer: There could be 600 to 700 employees. 17. Question: How many employees from the Greeley facility are being moved to Fort Collins? Answer: All 650 +/- employees. 18. Question: Is HP planning to use any portion of the 160 acre campus for outsourcing? Answer: Probably not, but that could happen. 19. Question: Is there any room for Celestica to expand? Answer: We think they have land to expand to 2 times the size of their existing facility. 4 5 C'] FA 1.1 9 10 11 Question: Have any attempts been made to direct people out on Technology Parkway only, and not use County Road 9? Answer: HP is trying to encourage most use on Technology Parkway. The Colorado Department of Transportation (CDOT) also has a concern. However, Technology Parkway is a lot of road to build without buildings associated with it. Question: Who will pay for necessary improvements to Harmony Road? Answer: HP will be responsible for their share just as other development in the area will be responsible for their share. Question: Will any manufacturing occur here? Answer: At this time the first phase of development is planned to be pure office buildings and uses. Question: Will there be any fencing around the complex? Answer: No. All security will be right at the buildings. Question: What will the work shifts be? Will there be any night work? Answer: The night shifts & work will be minimal. Question: Do you have any building elevations yet? Answer: No, not yet, but we will soon. Comment: There are concerns about excessive noise from possible manufacturing into the neighborhoods. Response: We will address this with our development plan. HP wants to be a good neighbor. Question: A commercial area that is shown on the Harmony Technology Park, ODP is not shown on your overall plan. Answer: That is a 7 acre site that is reserved for "secondary" uses in the Harmony Corridor. City of Fort Collins PROJECT: DATE: APPLICANT: Commuy Planning and Environmental *vices Current Planning NEIGHBORHOOD INFORMATION MEETING MINUTES Hewlett-Packard @ Harmony Technology Park November 1, 2000 Hewlett-Packard CITY PLANNER: Steve Olt l* The developer is proposing an office and research & development project located on the south side of East Harmony Road, east of County Road 9, north of County Road 36, and west of Cambridge Avenue. The proposal is, ultimately, for a total of 1.5 million square feet of floor area in multiple buildings on approximately 160 acres. The existing Celestica facility is adjacent to the west. The property is part of the Harmony Technology Park, Overall Development Plan (ODP) and is in the HC — Harmony Corridor Zoning District. QUESTIONS, CONCERNS, COMMENTS 1. Question: How will the phasing of this development happen? Are Buildings A & B proposed to go up first? Answer: Buildings A & B are not necessarily going to be Phase 1. That is yet to be determined. 2. Question: What is the primary road to be used to serve the HP employees? Answer: We are not sure of the answer to that question until we know the phasing. 3. Question: How many vehicles per day per building will be generated? Answer: We are still trying to define HP's needs. 281 North College Avenue • PC. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020 sites will be the responsibility of the property owner, but will also be governed by the covenants prepared by the Office Park Association. (iv) Since the ultimate user of each of the parcels is not yet known, it is difficult to estimate the number of employees for the PDP site. We have estimated the number of employees based on Hewlett-Packard projections for buildings that they might occupy. Based on this estimate, the 750,000 s.f. proposed for office/R&D use would result in approximately 4000 employees. (v) Key Site Data: a. Parcel Size: approximately 61.3 acres b. Proposed Uses: Office 80%, R & D 20%. Included in these percentages would be the potential for accessory and supporting uses which would fall within the secondary use category of the H-C Zone District ( e.g. Coffee shop, travel agent, laundry, food service, print shop etc.) Secondary uses may be open to the public but will be intended to be primarily support for the primary use of office. c. Zoning: H-C zone district. An existing Overall Development (ODP) Plan is in place on the property and the Planning and Zoning Board recently approved an amended ODP for the site. d. Location: The property is located south of Harmony Road between Technology Parkway and Cambridge Avenue. e. Proposed square footage of this phase: 750,000 SF (vi) This project is currently being reviewed as a `Pilot Project'. We are not aware of any variance to the Land Use Code requirements. (vii) There are no wetlands or natural areas on the PDP site. Hewlett-Packard has been working with the adjacent residences along Cambridge Avenue over the past few years during the ODP process in 1997, during the construction of the Celestica project, and during the amended ODP process this summer. In order to minimize initial impacts to these existing homes, the alignment of Cambridge Avenue has been proposed entirely on the Harmony Technology Park property with this submittal. A portion of the site detention has been designed along the north portion of the Cambridge Avenue alignment to allow for a green buffer between the residences and the proposed office buildings. A landscaped berm is proposed along the remainder of the Cambridge Avenue frontage. (viii) A neighborhood meeting was held prior to the submittal of the PDP. Few concerns were raised during the meeting, most neighbors were simply interested in the timing of the project and the land uses proposed. We have shown the alignment of Cambridge Avenue to occur within the PDP property to minimize impacts on the existing residential properties in this area. (ix) This is a Project Development Plan submittal for a portion of the Hewlett- Packard Harmony Technology Park. It is a portion of the Amended Overall Development Plan for the Harmony Technology Park approved by the Planning and Zoning Board in September 2000, originally approved in July of 1997. 0 Hewlett-Packard Harmony Technology Park PDP Statement of Planning Objectives (i) The Harmony Technology Park is approximately 155 acres in size. Of this total area, Celestica currently occupies 30 acres. The remaining 125 acres is being master planned to accommodate future Hewlett Packard (HP) growth. This project represents the first phase of the buildout of the remainder of the campus. The project is located within the master -planned Harmony Corridor Plan Area, and fosters the uses prescribed within this plan as recommended by the Land Use Principles and Policies of City Plan. These principles and policies are further achieved by the following: Land Use Policies — The development is within the Harmony Corridor subarea, and complies with the standards and guidelines of this approved planning area. Transportation — The PDP provides the ability to construct multi -modal public street corridors that foster convenient transit alternatives, adequate transportation facilities, and achieve or exceed level of service standards for transportation. Additional transit stops may be added within the PDP area along these public streets if requested by the City Transit services (Transfort). Pedestrian and bicycle comnections have been illustrated as an integral part of the PDP plan. Economic Sustainability — The PDP development sets a framework to provide a positive climate for both local and new businesses by allowing the construction of up to 750,000 square feet of high-technology office and research/development uses. Environment — A natural areas study has been prepared for the PDP site and the surrounding adjacent sites to ensure protection of any adjacent natural areas. (ii) The Harmony Technology Park Amended PDP area generally consists of an open agricultural area. There are no natural areas or wetlands on the PDP site. A landscape buffer area has been shown along the north property boundary corresponding with the 80' Harmony Corridor landscape setback. Landscape buffers have also been shown between parking areas and adjacent public roads. A primary feature of the PDP plan is the development of a central pedestrian -oriented campus that provides easy walking connections between the buildings and to the adjacent public streets. A second large open space area has been proposed for an area southeast of the PDP area. This area will serve as detention for the majority of the site, and eventually for the remaining portions of the Harmony Technology Park master plan. By incorporating all of the detention in a single area, we hope to utilize the space as an amenity for potential recreational uses. (iii) The Harmony Technology Park site will be developed to provide office sites for Hewlett-Packard and for other potential office users. An Office Park Association will be developed for the entire master -planned Harmony Technology Park site and will take responsibility for maintenance of common open space areas within the site. Maintenance of individual office building 4 0 Hewlett-Packard Harmony Technology Park Modification Request The developers of the Harmony Technology Park project would like to request a modification to the Land Use Code in order to allow radius curb returns on the main visitor entrance drives into the site. Land Use Code section to be modified: The request would require modification to Section 3.6.2(L)(2)(e): 'The connection of a private drive with a public street shall be made with a driveway cut using a "New Driveway Approach " in accordance with city street standards. How would the proposal differ from the standard? The driveway approach referenced in this Land Use Code section affects driveway connections to public roads. The standard requires a 'curb cut' type of driveway connection rather than a curb return with a radius. For the Harmony Technology Park site, the applicant requests use of a curb return radius on the primary visitor entrance drives into the building sites. The request is being made in order to differentiate the primary visitor access points from the secondary and service access drives in the business park. The secondary and service drives would maintain the 'curb cut' approach as specified in the standard. Why can the standard not be met? There is no reason the standard cannot be met. The applicant is simply requesting an alternative driveway connection design. What problems may result from modification of the standard? There are no problems that would result from the use of the curb return radii. What health, safety or welfare problems would be created by the modification? There are no health, safety, or welfare problems that would be created by the use of a curb return radius. The radius requested would be a small radius (15'), so would not allow high speeds at the intersection. In addition, this is a modification request of the older 'Design and Construction Criteria, Standards and Specifications for Streets, Sidewalks, Alleys and other Public Ways'. The newly adopted Urban Area Street Standards would actually require these drives to have a 15' curb radius since they would be considered 'High Volume Driveways'. A high -volume driveway is considered one that serves a minimum of 350 vehicle trips per day. Based on our traffic study, all of these main visitor access drives will serve between 300 and 400 vehicle trips during the peak hours only. Therefore, the drives would certainly exceed the minimum of 350 vehicle trips per day under this new standard. C. This specific section of the LUC is in conflict with the recently adopted LCUASS and City Staff intends to enact a future code change to the LUC to reference the LCUASS for private drive design requirements. RECOMMENDATION: A. Staff recommends approval of the modification request to section 3.6.2(L)(2)(e) subject to the following condition: The design and construction of all driveways in the development proposal shall comply with the Larimer County Urban Area Street Standards. Staff finds that the granting of this modification request does not impair the intent and purposes of the LUC. This specific section of the LUC is presently in conflict with the criteria specified in the Larimer County Urban Area Street Standards (LCUASS), which was adopted on January 2, 2001 and required to be enforced on all new development projects submitted after March 1512001. The LCUASS allows the use of the radius style driveway approach given traffic volumes for the driveway exceeds 350 trips per day. In fact, any driveway out to an arterial street requires the radius style driveway approach, which is a direct conflict with this section of the LUC. The "New Driveway Approach" referenced in the LUC refers to Standard Drawing D-15 in the Design and Construction Criteria, Standards and Specifications for Streets, Sidewalks, Alleys and Other Public Ways, this is the previous engineering design standards manual. This manual was adopted in July 1996 but is now replaced by the LCUASS. In the LCUASS, a Type I or Type II driveway is considered the "New Driveway Approach" as referenced in the LUC. A granting of this modification allows the option of the radius style design, which is considered a Type III or Type IV driveway in the LCUASS. Attached are the details for the drawings in both the LCUASS and the previous engineering design standards manual. The criteria supplied by the applicant shows that the threshold is reached where the Type III driveway use is allowed. City Staff concurs with the applicant on this modification request. Because of this conflict between documents, City Staff intends to revise the LUC to reference the LCUASS with regards to this section of code. Until then, modifications of this section of code may appear on other development proposals before the Planning and Zoning Board. City Staff will support the granting of the modification so long as the modification complies with the LCUASS. Therefore the Engineering Department is in support with the modification request although would desire to place the following condition on the modification: The design and construction of all driveways in the development proposal shall comply with the Larimer County Urban Area Street Standards. FINDINGS OF FACT/CONCLUSION: A. The requested Modification of Standards for Hewlett-Packard at the Harmony Technology Park, Project Development Plan - #12-97D is subject to review by the Planning and Zoning Board. B. Granting the requested modification would not be detrimental to the public good and would protect the public interests and purposes of the standard for which the modification is requested equally well as there is virtually no functional difference between a radius curb intersection of a private drive and a driveway cut intersection of a private drive, provided the design and construction is in compliance with the LCUASS. (2) the granting of a modification from the strict application of any standard would result in a substantial benefit to the city by reason of the fact that the proposed project would substantially address an important community need specifically and expressly defined and described in the city's Comprehensive Plan, adopted policy, ordinance or resolution (such as, by way of example only, affordable housing or historic preservation) or would substantially alleviate an existing, defined and described problem of city-wide concern (such as, by way of example only, traffic congestion or urban blight), and the strict application of such a standard would render the project practically infeasible; or (3) by reason of exceptional physical conditions or other extraordinary and exceptional situations, unique to such property, including, but not limited to, physical conditions such as exceptional narrowness, shallowness or topography, or physical conditions which hinder the owner's ability to install a solar energy system, the strict application of the standard sought to be modified would result in unusual and exceptional practical difficulties, or exceptional or undue hardship upon the owner of such property, provided that such difficulties or hardship are not caused by the act or omission of the applicant." The applicant has proposed that the modification of the standard meets the requirements of Section 2.8.2(H)(2) of the LUC. APPLICANT'S REQUEST The applicant has proposed that the modification requests meet the requirements of the LUC 2.8.2 Modification Review Procedures (H) Step 8 (Standards). Please see the attached written justification by the applicant and supporting documentation by the traffic consultant. ANALYSIS OF MODIFICATION REQUEST (A) Modification Request #5 — Section 3.6.2 (L)(2)(e) requires that a connection of a private drive with a public street shall be made with a driveway cut using "New Driveway Approach" in accordance with city standards. The applicant proposes to connect the private drives to public streets using a radius style driveway intersection rather than a driveway cut. The applicant has proposed to City Staff to consider this modification because the radius style driveway helps distinguish the primary visitor entrance drives into the building sites and differentiates these access points from the secondary and service drives in the project. Commu& Planning and Environmental Wices Current Planning Citv of Fort Collins MEMORANDUM Date: March 15, 2001 To: Planning and Zoning Board Members From: Stephen Olt, City Planner Marc Virata, Civil Engineer Re: Modification of Standards for the Hewlett-Packard at the Harmony Technology Park, Project Development Plan - #12-97D Staff recommends that the following supplemental information and recommendation regarding a modification request to Section 3.6.2(L)(2)(e) of the Land Use Code (LUC) for the Hewlett-Packard at the Harmony Technology Park, Project Development Plan - #12-97D be included as part of the Staff Report and Recommendation to the Planning and Zoning Board for the March 15, 2001, public hearing: MODIFICATION REQUEST — PERTINENT CODE SECTIONS This request is for modification to the following section of the LUC: Section 3.6.2 Streets, Streetscapes, Alleys and Easements (L) Private Drives (2) Design Requirements (e) states: "The connection of a private drive with a public street shall be made with a driveway cut using a "New Driveway Approach" in accordance with city street standards." As specified in Section 2.8.2 Modification Review Procedures, (H) (Standards), the Planning and Zoning Board shall review, consider, and approve, approve with conditions or deny an application for a modification based upon: "... the granting of the modification would neither be detrimental to the public good nor impair the intent and purposes of this Land Use Code; and that: (1) the plan as submitted will advance or protect the public interests and purposes of the standard for which the modification is requested equally well or better than would a plan which complies with the standard for which a modification is requested; or 2N1 North College Av enue • P0. Boy 581) • Fort Collin;, CO 80522-0:580 • (970) 221-6750 • FAX (9-0) 416-2020 REPRESENTATIVE PLANT MATERIALS LIST w aar��r� 4e+r� y Lr wrY ey 1f....e..rrr.rsr rum m _p. rm- o�.y.w�•�. r...r4r.rw.suw _ww+ram rwr.e.rr. ur- m wy. Kew f�rwr �rr�rrY Yuma m 1m Pw wow Uri. !T nbwM^ tlrr�4r� Gr. • OG tO rrr �� 4wry �Mrmy�eY �4rr 4n. ♦OG rw��r�mrp� fi.v�f Vim. Ysw Wvr� L u� ^Y 1rw.w�. euyr' r4�q.C�vr Cif fwa y� u�rrur yrrr' lrryy Wruu�� f4w fwi •Oc MrfY®rbmCO N re..r .ryf f�a rME f rm. oc rp+rs Lr�w�� Vrw um rsr� r ew.. n�• wa..�ut'� •4rdr fea. OOc LEGEND - 0 /1 inu�i NORTH 0 10' NI' r10' ��tt--�� 1Kd�,Ref PROJECT DEVELOPMENT PLAN PROTOTYPICAL BUILDING: PLANTING PLAN HEWLETT-PACKARD COMPANY HARMONY TECHNOLOGY PARK ��� FORT COLLIIV3, COLO RADO SHEEP 6 OF 6 JANUARY 23. 2001 I1 Ir'lu I NORTH 0 24 SO IN, PROJECT DEVELOPMENT PLAN LANDSCAPE PLANS FOR SE DETENTION POND HEWLETT-PACKARD COMPANY HARMONY TECHNOLOGY PARK FORT COLLINS, COLORf1.D0 SHEET S OF 6 IANUARY 23. 2001 No Text NINE No Text PLANT MATERIALS LIST mow. '. ....... ..w a.re.....++ ..n�..cw•� r.w„ rein r ois rw r w y: m 1w�r. N^Y'•M.an� ny nwn. WyO� 'ynI'Y� s.wWfy.+ u uy.Y�n. nw.v�w it n YY Wr M. �.MM Wr.' .uae+Ml>M�.Y� •uus CR .or_ n. s..�.. NnsY9naW� M.u�Np •O.Yr I'04 LANDSCAPE CATEGORIES nwn MMY 6wl.lY lWY I1LIY OY LANDSCAPE NOTES PROJECT DEVELOPMENT PLAN PLANTING TABLE AND NOTES HEWLETT-PACKARD COMPANY HARMONY TECHNOLOGY PARK FORT COLLIN S, COLORADO d c>i`o SHEET 1 Oy 6 JANUARY 23. 2001 9' utmty _ Easement N01l.ILL eY�Y1�P1lIRMtlR ewrn Wtt �wrrpRn I� gnu NORTH R ZT 30 IM PROJECT DEVELOPMENT PLAN SITE PLANS FOR BUILDINGS E B. F HEWLETT-PACKARD COMPANY HARMONY TECHNOLOGY PARK FORT COLLIN S, COLORADO SHEET 4 OF 4 JANUA NY 23. 2001 Wluuuu111111 �, � It^ E� tl11J11lIIOIIIIIIH1111114� rrc,.ra C /1 ini %ORTH 0 2 00 10tl PROJECT DEVELOPMENT PLAN SITE PLANS FOR BUILDINGS C & O HEWLETT-PACKARD COMPANY HARMONY TECHNOLOGY PARK FORT COLLIN S, COLORADO SHEET 3 OF a 20 JANUARY 23. 01 B i u i aoara a zr sa 1a' PROJECT DEVELOPMENT PLAN SITE PLANS FOR BUILDINGS AY,. B IIEWLETT-PACKARD COMPANY HARMONY TECHNOLOGY PARK FORT COLLINS, COLORADO SHEET 2 OF a JANUARY 23. 2001 LEGAL DESCRIPTION HARMONY TECHNOLOGY PARK NE DRLM A TRACT L L/ LDCCTED IN THE NORI4 V =AweR Ca 3E01IW I, TQI WB 6 WJRTII. RAKE 60 U $T Cf R£ 81%TJ PRINCIPAL I•IERIDIAN, GTT 6 0. C LINS. LARMR CNi CQCRCLV m��i —M�� � V� dw �ll�nuNlu�l. PeuaeVb Y NOTES LAND USE DATA . ene2R rwro +Awfw. cweec w • �molw gem». nw+meE . eowee .w dlDq uM navcab )Vc�se •yVe. 42IiAfLOI.IYp ]� ]Y4WM N. M1YI ACIIe/ �RGcw y. KIaO M. . 1—TR 1L I.L y .wsm.a�. .o...m V,•»AEau . u1Y2 aRA Nq 1..1u }Y)yl1.,. 1 Iwco w4 __ +mx..slwssewwwE )an .x•m..wfwe 4•rAe w VZCZN ITY MAP OWNERSHIP CERTIFICATION 6 roPPcwaR].DOaaSc'waaD�ww Tw '.6 IaIN IY�Ib 0o Ni.ycil.' ]...] INE AECMr m raarnlow A)o IceTwenwe aar ]aeul w wo E.enAu oce�o+IRn.L.N er. 4TAm oT.xaw.w� w2 �m �N]ImEeu .w.vm/r'."" .oacvaoom amola: R o m_wT 41eea4xE w row. eoolE � vro_ ow Ir •.�now.� rc.+fwaw e]meea DIRECTOR OF PLANNING APPROVAL e. A! OeICTA w RINNO (1 T•C Em p Iww] G0.LM, C0.AACO w tue_ C.� 0 AD.� PROJECT DEVELOPMENT PLAN SITE PLAN DATA HEWLETT-PACKARD COMPANY HARMONY TECHNOLOGY PARK FORT COLLINS, COLORADO r�_�4aa gE SHEET 1 OF 4 JANUARY 23. 2001 VICINITY MAP 11/22/00 #12-97D Harmony Tech Park Hewlett Packard PDP Type II LUC Hewlett Packard at the Harmony Technology Park, P.D.P., 12-97D March 15, 2001 P & Z Meeting Page 6 to" lines, as set forth in Section 3.5.3(B), has been addressed by the Campus Exception as set forth in Section 4.21(E)(3)(b). 4. Neighborhood Information Meeting The Hewlett-Packard at the Harmony Technology Park, PDP contains proposed land uses that are permitted as Type II uses, subject to a Planning and Zoning Board review. The proposed uses are office and research & development, with some accessory or supporting secondary uses contained in the six primary buildings. The LUC does require that a neighborhood meeting be held for a Type II development proposal and a neighborhood meeting was held on November 1, 2000 to discuss this proposal. A copy of the minutes of the meeting is attached to this staff report. FINDINGS OF FACT/CONCLUSIONS After reviewing the Hewlett-Packard at Harmony Technology Park, Project Development Plan, staff makes the following findings of fact and conclusions: 1. The PDP, including the proposed Primary and Accessory land uses, is consistent with the approved Harmony Technology Park, Amended ODP. 2. The proposed land uses are permitted in the HC — Harmony Corridor District. 3. The Project Development Plan complies with all applicable district standards of Section 4.21 of the Land Use Code, HC zone district. 4. The Project Development Plan complies with all applicable General Development Standards contained in Article 3 of the Land Use Code. RECOMMENDATION: Staff recommends approval of the Hewlett-Packard at the Harmony Technology Park, Project Development Plan - #12-97D. Hewlett Packard at the Harmony Technology Park, P.D.P., 12-97D March 15, 2001 P & Z Meeting Page 5 2. Section 3.2.2, Access, Circulation and Parking a. The proposal complies with Section 3.2.2(C)(4)(a) in that it provides secure and convenient bicycle parking located near the entrances to the six buildings. b. The proposal complies with Section 3.2.2(C)(5)(a)&(b) in that it provides direct, safe, and continuous walkways and bicycle connections to major pedestrian and bicycle destinations in the surrounding area. Where it is necessary for the pedestrian walkways to cross drive aisles the pedestrian crossings shall be enhanced to emphasize and place priority on pedestrian access and safety. c. The proposal complies with Section 3.2.2(K)(2)(a)&(b) and Section 3.2.2(K)(4) in that the project will provide parking at a ratio of 0.75 spaces per employee for the proposed General Office and Research & Development (Industrial) uses. B. Division 3.3, Engineering Standards 1. Section 3.3.5, Engineering Design Standards The proposal complies with the design standards, requirements, and specifications for the services as set forth in this section. C. Division 3.5, Building Standards 1. Section 3.5.1, Building and Project Compatibility The proposal ensures that the physical and operational characteristics of the proposed buildings and uses are compatible when considered within the context of the surrounding area. It complies with the standards and requirements as set forth in this section of the LUC. 2. Section 3.5.3, Mixed -Use, Institutional and Commercial Buildings The proposal complies with the standards of this section that are intended to promote the design of an urban environment that is built to human scale to encourage attractive street fronts and other connecting walkways that accommodate pedestrians as the first priority, while also accommodating vehicular movement. The requirement for the buildings to meet the "build- Hewlett Packard at the Harmony Technology Park, P.D.P., 12-97D March 15, 2001 P & Z Meeting Page 4 The PDP meets the applicable Development Standards, more specifically: 1. Section 4.21(E)(1) Harmony Corridor Development Standards. This development proposal complies with the Harmony Corridor design standards as adopted by the City and is in conformance with the policies of the Harmony Corridor Standards and Guidelines. 2. Section 4.21(E)(2) Site Design. The proposal complies with Section 4.21(E)(2)(b) in that this large employment -based facility will provide for 350' to 450' building setbacks from Cambridge Avenue, to the east, and 500' to 600' separations from the office and research & development buildings on this site to the existing residential structures to the east of Cambridge Avenue. The new buildings will be only 3 stories in height, with substantial berming and landscaping along the east property line. There will be no drastic or abrupt change in scale and height of buildings. 3. Section 4.21 (E)(3) Building Design. The proposal complies with Section 4.21(E)(3)(b) in that it provides for a campus -like setting, with unifying internal pedestrian -oriented, non - vehicular outdoor spaces and walkways that organize and connect the six buildings without pedestrians having to make multiple or excessive street or driveway crossings. 3. Article 3 of the Land Use Code — General Development Standards The Project Development Plan complies with all applicable General Development Standards, more specifically as follows: A. Division 3.2, Site Planning and Design Standards 1. Section 3.2.1, Landscaping and Tree Protection The proposal ensures that this development proposal provides significant canopy shading to reduce glare and heat build-up, that it contributes to the visual quality and continuity within and between developments, and that it complies with this section of the LUC. Hewlett Packard at the Harmony Technology Park, P.D.P., 12-97D March 15, 2001 P & Z Meeting Page 3 parcel is designated for Primary Uses. Offices and research & development facilities are included in the list of allowable primary uses. Food service, travel agency, coffee shop, or similar service/retail uses are allowable accessory uses that are supplemental to the primary uses. 2. Division 4.21 of the Land Use Code — Harmony Corridor District The proposed office (80%) and research & development (20%) uses in six buildings, each exceeding 80,000 square feet of gross leasable area, are permitted in the HC zone district subject to a Planning and Zoning Board review. Included in the land use percentages is the potential for accessory and supporting uses which would fall in the Secondary Uses category of the HC District. The secondary uses may include coffee shop, travel agent, laundry, food service, print shop, etc.; and, they would be open to the public but will be intended to be primarily support for the permitted primary office use. The buildings will range in size from 100,000 to 140,000 square feet. The PDP meets the applicable Land Use Standards, more specifically: Section 4.21(D)(1) Harmony Corridor Development Standards. This development proposal complies with the Harmony Corridor land use and locational standards as adopted by the City and is in conformance with the policies of the Harmony Corridor Plan. 2. Section 4.21(D)(2) Secondary Uses. The proposed secondary uses in this development will be accessory and supporting in nature, will conform to the accessory uses as approved with the Harmony Technology Park, Amended ODP, and will not occupy more than 25% of the gross area of this development plan or the amended ODP. 3. Section 4.21(D)(3) Dimensional Standards. a. The proposal complies with Section 4.21(D)(3)(a) in that the maximum building height proposed is 3 stories. b. The proposal complies with Section 4.21(D)(3)(b) in that the PDP is going through a Planning and Zoning Board review due to all six buildings exceeding 80,000 square feet in size. Hewlett Packard at the Harmony Technology Park, P.D.P., 12-97D March 15, 2001 P & Z Meeting Page 2 standards located in Division 4.21 Harmony Corridor (HC) of ARTICLE 4 — DISTRICTS. Offices, research & development facilities, and accessory uses are permitted in the HC — Harmony Corridor Zoning District, subject to a Planning and Zoning Board (Type II) review. The purpose of the HC District is: "..... to implement the design concepts and land use vision of the Harmony Corridor Plan — that of creating an attractive and complete mixed -use area with a major employment base." This proposal complies with the purpose of the HC District as it provides additional major employment -based primary uses, with some small-scale accessory uses, in the Harmony Corridor in conformance with an approved mixed -use ODP for a 267 acre compilation of land. This proposed new development will be on a vacant parcel and will tie into and utilize existing roadways, utilities, and services in the area. COMMENTS: Background The surrounding zoning and land uses are as follows: N: HC; existing office, research & development, industrial (Hewlett-Packard and Agilent facilities) S: HC; vacant land (a portion of Parcel E of the Harmony Technology Park, Amended ODP) E: HC; vacant land and existing single family residential in Larimer County W: HC; vacant land and existing office & industrial (Celestica) The property was annexed into the City of Fort Collins as part of the Harmony Farm Annexation in July, 1994. The property was part of Parcel A of the Harmony Technology Park, ODP approved by the Planning and Zoning Board in August, 1997. This parcel was designated as Mixed -Use, to potentially include office and light manufacturing. The property is part of Parcel E of the Harmony Technology Park, Amended ODP approved by the Planning and Zoning Board in September, 2000. This ITEM NO. 19 MEETING DATE 3/15/0 iiA STAFF Steve Olt Citv of Fort Collins PLANNING AND ZONING BOARD STAFF REPORT PROJECT: Hewlett-Packard at the Harmony Technology Park, Project Development Plan - #12-97D APPLICANT: BHA Design, Inc. c/o Angie Milewski 4803 Innovation Drive Fort Collins, CO.80525 OWNER: Hewlett-Packard Company c/o Mike Bello 3404 East Harmony Road Fort Collins, CO. 80525 PROJECT DESCRIPTION: This is a request for 750,000 square feet of office and research & development uses in six buildings on 61.3 acres. The property is located on the south side of East Harmony Road, east of County Road 9, north of County Road 36, and west of Cambridge Avenue. The existing Celestica facility is adjacent to the west. The property is part of Parcel E of the Harmony Technology Park, Amended Overall Development Plan (ODP) and is in the HC — Harmony Corridor Zoning District. RECOMMENDATION: Approval EXECUTIVE SUMMARY: This Project Development Plan (PDP) complies with the applicable requirements of the Land Use Code L( UC), more specifically: the process located in Division 2.2 - Common Development Review Procedures for Development Applications of ARTICLE 2 - ADMINISTRATION; standards located in Division 3.2 - Site Planning and Design Standards, Division 3.3 — Engineering Standards, and Division 3.5 - Building Standards of ARTICLE 3 - GENERAL DEVELOPMENT STANDARDS; and COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box580 Fort Collins, CO80522-0580 (970)221-6750 PLANNING DEPARTMENT